24.1.10.76 |
Pemasangan Kusen Metal Jendela Tipe 6 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.018 |
OH |
236.200,00 |
4.251,60 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.72 |
OH |
150.800,00 |
108.576,00 |
123.1.1.1.1.23 |
Tukang |
0.36 |
OH |
177.500,00 |
63.900,00 |
|
|
|
|
Jumlah |
177.348,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.375 |
Kusen Metal Jendela Tipe 6 |
1 |
unit |
716.400,00 |
716.400,00 |
|
|
|
|
Jumlah |
716.400,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
893.748,01 |
| 2020 | 24.1.10.76 | Pemasangan Kusen Metal Jendela Tipe 6 | unit | 893.748,01 | Tidak Dipakai | |
182 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.76 |
Bahan Aspal untuk Pekerjaan Pelaburan 1 |
|
liter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0001 |
OH |
206.800,00 |
20,68 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0003 |
OH |
150.800,00 |
45,24 |
|
|
|
|
Jumlah |
65,92 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.17 |
Aspal |
0.976 |
Kg |
17.900,00 |
17.470,40 |
117.1.1.1.21.1 |
Kerosene |
0.066 |
liter |
10.700,00 |
706,20 |
|
|
|
|
Jumlah |
18.176,60 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.2 |
Asphalt Distributor |
0.0002 |
jam |
680.400,00 |
136,08 |
123.2.2.1.2.12 |
Compressor |
0.0002 |
jam |
332.200,00 |
66,44 |
|
|
|
|
Jumlah |
202,52 |
|
|
|
|
Nilai HSPK |
18.445,04 |
| 2020 | 24.2.3.76 | Bahan Aspal untuk Pekerjaan Pelaburan 1 | liter | 18.445,04 | Tidak Dipakai | |
183 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.76 |
Menanam Pohon Bambu Kuning |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.90 |
Bambu Kuning |
1 |
Pohon |
8.100,00 |
8.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
54.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
120.656,00 |
| 2020 | 24.2.6.76 | Menanam Pohon Bambu Kuning | Pohon | 120.656,00 | Tidak Dipakai | |
184 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.76 |
Pekerjaan Dinding Beton Bekisting (100 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.262 |
OH |
236.200,00 |
61.884,40 |
123.1.1.1.1.6 |
Mandor |
0.265 |
OH |
206.800,00 |
54.802,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.3 |
OH |
150.800,00 |
799.240,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.05 |
OH |
177.500,00 |
186.374,99 |
123.1.1.1.1.28 |
Tukang Kayu |
1.3 |
OH |
177.500,00 |
230.749,99 |
|
|
|
|
Jumlah |
1.381.863,91 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
105 |
Kg |
16.900,00 |
1.774.500,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
1.6 |
Kg |
14.700,00 |
23.520,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
20 |
batang |
26.700,00 |
534.000,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.4 |
M3 |
6.403.200,00 |
2.561.280,04 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
2.8 |
lembar |
133.400,00 |
373.519,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
3.2 |
Kg |
34.700,00 |
111.040,00 |
117.1.1.1.22.542 |
Kawat Beton |
2.25 |
Kg |
34.882,00 |
78.484,50 |
|
|
|
|
Jumlah |
6.379.480,51 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
7.761.344,42 |
| 2020 | 24.1.4.76 | Pekerjaan Dinding Beton Bekisting (100 kg besi + Bekisting) | M3 | 7.761.344,42 | Tidak Dipakai | |
185 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.75 |
Pemasangan Kusen Metal Jendela Tipe 5 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0222 |
OH |
236.200,00 |
5.243,64 |
123.1.1.1.1.6 |
Mandor |
0.0037 |
OH |
206.800,00 |
765,16 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.888 |
OH |
150.800,00 |
133.910,40 |
123.1.1.1.1.23 |
Tukang |
0.444 |
OH |
177.500,00 |
78.810,00 |
|
|
|
|
Jumlah |
218.729,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.374 |
Kusen Metal Jendela Tipe 5 |
