1 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.27 |
Urugan Tanah Kembali dan Pemadatan |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.01 |
Orang Hari |
196.000,00 |
1.960,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.3 |
Orang Hari |
110.000,00 |
33.000,00 |
|
|
|
|
Jumlah |
34.960,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.4.1.5 |
Pasir Urug |
1.2 |
M3 |
241.763,00 |
290.115,61 |
|
|
|
|
Jumlah |
290.115,61 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
325.075,61 |
| 2018 | 24.1.2.27 | Urugan Tanah Kembali dan Pemadatan | M3 | 325.075,61 | Tidak Dipakai | |
2 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.27 |
Urugan Tanah Kembali dan Pemadatan |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.1.2.27 | Urugan Tanah Kembali dan Pemadatan | M3 | 0,00 | Tidak Dipakai | |
3 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.9 |
Uitzet Dengan WaterPass / Theodolit |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.3 |
Juru Ukur |
0.0067 |
OH |
236.200,00 |
1.582,54 |
123.1.1.1.1.4 |
Juru Ukur Pembantu |
0.0133 |
OH |
177.500,00 |
2.360,75 |
|
|
|
|
Jumlah |
3.943,29 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.52 |
Theodolit/Waterpass |
0.0067 |
Hari |
751.100,00 |
5.032,37 |
|
|
|
|
Jumlah |
5.032,37 |
|
|
|
|
Nilai HSPK |
8.975,66 |
| 2020 | 24.1.1.9 | Uitzet Dengan WaterPass / Theodolit | M2 | 8.975,66 | Tidak Dipakai | |
4 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.48 |
Tulangan Beton dengan Wiremesh |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.001 |
OH |
206.800,00 |
206,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.025 |
OH |
150.800,00 |
3.770,00 |
123.1.1.1.1.23 |
Tukang |
0.025 |
OH |
177.500,00 |
4.437,50 |
|
|
|
|
Jumlah |
14.319,30 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.147 |
Besi Wire Mess |
1.02 |
M2 |
137.500,00 |
140.250,00 |
117.1.1.1.22.542 |
Kawat Beton |
1.05 |
Kg |
34.882,00 |
36.626,10 |
|
|
|
|
Jumlah |
176.876,10 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
191.195,40 |
| 2020 | 24.1.4.48 | Tulangan Beton dengan Wiremesh | M2 | 191.195,40 | Tidak Dipakai | |
5 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.49 |
Tulangan Beton dengan Kabel prestressed polos/strand |
|
kilogram |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0005 |
OH |
236.200,00 |
118,10 |
123.1.1.1.1.6 |
Mandor |
0.0003 |
OH |
206.800,00 |
62,04 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.005 |
OH |
150.800,00 |
754,00 |
123.1.1.1.1.23 |
Tukang |
0.005 |
OH |
177.500,00 |
887,50 |
|
|
|
|
Jumlah |
1.821,64 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.32 |
Besi Beton Polos |
1.05 |
Kg |
16.900,00 |
17.745,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.01 |
Kg |
34.882,00 |
348,82 |
|
|
|
|
Jumlah |
18.093,82 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
19.915,46 |
| 2020 | 24.1.4.49 | Tulangan Beton dengan Kabel prestressed polos/strand | kilogram | 19.915,46 | Tidak Dipakai | |
6 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.47 |
Tulangan Beton dengan besi ulir |
|
kilogram |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.007 |
OH |
236.200,00 |
1.653,40 |
123.1.1.1.1.6 |
Mandor |
0.004 |
OH |
206.800,00 |
827,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.007 |
OH |
150.800,00 |
1.055,60 |
123.1.1.1.1.23 |
Tukang |
0.007 |
OH |
177.500,00 |
1.242,50 |
|
|
|
|
Jumlah |
4.778,70 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.12.24 |
Besi Beton Ulir |
1.05 |
Kg |
17.700,00 |
18.585,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.015 |
Kg |
34.882,00 |
523,23 |
|
|
|
|
Jumlah |
19.108,23 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
23.886,93 |
| 2020 | 24.1.4.47 | Tulangan Beton dengan besi ulir | kilogram | 23.886,93 | Tidak Dipakai | |
7 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.46 |
Tulangan Beton dengan besi polos |
|
kilogram |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.007 |
OH |
236.200,00 |
1.653,40 |
123.1.1.1.1.6 |
Mandor |
0.004 |
OH |
206.800,00 |
827,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.007 |
OH |
150.800,00 |
1.055,60 |
123.1.1.1.1.23 |
Tukang |
0.007 |
OH |
177.500,00 |
1.242,50 |
|
|
|
|
Jumlah |
4.778,70 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.32 |
Besi Beton Polos |
1.05 |
Kg |
16.900,00 |
17.745,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.015 |
Kg |
34.882,00 |
523,23 |
|
|
|
|
Jumlah |
18.268,23 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
23.046,93 |
| 2020 | 24.1.4.46 | Tulangan Beton dengan besi polos | kilogram | 23.046,93 | Tidak Dipakai | |
