Standard Satuan Harga
Daftar Data Standart Harga Perencanaan Pemerintah Kota Medan
Showing 61-80 of 69,568 items.
Standard Satuan Harga
* Resize table columns just like a spreadsheet by dragging the column edges.
61 | 2018 | 2.9.1.12.4.331 | Water Heater | Ariston, tank protection, Listrik 220 V. PRO ECO 100 V/H | 6.450.184,00 | | Tidak Dipakai | |
62 | 2018 | 2.9.1.12.4.332 | Water Heater | Ariston, tank protection, Listrik 220 V. PRO ECO 80 V/H | 5.557.474,00 | | Tidak Dipakai | |
63 | 2018 | 2.9.1.12.4.333 | Scrubber &Polisher KW 18-302+E9477 | Power 1800W,220/50 volt, 154 speed rpm,18 inch base plate diameter,80 weight,1280 polishing head rotation speed, 12 lenght gf cable meter,2x20 weighting iron | 25.592.790,00 | | Tidak Dipakai | |
64 | 2018 | 2.9.1.12.4.334 | Hotel Serving cart large | KW 18-92:1480X550X1300 | 4.717.193,00 | | Tidak Dipakai | |
65 | 2018 | 2.9.7.1.2.84 | Ozone stove assembled (O3) incl UV-lamp | (belum diset) | 26.606.630,00 | | Tidak Dipakai | |
66 | 2018 | 20.1.1.9.1.130 | PLAT 4 m/m | (belum diset) | 1.294.647,00 | | Tidak Dipakai | |
67 | 2018 | 20.1.1.9.1.713 | Engsel pintu nilon uk 4" | ARCH | 14.007,00 | | Tidak Dipakai | |
68 | 2018 | 20.1.1.9.1.750 | Rotan uk.6M | (belum diset) | 240.120,00 | | Tidak Dipakai | |
69 | 2018 | 20.1.1.29.8.2 | Belanja Paving Block (Bag.Umum Setdakot Medan) | | 150.000.000,00 | | Dipakai | |
70 | 2018 | 20.1.1.44.161.211 | Rehabilitasi Sedang / Berat Gedung Kantor | | 100.000.000,00 | | Tidak Dipakai | |
71 | 2018 | 20.1.2.1.1.12 | Solar Industri (Non Subsidi) | - | 14.750.000.000,00 | | Tidak Dipakai | |
72 | 2018 | 20.1.6.1.5.1 | Beras (5 kg x 200 goni) | | 17.000,00 | | Dipakai | |
73 | 2018 | 20.2.1.2.26.8 | Baut veer muka | Bus FM | 48.500,00 | | Tidak Dipakai | |
74 | 2018 | 20.2.1.2.26.9 | Veer I | Bus FM | 80.000,00 | | Tidak Dipakai | |
75 | 2018 | 20.2.1.2.26.10 | Tutup Lampu air | Bus FM | 32.500,00 | | Tidak Dipakai | |
76 | 2018 | 20.2.1.2.26.11 | gasket chamber | Bus FM | 135.500,00 | | Tidak Dipakai | |
77 | 2018 | 20.2.1.2.26.12 | kain panas pompa silinder | Bus FM | 151.000,00 | | Tidak Dipakai | |
78 | 2018 | 20.2.1.2.26.13 | Kain panas Jantung vorsenelling | Bus FM | 87.000,00 | | Tidak Dipakai | |
79 | 2018 | 20.2.1.2.26.14 | Kain panas vacum rem | Bus FM | 80.000,00 | | Tidak Dipakai | |
80 | 2018 | 20.2.1.2.26.15 | Karet pelindung vacum | Bus FM | 95.500,00 | | Tidak Dipakai | |