241 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.2.5 |
Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.4.2.5 | Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) | 10 Pcs | 0,00 | Tidak Dipakai | |
242 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.5 |
Pemasangan Lantai Keramik ukuran 40x40 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.035 |
OH |
206.800,00 |
7.238,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7 |
OH |
150.800,00 |
105.560,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
183.190,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
10.4 |
Kg |
2.600,00 |
27.040,00 |
117.1.1.1.2.58 |
Semen Warna |
1.62 |
Zak |
114.800,00 |
185.976,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.045 |
M3 |
180.100,00 |
8.104,50 |
117.1.1.12.1.75 |
Keramik 40 x 40 cm |
6.5 |
kotak |
156.800,00 |
1.019.200,00 |
|
|
|
|
Jumlah |
1.240.320,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.423.510,50 |
| 2020 | 24.1.8.5 | Pemasangan Lantai Keramik ukuran 40x40 cm | M2 | 1.423.510,50 | Tidak Dipakai | |
243 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.13.5 |
Pekerjaan Pembuatan Pagar Besi Model PMG 1,2 m x 2,4 m |
|
panel |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.8 |
OH |
236.200,00 |
188.960,00 |
123.1.1.1.1.6 |
Mandor |
0.4 |
OH |
206.800,00 |
82.720,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
3.2 |
OH |
150.800,00 |
482.560,01 |
123.1.1.1.1.23 |
Tukang |
1.6 |
OH |
177.500,00 |
284.000,00 |
|
|
|
|
Jumlah |
1.038.240,02 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.18 |
Cat Meni Besi |
0.36 |
Kg |
50.700,00 |
18.252,00 |
117.1.1.1.16.12 |
Plat Besi/Baja 244 x 122, tebal 1,8 mm |
22.608 |
Lonjor |
628.500,00 |
14.209.127,88 |
|
|
|
|
Jumlah |
14.227.379,88 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
2.88 |
M2 |
46.900,00 |
135.072,01 |
|
|
|
|
Jumlah |
135.072,01 |
|
|
|
|
Nilai HSPK |
15.400.691,90 |
| 2020 | 24.1.13.5 | Pekerjaan Pembuatan Pagar Besi Model PMG 1,2 m x 2,4 m | panel | 15.400.691,90 | Tidak Dipakai | |
244 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.5 |
Pemasangan rangka Penutup Atap genteng keramik kayu kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
36.226,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.51 |
Kayu Papan/ Broti kelas I |
0.014 |
ton |
6.403.200,00 |
89.644,80 |
117.1.1.1.22.64 |
Kayu Uk 2"x 3" |
0.036 |
batang |
66.700,00 |
2.401,20 |
117.1.1.1.22.236 |
Paku 4 inchi |
0.25 |
Kg |
24.100,00 |
6.025,00 |
|
|
|
|
Jumlah |
98.071,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
134.297,00 |
| 2020 | 24.1.9.5 | Pemasangan rangka Penutup Atap genteng keramik kayu kelas II | M2 | 134.297,00 | Tidak Dipakai | |
245 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.5 |
Dinding Batu Merah 1 Pc : 2 Pp tebal 1/2 bata |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.015 |
OH |
206.800,00 |
3.102,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3 |
OH |
150.800,00 |
45.240,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
68.454,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
18.95 |
Kg |
2.600,00 |
49.270,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.038 |
M3 |
180.100,00 |
6.843,80 |
117.1.1.1.5.82 |
Batu Bata Besar ( jumbo ) |
70 |
buah |
700,00 |
49.000,00 |
|
|
|
|
Jumlah |
105.113,80 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
173.567,80 |
| 2020 | 24.1.6.5 | Dinding Batu Merah 1 Pc : 2 Pp tebal 1/2 bata | M2 | 173.567,80 | Tidak Dipakai | |
246 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.5 |
Pemasangan Trucuk Kayu Gelam φ 8 s/d 12 - P 4 m |
|
batang |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.5 | Pemasangan Trucuk Kayu Gelam φ 8 s/d 12 - P 4 m | batang | 0,00 | Tidak Dipakai | |
247 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.5 |
Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7 |
OH |
150.800,00 |
105.560,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
161.740,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
0.146 |
M3 |
1.534.100,00 |
223.978,60 |
117.1.1.1.4.14 |
Tanah Merah/ Timbun |
1.063 |
M3 |
333.500,00 |
354.510,49 |
117.1.1.1.14.32 |
