121 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.33 |
Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 6600 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.33 | Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 6600 | unit | 1.616.466,95 | Tidak Dipakai | |
122 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.39 |
Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 41500VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.39 | Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 41500VA | unit | 1.616.466,95 | Tidak Dipakai | |
123 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.38 |
Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 33000VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.38 | Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 33000VA | unit | 1.616.466,95 | Tidak Dipakai | |
124 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.37 |
Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 23000VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.37 | Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 23000VA | unit | 1.616.466,95 | Tidak Dipakai | |
125 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.36 |
Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 16500VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.36 | Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 16500VA | unit | 1.616.466,95 | Tidak Dipakai | |
126 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.35 |
Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 13200VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.35 | Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 13200VA | unit | 1.616.466,95 | Tidak Dipakai | |
127 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.34 |
Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 10600VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.34 | Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 10600VA | unit | 1.616.466,95 | Tidak Dipakai | |
128 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.32 |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 7700VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.32 | Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 7700VA | unit | 1.616.466,95 | Tidak Dipakai | |
129 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.31 |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 5500VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.31 | Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 5500VA | unit | 1.616.466,95 | Tidak Dipakai | |
130 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.30 |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 4400VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.30 | Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 4400VA | unit | 1.616.466,95 | Tidak Dipakai | |
131 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.29 |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 3500VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.29 | Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 3500VA | unit | 1.616.466,95 | Tidak Dipakai | |
132 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.28 |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
117.2.2.6.1.30 |
Pipa PVC Pelaluan Arde |
3 |
batang |
6.700,00 |
20.100,00 |
|
|
|
|
Jumlah |
1.084.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.636.566,95 |
| 2020 | 24.2.2.28 | Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA | unit | 1.636.566,95 | Tidak Dipakai | |
133 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.103 |
penyediaan unit pracetak gelagar tipe bentang 16 meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.11.3.1 |
Sewa Crane |
0.9009 |
jam |
146.300,00 |
131.801,67 |
23.2.5.11.3.2 |
Sewa Bucket dan Crane / Draglin Scraper |
0.9009 |
jam |
85.200,00 |
76.756,68 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
229.858,35 |
|
|
|
|
Nilai HSPK |
229.858,35 |
| 2019 | 24.3.1.103 | penyediaan unit pracetak gelagar tipe bentang 16 meter | buah | 229.858,35 | Tidak Dipakai | |
134 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.35 |
Penyediaan Unit Pracetak Gelagar I Tipe 1 Bentang 25 Meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.35 | Penyediaan Unit Pracetak Gelagar I Tipe 1 Bentang 25 Meter | buah | 0,00 | Tidak Dipakai | |
135 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.34 |
Penyediaan Unit Pracetak Gelagar I tipe 1 Bentang 16 Meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.34 | Penyediaan Unit Pracetak Gelagar I tipe 1 Bentang 16 Meter | buah | 0,00 | Tidak Dipakai | |
136 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.104 |
penyediaan unit percetakan gelagar 1 bentang 25 meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.11.3.1 |
Sewa Crane |
0.9009 |
jam |
146.300,00 |
131.801,67 |
23.2.5.11.3.2 |
Sewa Bucket dan Crane / Draglin Scraper |
0.9009 |
jam |
85.200,00 |
76.756,68 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
229.858,35 |
|
|
|
|
Nilai HSPK |
229.858,35 |
| 2019 | 24.3.1.104 | penyediaan unit percetakan gelagar 1 bentang 25 meter | buah | 229.858,35 | Tidak Dipakai | |
137 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.13 |
Penimbunan tanah, Perataan dan Pemadatan menggunakan Alat Berat |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0031 |
OH |
206.800,00 |
641,08 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0008 |
OH |
150.800,00 |
120,64 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
761,72 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.16 |
Tanah Urug |
1.2 |
M3 |
230.800,00 |
276.960,01 |
|
|
|
|
Jumlah |
276.960,01 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.2564 |
jam |
513.600,00 |
131.687,03 |
123.2.2.1.2.27 |
Excavator |
0.0062 |
jam |
1.063.200,00 |
6.591,84 |
123.2.2.1.2.39 |
Motor Grader |
0.0036 |
jam |
1.115.300,00 |
4.015,08 |
123.2.2.1.2.59 |
Vibro Roller |
0.0042 |
jam |
617.700,00 |
2.594,34 |
123.2.2.1.2.61 |
Water Tank Truck |
0.007 |
jam |
525.600,00 |
3.679,20 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
149.967,49 |
|
|
|
|
Nilai HSPK |
427.689,23 |
| 2020 | 24.1.2.13 | Penimbunan tanah, Perataan dan Pemadatan menggunakan Alat Berat | M3 | 427.689,23 | Tidak Dipakai | |
138 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.12 |
Penimbunan tanah dan pemadatan menggunakan Alat Ringan |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3 |
OH |
150.800,00 |
45.240,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
47.308,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.16 |
Tanah Urug |
1.2 |
M3 |
230.800,00 |
276.960,01 |
|
|
|
|
Jumlah |
276.960,01 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.48 |
Tamper |
0.266 |
jam |
68.100,00 |
18.114,60 |
|
|
|
|
Jumlah |
18.114,60 |
|
|
|
|
Nilai HSPK |
342.382,61 |
| 2020 | 24.1.2.12 | Penimbunan tanah dan pemadatan menggunakan Alat Ringan | M3 | 342.382,61 | Tidak Dipakai | |
139 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.14 |
Penimbunan Sirtu dan Pemadatan menggunakan Alat Berat |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.021 |
OH |
206.800,00 |
4.342,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.25 |
OH |
150.800,00 |
37.700,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
42.042,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.9 |
Sirtu Air/ Kerikil bersih disaring |
1.2 |
M3 |
400.200,00 |
480.240,02 |
|
|
|
|
Jumlah |
480.240,02 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.088 |
jam |
513.600,00 |
45.196,80 |
123.2.2.1.2.28 |
Excavator 6 M3 |
0.022 |
jam |
584.300,00 |
12.854,60 |
123.2.2.1.2.39 |
Motor Grader |
0.008 |
jam |
1.115.300,00 |
8.922,40 |
123.2.2.1.2.44 |
Pneumatic Tyre Roller |
0.004 |
jam |
653.700,00 |
2.614,80 |
123.2.2.1.2.59 |
Vibro Roller |
0.012 |
jam |
617.700,00 |
7.412,40 |
123.2.2.1.2.61 |
Water Tank Truck |
0.012 |
jam |
525.600,00 |
6.307,20 |
|
|
|
|
Jumlah |
83.308,20 |
|
|
|
|
Nilai HSPK |
605.591,02 |
| 2020 | 24.1.2.14 | Penimbunan Sirtu dan Pemadatan menggunakan Alat Berat | M3 | 605.591,02 | Tidak Dipakai | |
140 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.9 |
Penimbunan kembali Tanah Galian |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
85.740,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
85.740,00 |