101 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.96 |
Pemasangan Kusen Aluminium Type P 3 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.033 |
OH |
236.200,00 |
7.794,60 |
123.1.1.1.1.6 |
Mandor |
0.0055 |
OH |
206.800,00 |
1.137,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.32 |
OH |
150.800,00 |
199.056,01 |
123.1.1.1.1.23 |
Tukang |
0.66 |
OH |
177.500,00 |
117.150,00 |
|
|
|
|
Jumlah |
325.138,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.357 |
Kusen Aluminium Tipe P 3 |
1 |
unit |
1.160.600,00 |
1.160.600,00 |
|
|
|
|
Jumlah |
1.160.600,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.485.738,01 |
| 2020 | 24.1.10.96 | Pemasangan Kusen Aluminium Type P 3 | unit | 1.485.738,01 | Tidak Dipakai | |
102 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.95 |
beton mutu rendah fc=15 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
327.54 |
kilogram |
103.251,00 |
33.818.833,42 |
20.1.1.4.4.1 |
Pasir Cor |
0.5024 |
M3 |
243.000,00 |
122.083,20 |
20.1.1.5.1.4 |
Agregat Kasar |
0.9053 |
M3 |
261.700,00 |
236.917,02 |
20.1.1.28.4.3 |
Paku Triplek/Eternit |
3.2 |
Kg |
23.000,00 |
73.600,00 |
20.1.1.43.3.1 |
Kayu Kamper |
0.4 |
M3 |
7.219.000,00 |
2.887.600,04 |
|
|
|
|
Jumlah |
37.139.033,68 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.1 |
Sewa Truk |
0.0382 |
Hari |
815.000,00 |
31.133,00 |
23.2.5.11.9.1 |
Sewa Concrete Mixer |
0.6849 |
jam |
69.200,00 |
47.395,08 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
99.828,08 |
|
|
|
|
Nilai HSPK |
37.238.861,76 |
| 2019 | 24.3.1.95 | beton mutu rendah fc=15 Mpa | M3 | 37.238.861,76 | Tidak Dipakai | |
103 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.95 |
Campuran Aspal Dingin untuk Pelapisan |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0115 |
OH |
206.800,00 |
2.378,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1377 |
OH |
150.800,00 |
20.765,16 |
|
|
|
|
Jumlah |
23.143,36 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.18 |
Aspal Emulsi |
153.3 |
Kg |
1.300,00 |
199.290,00 |
117.1.1.1.5.57 |
Lolos screen 2 ukuran (0-5) |
1.3488 |
M3 |
277.500,00 |
374.291,98 |
|
|
|
|
Jumlah |
573.581,99 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
0.0803 |
jam |
228.200,00 |
18.324,46 |
123.2.2.1.2.24 |
Dump Truck |
0.3058 |
jam |
513.600,00 |
157.058,88 |
123.2.2.1.2.49 |
Tandem Roller |
0.0241 |
jam |
699.100,00 |
16.848,31 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
193.631,65 |
|
|
|
|
Nilai HSPK |
790.357,00 |
| 2020 | 24.2.3.95 | Campuran Aspal Dingin untuk Pelapisan | M3 | 790.357,00 | Tidak Dipakai | |
104 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.95 |
Pemasangan Kusen Aluminium Type P 2 K |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0264 |
OH |
236.200,00 |
6.235,68 |
123.1.1.1.1.6 |
Mandor |
0.0044 |
OH |
206.800,00 |
909,92 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.056 |
OH |
150.800,00 |
159.244,80 |
123.1.1.1.1.23 |
Tukang |
0.528 |
OH |
177.500,00 |
93.720,00 |
|
|
|
|
Jumlah |
260.110,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.356 |
Kusen Aluminium Tipe P 2 K |
1 |
unit |
933.800,00 |
933.800,00 |
|
|
|
|
Jumlah |
933.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.193.910,40 |
| 2020 | 24.1.10.95 | Pemasangan Kusen Aluminium Type P 2 K | unit | 1.193.910,40 | Tidak Dipakai | |
105 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.95 |
Menanam Pohon Duku Dewasa |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.156 |
Duku Dewasa |
1 |
