181 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.4 |
Penggalian Tanah Cadas/Rabat sedalam s.d. 1 m |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.06 |
OH |
206.800,00 |
12.408,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.5 |
OH |
150.800,00 |
226.200,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
238.608,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
238.608,00 |
| 2020 | 24.1.2.4 | Penggalian Tanah Cadas/Rabat sedalam s.d. 1 m | M3 | 238.608,00 | Tidak Dipakai | |
182 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.7 |
Penggalian Tanah Biasa untuk Konstruksi |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.1.2.7 | Penggalian Tanah Biasa untuk Konstruksi | 500 Biji | 0,00 | Tidak Dipakai | |
183 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.7 |
Penggalian Tanah Biasa untuk Konstruksi |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.1.2.7 | Penggalian Tanah Biasa untuk Konstruksi | 500 Biji | 0,00 | Tidak Dipakai | |
184 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.2 |
Penggalian Tanah Biasa sedalam s.d. 2 m untuk Konstruksi |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.045 |
OH |
206.800,00 |
9.306,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.9 |
OH |
150.800,00 |
135.720,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
145.026,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
145.026,00 |
| 2020 | 24.1.2.2 | Penggalian Tanah Biasa sedalam s.d. 2 m untuk Konstruksi | M3 | 145.026,00 | Tidak Dipakai | |
185 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.1 |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.75 |
OH |
150.800,00 |
113.100,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
118.270,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
118.270,00 |
| 2020 | 24.1.2.1 | Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi | M3 | 118.270,00 | Tidak Dipakai | |
186 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.29 |
Penggalian Tanah Biasa sedalam 2 m untuk Konstruksi |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.045 |
Orang Hari |
28.000,00 |
1.260,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.9 |
Orang Hari |
110.000,00 |
99.000,00 |
|
|
|
|
Jumlah |
100.260,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
100.260,00 |
| 2019 | 24.1.2.29 | Penggalian Tanah Biasa sedalam 2 m untuk Konstruksi | M3 | 100.260,00 | Tidak Dipakai | |
187 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.28 |
Penggalian Tanah Biasa Sedalam 1 m untuk Konstruksi |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.025 |
Orang Hari |
28.000,00 |
700,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.75 |
Orang Hari |
110.000,00 |
82.500,00 |
|
|
|
|
Jumlah |
83.200,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
83.200,00 |
| 2019 | 24.1.2.28 | Penggalian Tanah Biasa Sedalam 1 m untuk Konstruksi | M3 | 83.200,00 | Tidak Dipakai | |
188 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.11 |
Penggalian Lumpur dengan Alat Berat |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.1.2.11 | Penggalian Lumpur dengan Alat Berat | 500 Biji | 0,00 | Tidak Dipakai | |
189 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.11 |
Penggalian Lumpur dengan Alat Berat |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.007 |
Orang Hari |
28.000,00 |
196,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.226 |
Orang Hari |
110.000,00 |
24.860,00 |
|
|
|
|
Jumlah |
25.056,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.074 |
jam |
69.200,00 |
5.120,80 |
23.2.5.11.1.1 |
Sewa Escavator |
0.0528 |
jam |
138.400,00 |
7.307,52 |
|
|
|
|
Jumlah |
12.428,32 |
|
|
|
|
Nilai HSPK |
37.484,32 |
| 2019 | 24.1.2.11 | Penggalian Lumpur dengan Alat Berat | M3 | 37.484,32 | Tidak Dipakai | |
190 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.6 |
Penggalian Lumpur dengan Alat Berat |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.007 |
OH |
206.800,00 |
1.447,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.226 |
OH |
150.800,00 |
34.080,80 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
35.528,40 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.074 |
jam |
513.600,00 |
38.006,40 |
123.2.2.1.2.27 |
Excavator |
0.0528 |
jam |
1.063.200,00 |
56.136,96 |
|
|
|
|
Jumlah |
94.143,36 |
|
|
|
|
Nilai HSPK |
129.671,76 |
| 2020 | 24.1.2.6 | Penggalian Lumpur dengan Alat Berat | M3 | 129.671,76 | Tidak Dipakai | |
191 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.20 |
Pengerukan Saluran (manual) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.1.2.20 | Pengerukan Saluran (manual) | 500 Biji | 0,00 | Tidak Dipakai | |
192 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.20 |
Pengerukan Saluran (manual) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.1.2.20 | Pengerukan Saluran (manual) | 500 Biji | 0,00 | Tidak Dipakai | |
193 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.24 |
Pengerukan Saluran (alat berat) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.1.2.24 | Pengerukan Saluran (alat berat) | 500 Biji | 0,00 | Tidak Dipakai | |
194 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.24 |
Pengerukan Saluran (alat berat) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.1.2.24 | Pengerukan Saluran (alat berat) | 500 Biji | 0,00 | Tidak Dipakai | |
195 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.15 |
Pengerukan Saluran (alat berat) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.007 |
OH |
206.800,00 |
1.447,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.226 |
OH |
150.800,00 |
34.080,80 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
35.528,40 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.64 |
jam |
513.600,00 |
328.703,99 |
123.2.2.1.2.28 |
Excavator 6 M3 |
0.15 |
jam |
584.300,00 |
87.645,00 |
|
|
|
|
Jumlah |
416.349,00 |
|
|
|
|
Nilai HSPK |
451.877,40 |
| 2020 | 24.1.2.15 | Pengerukan Saluran (alat berat) | M3 | 451.877,40 | Tidak Dipakai | |
196 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.23 |
Pengerukan Lumpur (Gorong-gorong) manual |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.5 |
OH |
150.800,00 |
226.200,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
236.540,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
236.540,00 |
| 2020 | 24.1.12.23 | Pengerukan Lumpur (Gorong-gorong) manual | M3 | 236.540,00 | Tidak Dipakai | |
197 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.3.26 |
Pengerukan Lumpur (GORONG-2) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.3.26 | Pengerukan Lumpur (GORONG-2) | 500 Biji | 0,00 | Tidak Dipakai | |
198 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.3.26 |
Pengerukan Lumpur (GORONG-2) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.7.3.26 | Pengerukan Lumpur (GORONG-2) | 500 Biji | 0,00 | Tidak Dipakai | |
199 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.32 |
Pengerjaan Stripping 1 m2 Tanah Tebing Setinggi 1 meter |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.005 |
Orang Hari |
28.000,00 |
140,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.05 |
Orang Hari |
110.000,00 |
5.500,00 |
|
|
|
|
Jumlah |
5.640,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
5.640,00 |
| 2019 | 24.1.2.32 | Pengerjaan Stripping 1 m2 Tanah Tebing Setinggi 1 meter | M2 | 5.640,00 | Tidak Dipakai | |
200 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.8 |
Pengerjaan striping tanah tebing setinggi 1 meter |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
8.574,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
8.574,00 |
| 2020 | 24.1.2.8 | Pengerjaan striping tanah tebing setinggi 1 meter | M3 | 8.574,00 | Tidak Dipakai | |