21 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.122 |
Menanam Pohon Palem Putri (1-2m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.258 |
Palem Putri (1-2m) |
1 |
Pohon |
333.500,00 |
333.500,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
380.200,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
446.056,00 |
| 2020 | 24.2.6.122 | Menanam Pohon Palem Putri (1-2m) | Pohon | 446.056,00 | Tidak Dipakai | |
22 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.121 |
Pemasangan Kusen Aluminium Pintu&Jendela |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0624 |
OH |
236.200,00 |
14.738,88 |
123.1.1.1.1.6 |
Mandor |
0.0104 |
OH |
206.800,00 |
2.150,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.496 |
OH |
150.800,00 |
376.396,81 |
123.1.1.1.1.23 |
Tukang |
1.248 |
OH |
177.500,00 |
221.520,00 |
|
|
|
|
Jumlah |
614.806,41 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.344 |
Kusen Aluminium Pintu & Jendela |
1 |
unit |
2.929.800,00 |
2.929.800,00 |
|
|
|
|
Jumlah |
2.929.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
3.544.606,41 |
| 2020 | 24.1.10.121 | Pemasangan Kusen Aluminium Pintu&Jendela | unit | 3.544.606,41 | Tidak Dipakai | |
23 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.121 |
Menanam Pohon Palem Putri (0.3-0.5m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.257 |
Palem Putri (0,03-0,50m) |
1 |
Pohon |
133.400,00 |
133.400,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
180.100,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
245.956,00 |
| 2020 | 24.2.6.121 | Menanam Pohon Palem Putri (0.3-0.5m) | Pohon | 245.956,00 | Tidak Dipakai | |
24 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.120 |
Menanam Pohon Palem Mini Kuning/Palem Udang (0,6) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.254 |
Palerm Mini Kuning (0,6-1m) |
1 |
Pohon |
200.100,00 |
200.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
246.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
312.656,00 |
| 2020 | 24.2.6.120 | Menanam Pohon Palem Mini Kuning/Palem Udang (0,6) | Pohon | 312.656,00 | Tidak Dipakai | |
25 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.120 |
Pemasangan Kusen Aluminium Pintu Tipe 4 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.018 |
OH |
236.200,00 |
4.251,60 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.72 |
OH |
150.800,00 |
108.576,00 |
123.1.1.1.1.23 |
Tukang |
0.36 |
OH |
177.500,00 |
63.900,00 |
|
|
|
|
Jumlah |
177.348,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.343 |
Kusen Aluminium Pintu Tipe 4 |
1 |
unit |
835.000,00 |
835.000,00 |
|
|
|
|
Jumlah |
835.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.012.348,01 |
| 2020 | 24.1.10.120 | Pemasangan Kusen Aluminium Pintu Tipe 4 | unit | 1.012.348,01 | Tidak Dipakai | |
26 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.119 |
Menanam Pohon Palem Kuning (2-3m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.253 |
Palem Kuning (2-3m ) |
1 |
Pohon |
200.100,00 |
200.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
246.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
312.656,00 |
| 2020 | 24.2.6.119 | Menanam Pohon Palem Kuning (2-3m) | Pohon | 312.656,00 | Tidak Dipakai | |
27 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.119 |
Pemasangan Kusen Aluminium Pintu Tipe 3 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0198 |
OH |
236.200,00 |
4.676,76 |
123.1.1.1.1.6 |
Mandor |
0.0033 |
OH |
206.800,00 |
682,44 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.792 |
OH |
150.800,00 |
119.433,60 |
123.1.1.1.1.23 |
Tukang |
0.396 |
OH |
177.500,00 |
70.290,00 |
|
|
|
|
Jumlah |
195.082,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.342 |
Kusen Aluminium Pintu Tipe 3 |
1 |
unit |
945.500,00 |
945.500,00 |
|
|
|
|
Jumlah |
945.500,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.140.582,80 |
