Standard Satuan Harga

Daftar Data Standart Harga Perencanaan Pemerintah Kota Medan

Showing 61-80 of 69,568 items.

Standard Satuan Harga

* Resize table columns just like a spreadsheet by dragging the column edges.
#TahunKode SSHNama BarangSpesifikasiHarga SatuanSatuanStatusAksi
  
6120182.9.1.12.4.331Water HeaterAriston, tank protection, Listrik 220 V. PRO ECO 100 V/H6.450.184,00 Tidak Dipakai
6220182.9.1.12.4.332Water HeaterAriston, tank protection, Listrik 220 V. PRO ECO 80 V/H5.557.474,00 Tidak Dipakai
6320182.9.1.12.4.333Scrubber &Polisher KW 18-302+E9477Power 1800W,220/50 volt, 154 speed rpm,18 inch base plate diameter,80 weight,1280 polishing head rotation speed, 12 lenght gf cable meter,2x20 weighting iron25.592.790,00 Tidak Dipakai
6420182.9.1.12.4.334Hotel Serving cart largeKW 18-92:1480X550X13004.717.193,00 Tidak Dipakai
6520182.9.7.1.2.84Ozone stove assembled (O3) incl UV-lamp(belum diset)26.606.630,00 Tidak Dipakai
66201820.1.1.9.1.130PLAT 4 m/m(belum diset)1.294.647,00 Tidak Dipakai
67201820.1.1.9.1.713Engsel pintu nilon uk 4"ARCH14.007,00 Tidak Dipakai
68201820.1.1.9.1.750Rotan uk.6M(belum diset)240.120,00 Tidak Dipakai
69201820.1.1.29.8.2Belanja Paving Block (Bag.Umum Setdakot Medan)150.000.000,00 Dipakai
70201820.1.1.44.161.211Rehabilitasi Sedang / Berat Gedung Kantor100.000.000,00 Tidak Dipakai
71201820.1.2.1.1.12Solar Industri (Non Subsidi)-14.750.000.000,00 Tidak Dipakai
72201820.1.6.1.5.1Beras (5 kg x 200 goni)17.000,00 Dipakai
73201820.2.1.2.26.8 Baut veer mukaBus FM48.500,00 Tidak Dipakai
74201820.2.1.2.26.9 Veer IBus FM80.000,00 Tidak Dipakai
75201820.2.1.2.26.10Tutup Lampu airBus FM32.500,00 Tidak Dipakai
76201820.2.1.2.26.11gasket chamberBus FM135.500,00 Tidak Dipakai
77201820.2.1.2.26.12kain panas pompa silinderBus FM151.000,00 Tidak Dipakai
78201820.2.1.2.26.13Kain panas Jantung vorsenellingBus FM87.000,00 Tidak Dipakai
79201820.2.1.2.26.14Kain panas vacum remBus FM80.000,00 Tidak Dipakai
80201820.2.1.2.26.15Karet pelindung vacumBus FM95.500,00 Tidak Dipakai