41 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.1 |
Pemasangan Plafon Asbes Datar Rangka Kayu Kamper |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.1 | Pemasangan Plafon Asbes Datar Rangka Kayu Kamper | 10 Pcs | 0,00 | Tidak Dipakai | |
42 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.1 |
Perkerasan Jalan raya |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.2.1 | Perkerasan Jalan raya | Pohon | 0,00 | Tidak Dipakai | |
43 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.5.1 |
Pekerjaan Perakitan dan Pemasangan Struktur Besi/Baja Profil |
|
kilogram |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.006 |
OH |
236.200,00 |
1.417,20 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.06 |
OH |
150.800,00 |
9.048,00 |
|
|
|
|
Jumlah |
11.085,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.504 |
Besi Profil |
1.15 |
Kg |
20.100,00 |
23.115,00 |
117.1.1.4.6.6 |
Minyak Solar |
0.01 |
Ltr |
15.700,00 |
157,00 |
117.1.1.4.6.21 |
Pelumas Gerdang |
0.001 |
Ltr |
80.100,00 |
80,10 |
|
|
|
|
Jumlah |
23.352,10 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.37 |
Mesin Perakitan Besi/Baja lengkap |
0.008 |
jam |
751.100,00 |
6.008,80 |
|
|
|
|
Jumlah |
6.008,80 |
|
|
|
|
Nilai HSPK |
40.446,50 |
| 2020 | 24.1.5.1 | Pekerjaan Perakitan dan Pemasangan Struktur Besi/Baja Profil | kilogram | 40.446,50 | Tidak Dipakai | |
44 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.1 |
Pemasangan Dasar Saluran R.10 Segmen |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0238 |
OH |
206.800,00 |
4.921,84 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.475 |
OH |
150.800,00 |
71.630,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
76.551,84 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.458 |
Got Talang R.10 (segmen) |
1 |
buah |
36.300,00 |
36.300,00 |
|
|
|
|
Jumlah |
36.300,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
112.851,84 |
| 2020 | 24.1.12.1 | Pemasangan Dasar Saluran R.10 Segmen | meter | 112.851,84 | Tidak Dipakai | |
45 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.1 |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.75 |
OH |
150.800,00 |
113.100,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
118.270,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
118.270,00 |
| 2020 | 24.1.2.1 | Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi | M3 | 118.270,00 | Tidak Dipakai | |
46 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.4.1 |
Pemasangan Pagar Besi Model BRC |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.7.4.1 | Pemasangan Pagar Besi Model BRC | 10 Pcs | 0,00 | Tidak Dipakai | |
47 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.1 |
Pemasangan Genteng Jawa (Soka) |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.1 | Pemasangan Genteng Jawa (Soka) | 10 Pcs | 0,00 | Tidak Dipakai | |
48 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.1 |
Pemasangan Tegel Keramik 20x20 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.5.1.1 | Pemasangan Tegel Keramik 20x20 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
49 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.1 |
Pembuatan Pagar Sementara dari kayu tinggi 2 m |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
104.680,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
5 |
Kg |
2.600,00 |
13.000,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.005 |
M3 |
180.100,00 |
900,50 |
117.1.1.1.5.88 |
Batu Koral |
0.009 |
M3 |
400.200,00 |
3.601,80 |
117.1.1.1.21.2 |
Minyak Bakar |
0.4 |
Ltr |
14.100,00 |
5.640,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
1.25 |
batang |
26.700,00 |
33.375,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.072 |
M3 |
6.403.200,00 |
461.030,38 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.06 |
Kg |
34.700,00 |
2.082,00 |
|
|
|
|
Jumlah |
519.629,68 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
624.309,68 |