| 2020 | 24.1.10.119 | Pemasangan Kusen Aluminium Pintu Tipe 3 | unit | 1.140.582,80 | Tidak Dipakai | |
28 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.118 |
Pemasangan Kusen Aluminium Pintu Tipe 2 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.021 |
OH |
236.200,00 |
4.960,20 |
123.1.1.1.1.6 |
Mandor |
0.0035 |
OH |
206.800,00 |
723,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.84 |
OH |
150.800,00 |
126.672,00 |
123.1.1.1.1.23 |
Tukang |
0.42 |
OH |
177.500,00 |
74.550,00 |
|
|
|
|
Jumlah |
206.905,99 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.341 |
Kusen Aluminium Pintu Tipe 2 |
1 |
unit |
982.800,00 |
982.800,00 |
|
|
|
|
Jumlah |
982.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.189.705,99 |
| 2020 | 24.1.10.118 | Pemasangan Kusen Aluminium Pintu Tipe 2 | unit | 1.189.705,99 | Tidak Dipakai | |
29 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.118 |
Menanam Pohon Palem Kuning (0,5-1m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.252 |
Palem Kuning (0,5-1m) |
1 |
Pohon |
100.100,00 |
100.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
146.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
212.656,00 |
| 2020 | 24.2.6.118 | Menanam Pohon Palem Kuning (0,5-1m) | Pohon | 212.656,00 | Tidak Dipakai | |
30 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.117 |
Pemasangan Kusen Aluminium Pintu Tipe 1 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0312 |
OH |
236.200,00 |
7.369,44 |
123.1.1.1.1.6 |
Mandor |
0.0052 |
OH |
206.800,00 |
1.075,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.248 |
OH |
150.800,00 |
188.198,40 |
123.1.1.1.1.23 |
Tukang |
0.624 |
OH |
177.500,00 |
110.760,00 |
|
|
|
|
Jumlah |
307.403,21 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.340 |
Kusen Aluminium Pintu Tipe 1 |
1 |
unit |
1.464.800,00 |
1.464.800,00 |
|
|
|
|
Jumlah |
1.464.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.772.203,21 |
| 2020 | 24.1.10.117 | Pemasangan Kusen Aluminium Pintu Tipe 1 | unit | 1.772.203,21 | Tidak Dipakai | |
31 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.117 |
Menanam Pohon Palem Kenari (2-2,5m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.251 |
Palem Kenari (2-2,5m) |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
152.656,00 |
| 2020 | 24.2.6.117 | Menanam Pohon Palem Kenari (2-2,5m) | Pohon | 152.656,00 | Tidak Dipakai | |
32 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.116 |
Menanam Pohon Palem Kenari (1,5-2m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
46.700,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
112.556,00 |
| 2020 | 24.2.6.116 | Menanam Pohon Palem Kenari (1,5-2m) | Pohon | 112.556,00 | Tidak Dipakai | |
33 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.116 |
Pemasangan Kusen Aluminium Jendela Tipe 8 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.009 |
OH |
236.200,00 |
2.125,80 |
123.1.1.1.1.6 |
Mandor |
0.0015 |
OH |
206.800,00 |
310,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.36 |
OH |
150.800,00 |
54.288,00 |
123.1.1.1.1.23 |
Tukang |
0.18 |
OH |
177.500,00 |
31.950,00 |
|
|
|
|
Jumlah |
88.674,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.339 |
Kusen Aluminium Jendela Tipe 8 |
1 |
unit |
418.400,00 |
418.400,00 |
|
|
|
|
Jumlah |
418.400,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
507.074,00 |
| 2020 | 24.1.10.116 | Pemasangan Kusen Aluminium Jendela Tipe 8 | unit | 507.074,00 | Tidak Dipakai | |
34 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.115 |
Menanam Pohon Palem Eleventaris |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.247 |
Palem Eleventaris |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
152.656,00 |
| 2020 | 24.2.6.115 | Menanam Pohon Palem Eleventaris | Pohon | 152.656,00 | Tidak Dipakai | |
35 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.115 |
Pemasangan Kusen Aluminium Jendela Tipe 7 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0132 |
OH |