1 |
unit |
899.200,00 |
899.200,00 |
|
|
|
|
Jumlah |
899.200,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.117.929,20 |
| 2020 | 24.1.10.75 | Pemasangan Kusen Metal Jendela Tipe 5 | unit | 1.117.929,20 | Tidak Dipakai | |
186 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.75 |
Beton Mutu Sedang Fc 25 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.75 | Beton Mutu Sedang Fc 25 Mpa | M3 | 0,00 | Tidak Dipakai | |
187 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.75 |
Pekerjaan Dinding Beton Bertulang (125 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.262 |
OH |
236.200,00 |
61.884,40 |
123.1.1.1.1.6 |
Mandor |
0.265 |
OH |
206.800,00 |
54.802,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.3 |
OH |
150.800,00 |
799.240,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.05 |
OH |
177.500,00 |
186.374,99 |
123.1.1.1.1.28 |
Tukang Kayu |
1.3 |
OH |
177.500,00 |
230.749,99 |
|
|
|
|
Jumlah |
1.381.863,91 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
131.25 |
Kg |
16.900,00 |
2.218.125,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
1.6 |
Kg |
14.700,00 |
23.520,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
20 |
batang |
26.700,00 |
534.000,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.4 |
M3 |
6.403.200,00 |
2.561.280,04 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
2.8 |
lembar |
133.400,00 |
373.519,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
3.2 |
Kg |
34.700,00 |
111.040,00 |
117.1.1.1.22.542 |
Kawat Beton |
2.25 |
Kg |
34.882,00 |
78.484,50 |
|
|
|
|
Jumlah |
6.823.105,51 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
8.204.969,42 |
| 2020 | 24.1.4.75 | Pekerjaan Dinding Beton Bertulang (125 kg besi + Bekisting) | M3 | 8.204.969,42 | Tidak Dipakai | |
188 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.75 |
Menanam Pohon Bambu |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.87 |
Bambu |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
152.656,00 |
| 2020 | 24.2.6.75 | Menanam Pohon Bambu | Pohon | 152.656,00 | Tidak Dipakai | |
189 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.75 |
Aggregat Penutup BURDA |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0506 |
OH |
150.800,00 |
7.630,48 |
|
|
|
|
Jumlah |
8.147,48 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.31 |
Chipping |
35 |
Kg |
300,00 |
10.500,00 |
|
|
|
|
Jumlah |
10.500,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.0241 |
jam |
513.600,00 |
12.377,76 |
123.2.2.1.2.44 |
Pneumatic Tyre Roller |
0.0011 |
jam |
653.700,00 |
719,07 |
123.2.2.1.2.64 |
Wheel Loader |
0.0177 |
jam |
844.500,00 |
14.947,65 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
29.444,48 |
|
|
|
|
Nilai HSPK |
48.091,96 |
| 2020 | 24.2.3.75 | Aggregat Penutup BURDA | M2 | 48.091,96 | Tidak Dipakai | |
190 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.74 |
Beton Mutu Sedang Fc 30 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.74 | Beton Mutu Sedang Fc 30 Mpa | M3 | 0,00 | Tidak Dipakai | |
191 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.74 |
Menanam Pohon Asem Glugur |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.79 |
Asam Glugur |
1 |
Pohon |
33.400,00 |
33.400,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
80.100,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
145.956,00 |
| 2020 | 24.2.6.74 | Menanam Pohon Asem Glugur | Pohon | 145.956,00 | Tidak Dipakai | |
192 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.74 |
Aggregat Penutup BURTU 1 |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0015 |
OH |
206.800,00 |
310,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0304 |
OH |
150.800,00 |
4.584,32 |
|
|
|
|
Jumlah |