| 2020 | 24.1.1.1 | Pembuatan Pagar Sementara dari kayu tinggi 2 m | M1 | 624.309,68 | Tidak Dipakai | |
50 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.5.1 |
Pemasangan Pipa Galvanis Termasuk Elektrode |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.5.1 | Pemasangan Pipa Galvanis Termasuk Elektrode | lembar | 0,00 | Tidak Dipakai | |
51 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.1 |
Pemasangan Turap Papan tebal 3 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.2.1.1 | Pemasangan Turap Papan tebal 3 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
52 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.1 |
Pekerjaan Pemasangan Besi Profil |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.2.1 | Pekerjaan Pemasangan Besi Profil | ikat | 0,00 | Tidak Dipakai | |
53 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.11.1 |
Pemasangan Titik Stop Kontak Gedung |
|
titik |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.06 |
OH |
236.200,00 |
14.172,00 |
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.48 |
OH |
150.800,00 |
72.384,00 |
123.1.1.1.1.23 |
Tukang |
0.24 |
OH |
177.500,00 |
42.600,00 |
|
|
|
|
Jumlah |
133.292,00 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.13 |
Pipa Pralon 5/8 |
2 |
batang |
10.500,00 |
21.000,00 |
132.3.1.10.1.101 |
Isolator |
1 |
unit |
10.500,00 |
10.500,00 |
|
|
|
|
Jumlah |
31.500,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
164.792,00 |
| 2020 | 24.1.11.1 | Pemasangan Titik Stop Kontak Gedung | titik | 164.792,00 | Tidak Dipakai | |
54 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.1 |
Pemasangan Tegel Trotoar |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
130.850,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.42 |
Kapur Pasang |
0.012 |
Karung |
85.400,00 |
1.024,80 |
117.1.1.1.2.54 |
Semen PC / Kg |
3.648 |
Kg |
2.600,00 |
9.484,80 |
117.1.1.1.4.4 |
Pasir Pasang |
0.01 |
M3 |
180.100,00 |
1.801,00 |
117.1.1.12.1.109 |
Tegel Trotoar 30 x 30 |
1 |
M2 |
94.900,00 |
94.900,00 |
|
|
|
|
Jumlah |
107.210,60 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
238.060,60 |
| 2020 | 24.2.1.1 | Pemasangan Tegel Trotoar | M2 | 238.060,60 | Tidak Dipakai | |
55 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.1 |
Pemasangan Dinding Batu Merah 1 Pc : 2 Pp tebal 1 bata |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.1.1 | Pemasangan Dinding Batu Merah 1 Pc : 2 Pp tebal 1 bata | 10 Pcs | 0,00 | Tidak Dipakai | |
56 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.1 |
Pemasangan Tegel Keramik 20x20 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.5.1.1 | Pemasangan Tegel Keramik 20x20 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
57 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.1 |
PemoTongan Pohon Pilihan diameter 15 – 30 cm |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
|
|
|
|
Jumlah |
85.740,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.10 |
Chain Saw |
1 |
jam |
100.100,00 |
100.100,00 |
123.2.2.1.2.24 |
Dump Truck |
0.289 |
jam |
513.600,00 |
148.430,40 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
249.930,40 |
|
|
|
|
Nilai HSPK |
335.670,40 |
| 2020 | 24.2.6.1 | PemoTongan Pohon Pilihan diameter 15 – 30 cm | buah | 335.670,40 | Tidak Dipakai | |
58 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.2 |
Pemasangan Plafon Eternit Rangka Kayu kamper |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.2 | Pemasangan Plafon Eternit Rangka Kayu kamper | 10 Pcs | 0,00 | Tidak Dipakai | |
59 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.2 |
Pemasangan Turap Bambu tinggi 1,5 m |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.2.1.2 | Pemasangan Turap Bambu tinggi 1,5 m | lembar | 0,00 | Tidak Dipakai | |
60 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.1.2 |
Kusen Pintu / Jendela Kayu kamper |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.7.1.2 | Kusen Pintu / Jendela Kayu kamper | 500 Biji | 0,00 | Tidak Dipakai | |