Polibeg |
33.400,00 |
33.400,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
80.100,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
145.956,00 |
| 2020 | 24.2.6.95 | Menanam Pohon Duku Dewasa | Pohon | 145.956,00 | Tidak Dipakai | |
106 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.94 |
Menanam Pohon Cyclok Hijau (Bibir Putih Besar) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.148 |
Cyclok Hijau ( Bibir Putih Besar ) |
1 |
Pohon |
26.700,00 |
26.700,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
73.400,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
139.256,00 |
| 2020 | 24.2.6.94 | Menanam Pohon Cyclok Hijau (Bibir Putih Besar) | Pohon | 139.256,00 | Tidak Dipakai | |
107 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.94 |
LasTon Lapis Pondasi Modifikasi Perata (AC-Base(L)Mod) |
|
ton |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0029 |
OH |
206.800,00 |
599,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0287 |
OH |
150.800,00 |
4.327,96 |
|
|
|
|
Jumlah |
4.927,68 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.9 |
Filler |
9.87 |
Kg |
6.700,00 |
66.129,00 |
117.1.1.1.5.57 |
Lolos screen 2 ukuran (0-5) |
0.2394 |
M3 |
277.500,00 |
66.433,50 |
117.1.1.1.5.58 |
Lolos screen 2 ukuran (5-9,5) |
0.2953 |
M3 |
216.200,00 |
63.843,86 |
117.1.1.1.5.59 |
Lolos screen ukuran (9,5-19,0) |
0.1304 |
M3 |
196.800,00 |
25.662,72 |
|
|
|
|
Jumlah |
222.069,08 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.1 |
AMP |
0.0201 |
jam |
9.100.600,00 |
182.922,05 |
123.2.2.1.2.3 |
Asphalt Finisher |
0.0092 |
jam |
1.315.400,00 |
12.101,68 |
123.2.2.1.2.24 |
Dump Truck |
0.1506 |
jam |
513.600,00 |
77.348,16 |
123.2.2.1.2.30 |
Genset |
0.0201 |
jam |
825.800,00 |
16.598,58 |
123.2.2.1.2.44 |
Pneumatic Tyre Roller |
0.0052 |
jam |
653.700,00 |
3.399,24 |
123.2.2.1.2.49 |
Tandem Roller |
0.0091 |
jam |
699.100,00 |
6.361,81 |
123.2.2.1.2.64 |
Wheel Loader |
0.0173 |
jam |
844.500,00 |
14.609,85 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
314.741,38 |
|
|
|
|
Nilai HSPK |
541.738,14 |
| 2020 | 24.2.3.94 | LasTon Lapis Pondasi Modifikasi Perata (AC-Base(L)Mod) | ton | 541.738,14 | Tidak Dipakai | |
108 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.94 |
lataston lapis aus perata (HRS-WC(L)) (grada total harga(Rp.)) |
|
ton |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.6.2 |
Aspal Panas |
75.19 |
Kg |
13.750,00 |
1.033.862,53 |
20.1.1.2.1.2 |
Semen Mortar |
23.1 |
kilogram |
103.251,00 |
2.385.098,14 |
20.1.1.4.1.7 |
Pasir Halus |
0.2481 |
M2 |
147.473,00 |
36.588,05 |
|
|
|
|
Jumlah |
3.455.548,72 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.2 |
Sewa Truk Tangki Air |
0.1205 |
Hari |
526.800,00 |
63.479,40 |
23.2.5.11.5.2 |
Sewa Genset |
0.0201 |
unit |
2.750.000,00 |
55.275,00 |
23.2.5.11.6.6 |
Sewa Amp 10 T |
0.0201 |
jam |
276.300,00 |
5.553,63 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0096 |
jam |
608.800,00 |
5.844,48 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
151.452,51 |
|
|
|
|
Nilai HSPK |
3.607.001,23 |
| 2019 | 24.3.1.94 | lataston lapis aus perata (HRS-WC(L)) (grada total harga(Rp.)) | ton | 3.607.001,23 | Tidak Dipakai | |
109 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.94 |
Pemasangan Kusen Aluminium Type P 2 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0342 |
OH |
236.200,00 |
8.078,04 |
123.1.1.1.1.6 |
Mandor |
0.0057 |
OH |
206.800,00 |
1.178,76 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.368 |