4.894,52 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.31 |
Chipping |
23 |
Kg |
300,00 |
6.900,00 |
|
|
|
|
Jumlah |
6.900,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.0165 |
jam |
513.600,00 |
8.474,40 |
123.2.2.1.2.44 |
Pneumatic Tyre Roller |
0.0005 |
jam |
653.700,00 |
326,85 |
123.2.2.1.2.64 |
Wheel Loader |
0.0106 |
jam |
844.500,00 |
8.951,70 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
19.152,95 |
|
|
|
|
Nilai HSPK |
30.947,47 |
| 2020 | 24.2.3.74 | Aggregat Penutup BURTU 1 | M2 | 30.947,47 | Tidak Dipakai | |
193 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.74 |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.262 |
OH |
236.200,00 |
61.884,40 |
123.1.1.1.1.6 |
Mandor |
0.265 |
OH |
206.800,00 |
54.802,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.3 |
OH |
150.800,00 |
799.240,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.05 |
OH |
177.500,00 |
186.374,99 |
123.1.1.1.1.28 |
Tukang Kayu |
1.3 |
OH |
177.500,00 |
230.749,99 |
|
|
|
|
Jumlah |
1.381.863,91 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
157.5 |
Kg |
16.900,00 |
2.661.750,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
1.6 |
Kg |
14.700,00 |
23.520,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
20 |
batang |
26.700,00 |
534.000,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.4 |
M3 |
6.403.200,00 |
2.561.280,04 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
2.8 |
lembar |
133.400,00 |
373.519,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
3.2 |
Kg |
34.700,00 |
111.040,00 |
117.1.1.1.22.542 |
Kawat Beton |
2.25 |
Kg |
34.882,00 |
78.484,50 |
|
|
|
|
Jumlah |
7.266.730,51 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
8.648.594,42 |
| 2020 | 24.1.4.74 | Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) | M3 | 8.648.594,42 | Tidak Dipakai | |
194 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.74 |
Pemasangan Kusen Metal Jendela Tipe 4 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0162 |
OH |
236.200,00 |
3.826,44 |
123.1.1.1.1.6 |
Mandor |
0.0027 |
OH |
206.800,00 |
558,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.648 |
OH |
150.800,00 |
97.718,40 |
123.1.1.1.1.23 |
Tukang |
0.324 |
OH |
177.500,00 |
57.510,00 |
|
|
|
|
Jumlah |
159.613,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.373 |
Kusen Jendela Metal Tipe 4 |
1 |
unit |
644.400,00 |
644.400,00 |
|
|
|
|
Jumlah |
644.400,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
804.013,20 |
| 2020 | 24.1.10.74 | Pemasangan Kusen Metal Jendela Tipe 4 | unit | 804.013,20 | Tidak Dipakai | |
195 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.73 |
Menanam Pohon Agave |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.44 |
Agave hijau |
1 |
Pohon |
66.700,00 |
66.700,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
113.400,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
179.256,00 |
| 2020 | 24.2.6.73 | Menanam Pohon Agave | Pohon | 179.256,00 | Tidak Dipakai | |
196 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.73 |
Beton Mutu Tinggi Fc 35 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.73 | Beton Mutu Tinggi Fc 35 Mpa | M3 | 0,00 | Tidak Dipakai | |
197 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.73 |
Lapis Perekat - Aspal Cair |
|
liter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0001 |
OH |
206.800,00 |
20,68 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0003 |
OH |
150.800,00 |
45,24 |
|
|
|
|
Jumlah |
65,92 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.17 |
Aspal |
0.8487 |
Kg |
17.900,00 |
15.191,73 |
117.1.1.1.21.1 |
Kerosene |
0.206 |
liter |
10.700,00 |
2.204,20 |
|
|
|
|
Jumlah |
17.395,93 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.2 |