8 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.30 |
tiang bor beton diameter 800mm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.8.1.1 |
Besi Profil WF |
75.405 |
Kg |
21.900,00 |
1.651.369,47 |
20.1.1.9.1.6 |
Besi Beton Polos |
0.5027 |
M3 |
188.811,00 |
94.915,28 |
20.1.1.29.8.1 |
Paving Stone Merah Persegi Panjang |
2.5133 |
M2 |
67.000,00 |
168.391,10 |
|
|
|
|
Jumlah |
1.914.675,85 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.11.3.2 |
Sewa Bucket dan Crane / Draglin Scraper |
0.017 |
jam |
85.200,00 |
1.448,40 |
23.2.5.11.9.2 |
Sewa Concrete Pump |
0.0757 |
jam |
69.200,00 |
5.238,44 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
27.986,84 |
|
|
|
|
Nilai HSPK |
1.942.662,69 |
| 2019 | 24.2.1.30 | tiang bor beton diameter 800mm | M1 | 1.942.662,69 | Tidak Dipakai | |
9 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.33 |
Tiang Bor Beton Diameter 800 mm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.2.33 | Tiang Bor Beton Diameter 800 mm | M1 | 0,00 | Tidak Dipakai | |
10 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.18 |
Tanah Urug Katel |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.1.2.18 | Tanah Urug Katel | 500 Biji | 0,00 | Tidak Dipakai | |
11 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.18 |
Tanah Urug Katel |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.1.2.18 | Tanah Urug Katel | 500 Biji | 0,00 | Tidak Dipakai | |
12 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.11 |
Stopper/Uskup tebal 8 cm warna |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.1.11 | Stopper/Uskup tebal 8 cm warna | lembar | 0,00 | Tidak Dipakai | |
13 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.11 |
Stopper/Uskup tebal 8 cm warna |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.11 | Stopper/Uskup tebal 8 cm warna | lembar | 0,00 | Tidak Dipakai | |
14 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.11 |
Stopper/Uskup tebal 8 cm warna |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.001 |
OH |
206.800,00 |
206,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
22.526,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.4 |
Pasir Pasang |
0.001 |
M3 |
180.100,00 |
180,10 |
117.1.1.12.1.105 |
Stopper/ Uskup Tb 8 cm warna |
3.34 |
buah |
9.800,00 |
32.732,00 |
|
|
|
|
Jumlah |
32.912,10 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
55.438,90 |
| 2020 | 24.2.1.11 | Stopper/Uskup tebal 8 cm warna | M | 55.438,90 | Tidak Dipakai | |
15 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.9 |
Stopper/Uskup tebal 8 cm abu - abu |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.1.9 | Stopper/Uskup tebal 8 cm abu - abu | lembar | 0,00 | Tidak Dipakai | |
16 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.9 |
Stopper/Uskup tebal 8 cm abu - abu |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.9 | Stopper/Uskup tebal 8 cm abu - abu | lembar | 0,00 | Tidak Dipakai | |
17 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.9 |
Stopper/Uskup tebal 8 cm abu - abu |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.001 |
OH |
206.800,00 |
206,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
22.526,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.4 |
Pasir Pasang |
0.001 |
M3 |
180.100,00 |
180,10 |
117.1.1.12.1.104 |
Stopper/ Uskup Tb 8 cm abu-abu |
3.34 |
buah |
9.100,00 |
30.394,00 |
|
|
|
|
Jumlah |
30.574,10 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
53.100,90 |
| 2020 | 24.2.1.9 | Stopper/Uskup tebal 8 cm abu - abu | M | 53.100,90 | Tidak Dipakai | |
18 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.10 |
Stopper/Uskup tebal 6 cm warna |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.1.10 | Stopper/Uskup tebal 6 cm warna | lembar | 0,00 | Tidak Dipakai | |
19 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.10 |
Stopper/Uskup tebal 6 cm warna |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.10 | Stopper/Uskup tebal 6 cm warna | lembar | 0,00 | Tidak Dipakai | |
20 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.10 |
Stopper/Uskup tebal 6 cm warna |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.001 |
OH |
206.800,00 |
206,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
22.526,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.4 |
Pasir Pasang |
0.001 |
M3 |
180.100,00 |
180,10 |
117.1.1.12.1.103 |
Stopper/Uskup Tb 6 cm warna |
3.34 |
buah |
7.700,00 |
25.718,00 |
|
|
|
|
Jumlah |
25.898,10 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
48.424,90 |
| 2020 | 24.2.1.10 | Stopper/Uskup tebal 6 cm warna | M | 48.424,90 | Tidak Dipakai | |