1 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.6 |
Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0476 |
OH |
206.800,00 |
9.843,68 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4762 |
OH |
150.800,00 |
71.810,96 |
123.1.1.1.1.23 |
Tukang |
0.0952 |
OH |
177.500,00 |
16.898,00 |
|
|
|
|
Jumlah |
98.552,64 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
99.952,64 |
| 2020 | 24.2.5.6 | Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm | M1 | 99.952,64 | Tidak Dipakai | |
2 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.142 |
Rehabiltasi / Pemeliharaan Rambu Lalulintas |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.08 |
OH |
206.800,00 |
16.544,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.6 |
OH |
150.800,00 |
241.280,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
328.216,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.4 |
Cat Besi (Kilat) |
0.425 |
Kg |
76.100,00 |
32.342,50 |
117.1.1.1.6.18 |
Cat Meni Besi |
0.125 |
Kg |
50.700,00 |
6.337,50 |
117.1.1.1.6.83 |
Thinner |
0.5 |
liter |
18.600,00 |
9.300,00 |
132.3.2.13.1.109 |
Kertas Pasir Kasar |
0.2 |
lembar |
46.700,00 |
9.340,00 |
|
|
|
|
Jumlah |
57.320,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.38 |
Mobil Pick Up |
0.35 |
jam |
49.400,00 |
17.290,00 |
123.2.2.1.3.5 |
Alat bantu penyetelan rambu lalulintas |
1 |
LS |
20.100,00 |
20.100,00 |
|
|
|
|
Jumlah |
37.390,00 |
|
|
|
|
Nilai HSPK |
422.926,00 |
| 2020 | 24.2.6.142 | Rehabiltasi / Pemeliharaan Rambu Lalulintas | unit | 422.926,00 | Tidak Dipakai | |
3 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.75 |
Aggregat Penutup BURDA |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0506 |
OH |
150.800,00 |
7.630,48 |
|
|
|
|
Jumlah |
8.147,48 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.31 |
Chipping |
35 |
Kg |
300,00 |
10.500,00 |
|
|
|
|
Jumlah |
10.500,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.0241 |
jam |
513.600,00 |
12.377,76 |
123.2.2.1.2.44 |
Pneumatic Tyre Roller |
0.0011 |
jam |
653.700,00 |
719,07 |
123.2.2.1.2.64 |
Wheel Loader |
0.0177 |
jam |
844.500,00 |
14.947,65 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
29.444,48 |
|
|
|
|
Nilai HSPK |
48.091,96 |
| 2020 | 24.2.3.75 | Aggregat Penutup BURDA | M2 | 48.091,96 | Tidak Dipakai | |
4 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.43 |
Aggregat Penutup BURTU |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0003 |
OH |
150.800,00 |
45,24 |
|
|
|
|
Jumlah |
45,24 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.0042 |
jam |
513.600,00 |
2.157,12 |
123.2.2.1.2.64 |
Wheel Loader |
0.0001 |
jam |
844.500,00 |
84,45 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
3.641,57 |
|
|
|
|
Nilai HSPK |
3.686,81 |
| 2020 | 24.2.3.43 | Aggregat Penutup BURTU | M2 | 3.686,81 | Tidak Dipakai | |
5 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.74 |
Aggregat Penutup BURTU 1 |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0015 |
OH |
206.800,00 |
310,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0304 |
OH |
150.800,00 |
4.584,32 |
|
|
|
|
Jumlah |
4.894,52 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.31 |
Chipping |
23 |
Kg |
300,00 |
6.900,00 |
|
|
|
|
Jumlah |
6.900,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.0165 |
jam |
513.600,00 |
8.474,40 |
123.2.2.1.2.44 |
Pneumatic Tyre Roller |
0.0005 |
jam |
653.700,00 |
326,85 |
123.2.2.1.2.64 |
Wheel Loader |
0.0106 |
jam |
844.500,00 |
8.951,70 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
19.152,95 |
|
|
|
|
Nilai HSPK |
30.947,47 |
| 2020 | 24.2.3.74 | Aggregat Penutup BURTU 1 | M2 | 30.947,47 | Tidak Dipakai | |
6 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.34 |