Besi Beton Polos |
16.06 |
Kg |
16.900,00 |
271.413,99 |
117.1.1.1.22.23 |
Urugan/ Timbunan Porus |
0.1449 |
M3 |
491.200,00 |
71.174,88 |
|
|
|
|
Jumlah |
921.077,95 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.29 |
Flat Bed Truck |
0.1004 |
jam |
844.500,00 |
84.787,80 |
123.2.2.1.2.48 |
Tamper |
1.317 |
jam |
68.100,00 |
89.687,70 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
175.875,50 |
|
|
|
|
Nilai HSPK |
1.258.693,45 |
| 2020 | 24.2.3.5 | Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm | M1 | 1.258.693,45 | Tidak Dipakai | |
248 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.3.5 |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.7.3.5 | Pemasangan Dasar Saluran R.15 (1/2 lingkaran) | lembar | 0,00 | Tidak Dipakai | |
249 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.5 |
Lapis Resap Ikat/Prime Coat |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.5 | Lapis Resap Ikat/Prime Coat | Pohon | 0,00 | Tidak Dipakai | |
250 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.5 |
Pemasangan Plafon Triplek Rangka Kayu Meranti |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.5 | Pemasangan Plafon Triplek Rangka Kayu Meranti | 10 Pcs | 0,00 | Tidak Dipakai | |
251 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.5 |
Pemasangan Plafon Triplek Rangka Kayu Meranti |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.6.3.5 | Pemasangan Plafon Triplek Rangka Kayu Meranti | 10 Pcs | 0,00 | Tidak Dipakai | |
252 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.5 |
Pemasangan Paving Stone (Blok) Tbl.8 cm Abu-2 Empat Persegi Panjang |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.1.5 | Pemasangan Paving Stone (Blok) Tbl.8 cm Abu-2 Empat Persegi Panjang | 10 Pcs | 0,00 | Tidak Dipakai | |
253 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.5.5 |
Pekerjaan Besi Pipa Galvanis 1 1/4 " (Medium) |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.7.5.5 | Pekerjaan Besi Pipa Galvanis 1 1/4 " (Medium) | lembar | 0,00 | Tidak Dipakai | |
254 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.5 |
Pemasangan Paving Stone (Blok) Tbl.8 cm Abu-2 Empat Persegi Panjang |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.5 | Pemasangan Paving Stone (Blok) Tbl.8 cm Abu-2 Empat Persegi Panjang | 10 Pcs | 0,00 | Tidak Dipakai | |
255 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.5 |
Pekerjaan Beton K-175 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.5 | Pekerjaan Beton K-175 | 500 Biji | 0,00 | Tidak Dipakai | |
256 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.5 |
Roll Pipa 2" |
|
Pad |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.3.5 | Roll Pipa 2" | Pad | 0,00 | Tidak Dipakai | |
257 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.5 |
Pekerjaan Beton K-175 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.1.5 | Pekerjaan Beton K-175 | 500 Biji | 0,00 | Tidak Dipakai | |
258 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.4.5 |
Pekerjaan Pembuatan Pagar Besi Model PMG 1,2 m x 2.4 m |
|
10 Lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.4.5 | Pekerjaan Pembuatan Pagar Besi Model PMG 1,2 m x 2.4 m | 10 Lembar | 0,00 | Tidak Dipakai | |
259 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.5.5 |
Pekerjaan atap pelana rangkap atap baja ringan profil C 75 bahan atap genteng |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.06 |
OH |
236.200,00 |
14.172,00 |
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.6 |
OH |
150.800,00 |
90.480,00 |
123.1.1.1.1.25 |
Tukang Besi |
0.6 |
OH |
177.500,00 |
106.500,00 |
|
|
|
|
Jumlah |
215.288,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.8.5 |
Baja Ringan Canal C75 |
3.5248 |
batang |
81.200,00 |
286.213,77 |
|
|
|
|
Jumlah |
286.213,77 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
501.501,77 |
| 2020 | 24.1.5.5 | Pekerjaan atap pelana rangkap atap baja ringan profil C 75 bahan atap genteng | M2 | 501.501,77 | Tidak Dipakai | |
260 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.1.5 |
Daun Pintu Triplek |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.1.5 | Daun Pintu Triplek | 10 Pcs | 0,00 | Tidak Dipakai | |