Asphalt Distributor |
0.0002 |
jam |
680.400,00 |
136,08 |
123.2.2.1.2.12 |
Compressor |
0.0002 |
jam |
332.200,00 |
66,44 |
|
|
|
|
Jumlah |
202,52 |
|
|
|
|
Nilai HSPK |
17.664,37 |
| 2020 | 24.2.3.73 | Lapis Perekat - Aspal Cair | liter | 17.664,37 | Tidak Dipakai | |
198 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.73 |
Pekerjaan Dinding Beton Bertulang (200 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.262 |
OH |
236.200,00 |
61.884,40 |
123.1.1.1.1.6 |
Mandor |
0.265 |
OH |
206.800,00 |
54.802,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.3 |
OH |
150.800,00 |
799.240,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.05 |
OH |
177.500,00 |
186.374,99 |
123.1.1.1.1.28 |
Tukang Kayu |
1.3 |
OH |
177.500,00 |
230.749,99 |
|
|
|
|
Jumlah |
1.381.863,91 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
210 |
Kg |
16.900,00 |
3.549.000,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
1.6 |
Kg |
14.700,00 |
23.520,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
20 |
batang |
26.700,00 |
534.000,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.4 |
M3 |
6.403.200,00 |
2.561.280,04 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
2.8 |
lembar |
133.400,00 |
373.519,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
3.2 |
Kg |
34.700,00 |
111.040,00 |
117.1.1.1.22.542 |
Kawat Beton |
2.25 |
Kg |
34.882,00 |
78.484,50 |
|
|
|
|
Jumlah |
8.153.980,51 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
9.535.844,42 |
| 2020 | 24.1.4.73 | Pekerjaan Dinding Beton Bertulang (200 kg besi + Bekisting) | M3 | 9.535.844,42 | Tidak Dipakai | |
199 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.73 |
Pemasangan Kusen Metal Jendela Tipe 3 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0288 |
OH |
236.200,00 |
6.802,56 |
123.1.1.1.1.6 |
Mandor |
0.0048 |
OH |
206.800,00 |
992,64 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.152 |
OH |
150.800,00 |
173.721,59 |
123.1.1.1.1.23 |
Tukang |
0.576 |
OH |
177.500,00 |
102.240,00 |
|
|
|
|
Jumlah |
283.756,79 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.372 |
Kusen Metal Jendela Tipe 3 |
1 |
unit |
1.168.600,00 |
1.168.600,00 |
|
|
|
|
Jumlah |
1.168.600,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.452.356,79 |
| 2020 | 24.1.10.73 | Pemasangan Kusen Metal Jendela Tipe 3 | unit | 1.452.356,79 | Tidak Dipakai | |
200 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.72 |
Pekerjaan Kolom Beton Bertulang (100 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.265 |
OH |
236.200,00 |
62.593,00 |
123.1.1.1.1.6 |
Mandor |
0.265 |
OH |
206.800,00 |
54.802,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.3 |
OH |
150.800,00 |
799.240,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.05 |
OH |
177.500,00 |
186.374,99 |
123.1.1.1.1.28 |
Tukang Kayu |
1.3 |
OH |
177.500,00 |
230.749,99 |
|
|
|
|
Jumlah |
1.382.572,51 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
105 |
Kg |
16.900,00 |
1.774.500,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
1.6 |
Kg |
14.700,00 |
23.520,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
20 |
batang |
26.700,00 |
534.000,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.44 |
M3 |
6.403.200,00 |
2.817.407,98 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
2.8 |
lembar |
133.400,00 |
373.519,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
3.2 |
Kg |
34.700,00 |
111.040,00 |
117.1.1.1.22.542 |
Kawat Beton |
2.25 |
Kg |
34.882,00 |
78.484,50 |
|
|
|
|
Jumlah |
6.635.608,46 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
8.018.180,96 |
| 2020 | 24.1.4.72 | Pekerjaan Kolom Beton Bertulang (100 kg besi + Bekisting) | M3 | 8.018.180,96 | Tidak Dipakai | |