Aggregat Utk. Lapis Pond. Jalan - Tanpa Penutup Aspal Utk. Pek. Minor |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0012 |
OH |
206.800,00 |
248,16 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0182 |
OH |
150.800,00 |
2.744,56 |
|
|
|
|
Jumlah |
2.992,72 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.66 |
Aggregat Base Course C |
1.2 |
M3 |
466.900,00 |
560.280,02 |
|
|
|
|
Jumlah |
560.280,02 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.1887 |
jam |
513.600,00 |
96.916,32 |
123.2.2.1.2.41 |
Pedestrian Roller |
0.0527 |
jam |
122.800,00 |
6.471,56 |
123.2.2.1.2.62 |
Water Tanker |
0.0141 |
jam |
525.600,00 |
7.410,96 |
123.2.2.1.2.64 |
Wheel Loader |
0.0085 |
jam |
844.500,00 |
7.178,25 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
119.377,09 |
|
|
|
|
Nilai HSPK |
682.649,84 |
| 2020 | 24.2.5.34 | Aggregat Utk. Lapis Pond. Jalan - Tanpa Penutup Aspal Utk. Pek. Minor | M3 | 682.649,84 | Tidak Dipakai | |
7 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.19 |
Anyaman Filter Plastik |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.04 |
OH |
206.800,00 |
8.272,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.08 |
OH |
150.800,00 |
12.064,00 |
123.1.1.1.1.23 |
Tukang |
0.04 |
OH |
177.500,00 |
7.100,00 |
|
|
|
|
Jumlah |
27.436,00 |
|
Bahan/Material: |
|
|
|
|
132.3.2.13.1.101 |
Filter Plastik |
1.05 |
M2 |
16.100,00 |
16.905,00 |
|
|
|
|
Jumlah |
16.905,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
45.741,00 |
| 2020 | 24.2.3.19 | Anyaman Filter Plastik | M2 | 45.741,00 | Tidak Dipakai | |
8 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.31 |
Anyaman Kawat Yang Dilas (Welded Wire Mesh) |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.03 |
OH |
150.800,00 |
4.524,00 |
123.1.1.1.1.23 |
Tukang |
0.01 |
OH |
177.500,00 |
1.775,00 |
|
|
|
|
Jumlah |
7.333,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.32 |
Besi Beton Polos |
1.1 |
Kg |
16.900,00 |
18.590,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.02 |
Kg |
34.882,00 |
697,64 |
|
|
|
|
Jumlah |
19.287,64 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
28.020,64 |
| 2020 | 24.2.4.31 | Anyaman Kawat Yang Dilas (Welded Wire Mesh) | Kg | 28.020,64 | Tidak Dipakai | |
9 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.99 |
Aspal Cair Emulsi untuk Precoated |
|
liter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0286 |
OH |
206.800,00 |
5.914,48 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1429 |
OH |
150.800,00 |
21.549,32 |
|
|
|
|
Jumlah |
27.463,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.17 |
Aspal |
0.976 |
Kg |
17.900,00 |
17.470,40 |
117.1.1.1.21.1 |
Kerosene |
0.0659 |
liter |
10.700,00 |
705,13 |
|
|
|
|
Jumlah |
18.175,53 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.40 |
Pan Mixer |
0.0009 |
jam |
987.200,00 |
888,48 |
|
|
|
|
Jumlah |
888,48 |
|
|
|
|
Nilai HSPK |
46.527,81 |
| 2020 | 24.2.3.99 | Aspal Cair Emulsi untuk Precoated | liter | 46.527,81 | Tidak Dipakai | |
10 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.101 |
Aspal Emulsi Modifikasi untuk Precoated |
|
liter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0571 |
OH |
206.800,00 |
11.808,28 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2857 |
OH |
150.800,00 |
43.083,56 |
|
|
|
|
Jumlah |
54.891,84 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.18 |
Aspal Emulsi |
0.9571 |
Kg |
1.300,00 |
1.244,23 |
117.1.1.1.21.1 |
Kerosene |
0.0624 |
liter |
10.700,00 |
667,68 |
|
|
|
|
Jumlah |
1.911,91 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.40 |
Pan Mixer |
0.0009 |
jam |
987.200,00 |
888,48 |
|
|
|
|
Jumlah |
888,48 |
|
|
|
|