OH |
150.800,00 |
206.294,40 |
123.1.1.1.1.23 |
Tukang |
0.684 |
OH |
177.500,00 |
121.410,00 |
|
|
|
|
Jumlah |
336.961,21 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.355 |
Kusen Aluminium Tipe P 2 |
1 |
unit |
1.200.600,00 |
1.200.600,00 |
|
|
|
|
Jumlah |
1.200.600,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.537.561,21 |
| 2020 | 24.1.10.94 | Pemasangan Kusen Aluminium Type P 2 | unit | 1.537.561,21 | Tidak Dipakai | |
110 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.93 |
beton mutu sedang fc=20 Mpa (untuk box culvert) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
422.3 |
kilogram |
103.251,00 |
43.602.896,04 |
20.1.1.4.4.1 |
Pasir Cor |
0.5412 |
M3 |
243.000,00 |
131.511,60 |
20.1.1.5.1.4 |
Agregat Kasar |
0.744 |
M3 |
261.700,00 |
194.704,80 |
20.1.1.28.4.3 |
Paku Triplek/Eternit |
1.6 |
Kg |
23.000,00 |
36.800,00 |
20.1.1.43.3.1 |
Kayu Kamper |
0.2 |
M3 |
7.219.000,00 |
1.443.800,02 |
|
|
|
|
Jumlah |
45.409.712,46 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.0382 |
jam |
69.200,00 |
2.643,44 |
23.2.5.11.9.1 |
Sewa Concrete Mixer |
0.1004 |
jam |
69.200,00 |
6.947,68 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
30.891,12 |
|
|
|
|
Nilai HSPK |
45.440.603,58 |
| 2019 | 24.3.1.93 | beton mutu sedang fc=20 Mpa (untuk box culvert) | M3 | 45.440.603,58 | Tidak Dipakai | |
111 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.93 |
Pemasangan Kusen Aluminium Type P 1 K |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.039 |
OH |
236.200,00 |
9.211,80 |
123.1.1.1.1.6 |
Mandor |
0.0065 |
OH |
206.800,00 |
1.344,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.56 |
OH |
150.800,00 |
235.247,99 |
123.1.1.1.1.23 |
Tukang |
0.78 |
OH |
177.500,00 |
138.449,99 |
|
|
|
|
Jumlah |
384.253,99 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.354 |
Kusen Aluminium Tipe P 1 K |
1 |
unit |
1.399.400,00 |
1.399.400,00 |
|
|
|
|
Jumlah |
1.399.400,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.783.653,99 |
| 2020 | 24.1.10.93 | Pemasangan Kusen Aluminium Type P 1 K | unit | 1.783.653,99 | Tidak Dipakai | |
112 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.93 |
LasTon Lapis Pondasi Perata (AC-Base(L)) |
|
ton |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0029 |
OH |
206.800,00 |
599,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0287 |
OH |
150.800,00 |
4.327,96 |
|
|
|
|
Jumlah |
4.927,68 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.17 |
Aspal |
49.44 |
Kg |
17.900,00 |
884.975,98 |
117.1.1.1.2.52 |
Semen |
9.975 |
Kg |
1.900,00 |
18.952,50 |
117.1.1.1.5.57 |
Lolos screen 2 ukuran (0-5) |
0.2416 |
M3 |
277.500,00 |
67.044,00 |
117.1.1.1.5.58 |
Lolos screen 2 ukuran (5-9,5) |
0.2981 |
M3 |
216.200,00 |
64.449,22 |
117.1.1.1.5.59 |
Lolos screen ukuran (9,5-19,0) |
0.1316 |
M3 |
196.800,00 |
25.898,88 |
|
|
|
|
Jumlah |
1.061.320,58 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.1 |
AMP |
0.0201 |
jam |
9.100.600,00 |
182.922,05 |
123.2.2.1.2.3 |
Asphalt Finisher |
0.0092 |
jam |
1.315.400,00 |
12.101,68 |
123.2.2.1.2.24 |
Dump Truck |
0.1205 |
jam |
513.600,00 |
61.888,80 |
123.2.2.1.2.30 |
Genset |
0.0201 |
jam |
825.800,00 |
16.598,58 |
123.2.2.1.2.44 |
Pneumatic Tyre Roller |
0.0052 |
jam |
653.700,00 |
3.399,24 |
123.2.2.1.2.49 |
Tandem Roller |
0.0091 |
jam |
699.100,00 |
6.361,81 |
123.2.2.1.2.64 |
Wheel Loader |
0.0096 |
jam |
844.500,00 |
8.107,20 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
292.779,36 |
|
|
|
|
Nilai HSPK |
