141 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.3 |
Pemasangan Plafon Eternit Rangka Kayu Lama |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.3 | Pemasangan Plafon Eternit Rangka Kayu Lama | 10 Pcs | 0,00 | Tidak Dipakai | |
142 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.2.3 |
Pelapisan Waterproofing |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.4.2.3 | Pelapisan Waterproofing | 10 Pcs | 0,00 | Tidak Dipakai | |
143 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.11.3 |
Pemasangan Saklar Tunggal |
|
titik |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2020 | 24.1.11.3 | Pemasangan Saklar Tunggal | titik | 0,00 | Tidak Dipakai | |
144 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.3 |
Pekerjaan Perakitan Besi |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.2.3 | Pekerjaan Perakitan Besi | ikat | 0,00 | Tidak Dipakai | |
145 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.3 |
Pemasangan Kabel Bawah Tanah |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.75 |
OH |
150.800,00 |
113.100,00 |
123.1.1.1.1.23 |
Tukang |
0.5 |
OH |
177.500,00 |
88.750,00 |
|
|
|
|
Jumlah |
207.020,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.34 |
Mesin Bor galian kabel bawah tanah |
0.5 |
jam |
200.100,00 |
100.050,00 |
|
|
|
|
Jumlah |
100.050,00 |
|
|
|
|
Nilai HSPK |
307.070,00 |
| 2020 | 24.2.2.3 | Pemasangan Kabel Bawah Tanah | M | 307.070,00 | Tidak Dipakai | |
146 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.3 |
Pemasangan Paving Blok Tbl.8 cm segi empat |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
27.490,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.92 |
Paving Blok segi enam t. 8 cm |
1 |
M2 |
104.800,00 |
104.800,00 |
|
|
|
|
Jumlah |
104.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
132.290,00 |
| 2020 | 24.2.1.3 | Pemasangan Paving Blok Tbl.8 cm segi empat | M2 | 132.290,00 | Tidak Dipakai | |
147 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.3 |
Pemasangan Kabel Bawah Tanah |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.3 | Pemasangan Kabel Bawah Tanah | lembar | 0,00 | Tidak Dipakai | |
148 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.2.3 |
Pelapisan Waterproofing |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.2.3 | Pelapisan Waterproofing | 10 Pcs | 0,00 | Tidak Dipakai | |
149 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.3 |
Pengangkutan Tanah Sejauh 150 Meter |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.05 |
Orang Hari |
28.000,00 |
1.400,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.516 |
Orang Hari |
110.000,00 |
56.760,00 |
|
|
|
|
Jumlah |
58.160,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
58.160,00 |
| 2019 | 24.1.2.3 | Pengangkutan Tanah Sejauh 150 Meter | M3 | 58.160,00 | Tidak Dipakai | |
150 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.4.3 |
Pemasangan Pintu Pagar Besi |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.4.3 | Pemasangan Pintu Pagar Besi | 10 Pcs | 0,00 | Tidak Dipakai | |
151 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.2.3 |
Pemasangan Saklar Tunggal |
|
cup |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.2.3 | Pemasangan Saklar Tunggal | cup | 0,00 | Tidak Dipakai | |
152 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.3 |
Pembuatan pagar sementara kawat duri tinggi 1,8 m |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2 |
OH |
150.800,00 |
30.160,00 |
123.1.1.1.1.23 |
Tukang |
0.3 |
OH |
177.500,00 |
53.250,00 |
|
|
|
|
Jumlah |
92.270,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
2 |
Kg |
2.600,00 |
5.200,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.005 |
M3 |
180.100,00 |
900,50 |
117.1.1.1.5.88 |
Batu Koral |
0.009 |
M3 |
400.200,00 |
3.601,80 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
1 |
batang |
26.700,00 |
26.700,00 |
117.1.1.1.22.195 |
Kawat Duri |
25 |
M1 |
24.500,00 |
612.500,00 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.06 |
Kg |
34.700,00 |
2.082,00 |
|
|
|
|
Jumlah |
650.984,30 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
743.254,30 |
| 2020 | 24.1.1.3 | Pembuatan pagar sementara kawat duri tinggi 1,8 m | M1 | 743.254,30 | Tidak Dipakai | |
153 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.1.3 |
Kusen Pintu/Jendela Kayu Meranti |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.1.3 | Kusen Pintu/Jendela Kayu Meranti | 500 Biji | 0,00 | Tidak Dipakai | |
154 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.5.3 |
Pekerjaan Besi Pipa Galvanis 3/4 " (Medium) |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.7.5.3 | Pekerjaan Besi Pipa Galvanis 3/4 " (Medium) | lembar | 0,00 | Tidak Dipakai | |
155 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.4.3 |
Pemasangan Pintu Pagar Besi |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.7.4.3 | Pemasangan Pintu Pagar Besi | 10 Pcs | 0,00 | Tidak Dipakai | |
156 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.3 |
Pemasangan Genteng Karang Pilang / Wisma |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.3 | Pemasangan Genteng Karang Pilang / Wisma | 10 Pcs | 0,00 | Tidak Dipakai | |
157 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.13.3 |
Pemasangan Pintu Pagar Besi |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.05 |
OH |
150.800,00 |
158.339,99 |
123.1.1.1.1.23 |
Tukang |
1.05 |
OH |
177.500,00 |
186.374,99 |
|
|
|
|
Jumlah |
344.714,98 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.279 |
Pintu Pagar Besi |
1 |
M2 |
2.001.000,00 |
2.001.000,00 |
|
|
|
|
Jumlah |
2.001.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.345.714,98 |
| 2020 | 24.1.13.3 | Pemasangan Pintu Pagar Besi | M2 | 2.345.714,98 | Tidak Dipakai | |
158 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.3 |
Pemasangan Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.1.3 | Pemasangan Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata | 10 Pcs | 0,00 | Tidak Dipakai | |
159 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.3 |
Penggalian Tanah Keras sedalam s.d. 1 m |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.032 |
OH |
206.800,00 |
6.617,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
157.417,60 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
157.417,60 |
| 2020 | 24.1.2.3 | Penggalian Tanah Keras sedalam s.d. 1 m | M3 | 157.417,60 | Tidak Dipakai | |
160 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.3 |
Pemasangan Paving Stone (Blok) Tbl.8 cm Merah Empat Persegi Panjang |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.3 | Pemasangan Paving Stone (Blok) Tbl.8 cm Merah Empat Persegi Panjang | 10 Pcs | 0,00 | Tidak Dipakai | |