Nilai HSPK |
57.692,23 |
| 2020 | 24.2.3.101 | Aspal Emulsi Modifikasi untuk Precoated | liter | 57.692,23 | Tidak Dipakai | |
11 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.100 |
Aspal Emulsi untuk Precoated |
|
liter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0571 |
OH |
206.800,00 |
11.808,28 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2857 |
OH |
150.800,00 |
43.083,56 |
|
|
|
|
Jumlah |
54.891,84 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.18 |
Aspal Emulsi |
0.9779 |
Kg |
1.300,00 |
1.271,27 |
117.1.1.1.21.1 |
Kerosene |
0.0494 |
liter |
10.700,00 |
528,58 |
|
|
|
|
Jumlah |
1.799,85 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.40 |
Pan Mixer |
0.0009 |
jam |
987.200,00 |
888,48 |
|
|
|
|
Jumlah |
888,48 |
|
|
|
|
Nilai HSPK |
57.580,17 |
| 2020 | 24.2.3.100 | Aspal Emulsi untuk Precoated | liter | 57.580,17 | Tidak Dipakai | |
12 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.98 |
Bahan Aspal Modifikasi untuk Pekerjaan Pelaburan |
|
liter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0001 |
OH |
206.800,00 |
20,68 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0003 |
OH |
150.800,00 |
45,24 |
|
|
|
|
Jumlah |
65,92 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.21.1 |
Kerosene |
0.0494 |
liter |
10.700,00 |
528,58 |
|
|
|
|
Jumlah |
528,58 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.2 |
Asphalt Distributor |
0.0002 |
jam |
680.400,00 |
136,08 |
123.2.2.1.2.12 |
Compressor |
0.0002 |
jam |
332.200,00 |
66,44 |
|
|
|
|
Jumlah |
202,52 |
|
|
|
|
Nilai HSPK |
797,02 |
| 2020 | 24.2.3.98 | Bahan Aspal Modifikasi untuk Pekerjaan Pelaburan | liter | 797,02 | Tidak Dipakai | |
13 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.44 |
Bahan Aspal untuk Pekerjaan Pelaburan |
|
liter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0001 |
OH |
206.800,00 |
20,68 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0003 |
OH |
150.800,00 |
45,24 |
|
|
|
|
Jumlah |
65,92 |
|
Bahan/Material: |
|
|
|
|
117.1.1.4.6.8 |
Minyak Tanah Industri |
0.052 |
Ltr |
14.200,00 |
738,40 |
|
|
|
|
Jumlah |
738,40 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.2 |
Asphalt Distributor |
0.0002 |
jam |
680.400,00 |
136,08 |
123.2.2.1.2.12 |
Compressor |
0.0002 |
jam |
332.200,00 |
66,44 |
|
|
|
|
Jumlah |
202,52 |
|
|
|
|
Nilai HSPK |
1.006,84 |
| 2020 | 24.2.3.44 | Bahan Aspal untuk Pekerjaan Pelaburan | liter | 1.006,84 | Tidak Dipakai | |
14 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.76 |
Bahan Aspal untuk Pekerjaan Pelaburan 1 |
|
liter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0001 |
OH |
206.800,00 |
20,68 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0003 |
OH |
150.800,00 |
45,24 |
|
|
|
|
Jumlah |
65,92 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.17 |
Aspal |
0.976 |
Kg |
17.900,00 |
17.470,40 |
117.1.1.1.21.1 |
Kerosene |
0.066 |
liter |
10.700,00 |
706,20 |
|
|
|
|
Jumlah |
18.176,60 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.2 |
Asphalt Distributor |
0.0002 |
jam |
680.400,00 |
136,08 |
123.2.2.1.2.12 |
Compressor |
0.0002 |
jam |
332.200,00 |
66,44 |
|
|
|
|
Jumlah |
202,52 |
|
|
|
|
Nilai HSPK |
18.445,04 |
| 2020 | 24.2.3.76 | Bahan Aspal untuk Pekerjaan Pelaburan 1 | liter | 18.445,04 | Tidak Dipakai | |
15 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.18 |
Bahan Porous untuk Bahan Penyaring (Filter) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
81.000,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.68 |
Aggregat Kasar |
0.55 |
M3 |
278.900,00 |
153.395,00 |
|
|
|
|
Jumlah |
153.395,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.48 |
Tamper |
0.1606 |
jam |
68.100,00 |