236.200,00 |
3.117,84 |
123.1.1.1.1.6 |
Mandor |
0.0022 |
OH |
206.800,00 |
454,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.528 |
OH |
150.800,00 |
79.622,40 |
123.1.1.1.1.23 |
Tukang |
0.264 |
OH |
177.500,00 |
46.860,00 |
|
|
|
|
Jumlah |
130.055,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.338 |
Kusen Aluminium Jendela Tipe 7 |
1 |
unit |
629.700,00 |
629.700,00 |
|
|
|
|
Jumlah |
629.700,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
759.755,20 |
| 2020 | 24.1.10.115 | Pemasangan Kusen Aluminium Jendela Tipe 7 | unit | 759.755,20 | Tidak Dipakai | |
36 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.114 |
campuran aspal dingin untuk pelapisan I |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.6.1 |
Aspal Panas |
153.3 |
Kg |
13.500,00 |
2.069.550,04 |
|
|
|
|
Jumlah |
2.069.550,04 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.3058 |
jam |
69.200,00 |
21.161,36 |
23.2.5.11.8.1 |
Sewa Vibrator Roller |
0.0241 |
jam |
143.700,00 |
3.463,17 |
23.2.5.11.9.1 |
Sewa Concrete Mixer |
0.0803 |
jam |
69.200,00 |
5.556,76 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
51.481,29 |
|
|
|
|
Nilai HSPK |
2.121.031,33 |
| 2019 | 24.3.1.114 | campuran aspal dingin untuk pelapisan I | M3 | 2.121.031,33 | Tidak Dipakai | |
37 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.114 |
Menanam Pohon Palem Ekor Tupai(1-1.5m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.246 |
Palem Ekor Tupai(1-1.5m) |
1 |
Pohon |
266.800,00 |
266.800,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
313.500,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
379.356,00 |
| 2020 | 24.2.6.114 | Menanam Pohon Palem Ekor Tupai(1-1.5m) | Pohon | 379.356,00 | Tidak Dipakai | |
38 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.114 |
Pemasangan Kusen Aluminium Jendela Tipe 6 |
|
unit |
|
|
|
Upah: |
|
|
|
|
117.1.1.1.22.337 |
Kusen Aluminium Jendela Tipe 6 |
1 |
unit |
835.000,00 |
835.000,00 |
123.1.1.1.1.5 |
Kepala Tukang |
0.018 |
OH |
236.200,00 |
4.251,60 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.72 |
OH |
150.800,00 |
108.576,00 |
123.1.1.1.1.23 |
Tukang |
0.36 |
OH |
177.500,00 |
63.900,00 |
|
|
|
|
Jumlah |
1.012.348,01 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.012.348,01 |
| 2020 | 24.1.10.114 | Pemasangan Kusen Aluminium Jendela Tipe 6 | unit | 1.012.348,01 | Tidak Dipakai | |
39 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.113 |
laston lapis pondasi perata (ac base(l) |
|
ton |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.6.1 |
Aspal Panas |
49.44 |
Kg |
13.500,00 |
667.439,98 |
20.1.1.2.1.2 |
Semen Mortar |
9.975 |
kilogram |
103.251,00 |
1.029.928,76 |
|
|
|
|
Jumlah |
1.697.368,75 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.1205 |
jam |
69.200,00 |
8.338,60 |
23.2.5.11.5.2 |
Sewa Genset |
0.0201 |
unit |
2.750.000,00 |
55.275,00 |
23.2.5.11.6.2 |
Sewa Ashpalt Finisher |
0.0092 |
jam |
1.112.200,00 |
10.232,24 |
23.2.5.11.6.3 |
Sewa Pneumatic Tire Roller |
0.0052 |
jam |
234.200,00 |
1.217,84 |
23.2.5.11.6.4 |
Sewa Tandem Roller |
0.0091 |
jam |
281.000,00 |
2.557,10 |
23.2.5.11.6.6 |
Sewa Amp 10 T |
0.0201 |
jam |
276.300,00 |
5.553,63 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0096 |
jam |
608.800,00 |
5.844,48 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
110.318,89 |
|
|
|
|
Nilai HSPK |
1.807.687,63 |
| 2019 | 24.3.1.113 | laston lapis pondasi perata (ac base(l) | ton | 1.807.687,63 | Tidak Dipakai | |
40 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.113 |
Menanam Pohon Palem Ekor Tupai (0,5-1m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.243 |
Palem Ekor Tupai (0,5-1m) |
1 |
Pohon |
233.500,00 |
233.500,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
280.200,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
346.056,00 |
| 2020 | 24.2.6.113 | Menanam Pohon Palem Ekor Tupai (0,5-1m) | Pohon | 346.056,00 | Tidak Dipakai | |