1.359.027,62 |
| 2020 | 24.2.3.93 | LasTon Lapis Pondasi Perata (AC-Base(L)) | ton | 1.359.027,62 | Tidak Dipakai | |
113 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.93 |
Menanam Pohon Cyclok Belalang |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.146 |
Cyclok Belalang |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
152.656,00 |
| 2020 | 24.2.6.93 | Menanam Pohon Cyclok Belalang | Pohon | 152.656,00 | Tidak Dipakai | |
114 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.92 |
Menanam Pohon Cyclok |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.145 |
Cyclok |
1 |
Polibeg |
26.700,00 |
26.700,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
73.400,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
139.256,00 |
| 2020 | 24.2.6.92 | Menanam Pohon Cyclok | Pohon | 139.256,00 | Tidak Dipakai | |
115 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.92 |
lataston lapis aus(WRS-WC) gradasi senjang/semi senjang |
|
ton |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.6.2 |
Aspal Panas |
75.19 |
Kg |
13.750,00 |
1.033.862,53 |
20.1.1.2.1.2 |
Semen Mortar |
23.1 |
kilogram |
103.251,00 |
2.385.098,14 |
20.1.1.4.1.7 |
Pasir Halus |
0.2481 |
M2 |
147.473,00 |
36.588,05 |
|
|
|
|
Jumlah |
3.455.548,72 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.1 |
Sewa Truk |
0.1205 |
Hari |
815.000,00 |
98.207,50 |
23.2.5.11.5.2 |
Sewa Genset |
0.0201 |
unit |
2.750.000,00 |
55.275,00 |
23.2.5.11.6.2 |
Sewa Ashpalt Finisher |
0.0191 |
jam |
1.112.200,00 |
21.243,02 |
23.2.5.11.6.3 |
Sewa Pneumatic Tire Roller |
0.0043 |
jam |
234.200,00 |
1.007,06 |
23.2.5.11.6.4 |
Sewa Tandem Roller |
0.0156 |
jam |
281.000,00 |
4.383,60 |
23.2.5.11.6.6 |
Sewa Amp 10 T |
0.0201 |
jam |
276.300,00 |
5.553,63 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0096 |
jam |
608.800,00 |
5.844,48 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
212.814,29 |
|
|
|
|
Nilai HSPK |
3.668.363,01 |
| 2019 | 24.3.1.92 | lataston lapis aus(WRS-WC) gradasi senjang/semi senjang | ton | 3.668.363,01 | Tidak Dipakai | |
116 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.92 |
Pemasangan Kusen Aluminium Type P 1 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0492 |
OH |
236.200,00 |
11.621,04 |
123.1.1.1.1.6 |
Mandor |
0.0082 |
OH |
206.800,00 |
1.695,76 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.968 |
OH |
150.800,00 |
296.774,41 |
123.1.1.1.1.23 |
Tukang |
0.984 |
OH |
177.500,00 |
174.660,00 |
|
|
|
|
Jumlah |
484.751,21 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.353 |
Kusen Aluminium Tipe P 1 |
1 |
unit |
1.738.300,00 |
1.738.300,00 |
|
|
|
|
Jumlah |
1.738.300,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.223.051,21 |
| 2020 | 24.1.10.92 | Pemasangan Kusen Aluminium Type P 1 | unit | 2.223.051,21 | Tidak Dipakai | |
117 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.92 |
LasTon Lapis Pondasi Modifikasi (AC-Base Mod) |
|
ton |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0029 |
OH |
206.800,00 |
599,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0287 |
OH |
150.800,00 |
4.327,96 |
|
|
|
|
Jumlah |
4.927,68 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.9 |
Filler |
9.87 |
Kg |
6.700,00 |
66.129,00 |
117.1.1.1.5.57 |
Lolos screen 2 ukuran (0-5) |
0.2394 |
M3 |
277.500,00 |
66.433,50 |
117.1.1.1.5.58 |
Lolos screen 2 ukuran (5-9,5) |
0.2953 |
M3 |
216.200,00 |
63.843,86 |
117.1.1.1.5.59 |
Lolos screen ukuran (9,5-19,0) |
0.1304 |
M3 |
196.800,00 |
25.662,72 |
|
|