10.936,86 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
12.336,86 |
|
|
|
|
Nilai HSPK |
246.731,86 |
| 2020 | 24.2.3.18 | Bahan Porous untuk Bahan Penyaring (Filter) | M3 | 246.731,86 | Tidak Dipakai | |
16 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.22 |
Baja Prategang |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.043 |
OH |
206.800,00 |
8.892,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4303 |
OH |
150.800,00 |
64.889,24 |
123.1.1.1.1.23 |
Tukang |
0.043 |
OH |
177.500,00 |
7.632,50 |
|
|
|
|
Jumlah |
81.414,14 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.186 |
Kabel Baja Prategang (Strand) |
1 |
Kg |
18.700,00 |
18.700,00 |
|
|
|
|
Jumlah |
18.700,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.23 |
Crane 80 Ton |
0.3012 |
jam |
951.200,00 |
286.501,44 |
123.2.2.1.2.24 |
Dump Truck |
0.2674 |
jam |
513.600,00 |
137.336,64 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
425.238,08 |
|
|
|
|
Nilai HSPK |
525.352,22 |
| 2020 | 24.2.4.22 | Baja Prategang | Kg | 525.352,22 | Tidak Dipakai | |
17 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.26 |
Besi Tulangan U 24 Polos |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0044 |
OH |
206.800,00 |
909,92 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0089 |
OH |
150.800,00 |
1.342,12 |
123.1.1.1.1.23 |
Tukang |
0.0044 |
OH |
177.500,00 |
781,00 |
|
|
|
|
Jumlah |
3.033,04 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.32 |
Besi Beton Polos |
1.1 |
Kg |
16.900,00 |
18.590,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.0025 |
Kg |
34.882,00 |
87,20 |
|
|
|
|
Jumlah |
18.677,21 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
23.110,25 |
| 2020 | 24.2.4.26 | Besi Tulangan U 24 Polos | Kg | 23.110,25 | Tidak Dipakai | |
18 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.27 |
Besi Tulangan U 32 Polos |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.015 |
OH |
150.800,00 |
2.262,00 |
123.1.1.1.1.23 |
Tukang |
0.005 |
OH |
177.500,00 |
887,50 |
|
|
|
|
Jumlah |
4.183,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.8.10 |
Baja Tulangan (Ulir) U32 |
1.1 |
Kg |
32.900,00 |
36.190,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.02 |
Kg |
34.882,00 |
697,64 |
|
|
|
|
Jumlah |
36.887,64 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
42.471,14 |
| 2020 | 24.2.4.27 | Besi Tulangan U 32 Polos | Kg | 42.471,14 | Tidak Dipakai | |
19 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.28 |
Besi Tulangan U 32 Ulir |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.015 |
OH |
150.800,00 |
2.262,00 |
123.1.1.1.1.23 |
Tukang |
0.005 |
OH |
177.500,00 |
887,50 |
|
|
|
|
Jumlah |
4.183,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.8.10 |
Baja Tulangan (Ulir) U32 |
1.1 |
Kg |
32.900,00 |
36.190,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.02 |
Kg |
34.882,00 |
697,64 |
|
|
|
|
Jumlah |
36.887,64 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
42.471,14 |
| 2020 | 24.2.4.28 | Besi Tulangan U 32 Ulir | Kg | 42.471,14 | Tidak Dipakai | |
20 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.29 |
Besi Tulangan U 39 Ulir |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.015 |
OH |
150.800,00 |
2.262,00 |
123.1.1.1.1.23 |
Tukang |
0.005 |
OH |
177.500,00 |
887,50 |
|
|
|
|
Jumlah |
4.183,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.8.11 |
Baja Tulangan (Ulir) U39 |
1.1 |
Kg |
33.300,00 |
36.630,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.02 |
Kg |
34.882,00 |
697,64 |
|
|
|
|
Jumlah |
37.327,64 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
42.911,14 |
| 2020 | 24.2.4.29 | Besi Tulangan U 39 Ulir | Kg | 42.911,14 | Tidak Dipakai | |