|
|
Jumlah |
222.069,08 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.1 |
AMP |
0.0201 |
jam |
9.100.600,00 |
182.922,05 |
123.2.2.1.2.3 |
Asphalt Finisher |
0.0092 |
jam |
1.315.400,00 |
12.101,68 |
123.2.2.1.2.24 |
Dump Truck |
0.1205 |
jam |
513.600,00 |
61.888,80 |
123.2.2.1.2.30 |
Genset |
0.0201 |
jam |
825.800,00 |
16.598,58 |
123.2.2.1.2.44 |
Pneumatic Tyre Roller |
0.0052 |
jam |
653.700,00 |
3.399,24 |
123.2.2.1.2.49 |
Tandem Roller |
0.0091 |
jam |
699.100,00 |
6.361,81 |
123.2.2.1.2.64 |
Wheel Loader |
0.0173 |
jam |
844.500,00 |
14.609,85 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
299.282,01 |
|
|
|
|
Nilai HSPK |
526.278,77 |
| 2020 | 24.2.3.92 | LasTon Lapis Pondasi Modifikasi (AC-Base Mod) | ton | 526.278,77 | Tidak Dipakai | |
118 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.91 |
Pemasangan Kusen Aluminium Type J 4 K |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0222 |
OH |
236.200,00 |
5.243,64 |
123.1.1.1.1.6 |
Mandor |
0.0037 |
OH |
206.800,00 |
765,16 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.888 |
OH |
150.800,00 |
133.910,40 |
123.1.1.1.1.23 |
Tukang |
0.444 |
OH |
177.500,00 |
78.810,00 |
|
|
|
|
Jumlah |
218.729,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.352 |
Kusen Aluminium Tipe J 4 K |
1 |
unit |
793.800,00 |
793.800,00 |
|
|
|
|
Jumlah |
793.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.012.529,20 |
| 2020 | 24.1.10.91 | Pemasangan Kusen Aluminium Type J 4 K | unit | 1.012.529,20 | Tidak Dipakai | |
119 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.91 |
Menanam Pohon Cycas Recoluta bercabang (0.5m-1m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.143 |
Cycas Recoluta bercabang (0.5m - 1m) |
1 |
Pohon |
1.334.000,00 |
1.334.000,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
1.380.700,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
1.446.556,00 |
| 2020 | 24.2.6.91 | Menanam Pohon Cycas Recoluta bercabang (0.5m-1m) | Pohon | 1.446.556,00 | Tidak Dipakai | |
120 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.91 |
LasTon Lapis Pondasi (AC-Base) |
|
ton |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0029 |
OH |
206.800,00 |
599,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0287 |
OH |
150.800,00 |
4.327,96 |
|
|
|
|
Jumlah |
4.927,68 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.17 |
Aspal |
49.44 |
Kg |
17.900,00 |
884.975,98 |
117.1.1.1.2.52 |
Semen |
9.975 |
Kg |
1.900,00 |
18.952,50 |
117.1.1.1.5.57 |
Lolos screen 2 ukuran (0-5) |
0.2416 |
M3 |
277.500,00 |
67.044,00 |
117.1.1.1.5.58 |
Lolos screen 2 ukuran (5-9,5) |
0.2981 |
M3 |
216.200,00 |
64.449,22 |
117.1.1.1.5.59 |
Lolos screen ukuran (9,5-19,0) |
0.1316 |
M3 |
196.800,00 |
25.898,88 |
|
|
|
|
Jumlah |
1.061.320,58 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.1 |
AMP |
0.0201 |
jam |
9.100.600,00 |
182.922,05 |
123.2.2.1.2.3 |
Asphalt Finisher |
0.0092 |
jam |
1.315.400,00 |
12.101,68 |
123.2.2.1.2.24 |
Dump Truck |
0.1205 |
jam |
513.600,00 |
61.888,80 |
123.2.2.1.2.30 |
Genset |
0.0201 |
jam |
825.800,00 |
16.598,58 |
123.2.2.1.2.44 |
Pneumatic Tyre Roller |
0.0052 |
jam |
653.700,00 |
3.399,24 |
123.2.2.1.2.49 |
Tandem Roller |
0.0091 |
jam |
699.100,00 |
6.361,81 |
123.2.2.1.2.64 |
Wheel Loader |
0.0096 |
jam |
844.500,00 |
8.107,20 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
292.779,36 |
|
|
|
|
Nilai HSPK |
1.359.027,62 |
| 2020 | 24.2.3.91 | LasTon Lapis Pondasi (AC-Base) | ton | 1.359.027,62 | Tidak Dipakai | |