161 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.3 |
Pekerjaan Beton K-150 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.1.3 | Pekerjaan Beton K-150 | 500 Biji | 0,00 | Tidak Dipakai | |
162 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.3 |
PemoTongan Pohon Pilihan diameter 50 – 75 cm |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
|
|
|
|
Jumlah |
85.740,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.10 |
Chain Saw |
1 |
jam |
100.100,00 |
100.100,00 |
123.2.2.1.2.24 |
Dump Truck |
0.7246 |
jam |
513.600,00 |
372.154,57 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
473.654,57 |
|
|
|
|
Nilai HSPK |
559.394,57 |
| 2020 | 24.2.6.3 | PemoTongan Pohon Pilihan diameter 50 – 75 cm | buah | 559.394,57 | Tidak Dipakai | |
163 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.3 |
Pemasangan Lantai Keramik ukurana 20x25 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.035 |
OH |
206.800,00 |
7.238,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7 |
OH |
150.800,00 |
105.560,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
183.190,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
10.4 |
Kg |
2.600,00 |
27.040,00 |
117.1.1.1.2.58 |
Semen Warna |
1.62 |
Zak |
114.800,00 |
185.976,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.045 |
M3 |
180.100,00 |
8.104,50 |
117.1.1.12.1.70 |
Keramik 20 x 25 cm |
20 |
buah |
4.700,00 |
94.000,00 |
|
|
|
|
Jumlah |
315.120,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
498.310,50 |
| 2020 | 24.1.8.3 | Pemasangan Lantai Keramik ukurana 20x25 cm | M2 | 498.310,50 | Tidak Dipakai | |
164 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.3 |
Pemasangan Tegel Keramik 40x40 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.5.1.3 | Pemasangan Tegel Keramik 40x40 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
165 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.11.3 |
Pemasangan Saklar Tunggal |
|
titik |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2020 | 24.1.11.3 | Pemasangan Saklar Tunggal | titik | 0,00 | Tidak Dipakai | |
166 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.3 |
Pemasangan Turap Bambu tinggi 2,75 m |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.3 | Pemasangan Turap Bambu tinggi 2,75 m | lembar | 0,00 | Tidak Dipakai | |
167 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.2.3 |
Pemasangan Saklar Tunggal |
|
cup |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.7.2.3 | Pemasangan Saklar Tunggal | cup | 0,00 | Tidak Dipakai | |
168 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.3 |
Pemasangan Kabel Bawah Tanah |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.3 | Pemasangan Kabel Bawah Tanah | lembar | 0,00 | Tidak Dipakai | |
169 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.3 |
Pemasangan Konstruksi Kuda-Kuda Konvensional Kayu Kelas III bentang 6 m. |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
1.2 |
OH |
236.200,00 |
283.440,01 |
123.1.1.1.1.6 |
Mandor |
0.2 |
OH |
206.800,00 |
41.360,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
4 |
OH |
150.800,00 |
603.200,00 |
123.1.1.1.1.23 |
Tukang |
12 |
OH |
177.500,00 |
2.130.000,00 |
|
|
|
|
Jumlah |
3.058.000,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
1.1 |
M3 |
6.403.200,00 |
7.043.520,15 |
117.1.1.1.22.236 |
Paku 4 inchi |
5.6 |
Kg |
24.100,00 |
134.960,00 |
|
|
|
|
Jumlah |
7.178.480,15 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
10.236.480,16 |
| 2020 | 24.1.9.3 | Pemasangan Konstruksi Kuda-Kuda Konvensional Kayu Kelas III bentang 6 m. | M3 | 10.236.480,16 | Tidak Dipakai | |
170 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.2.3 |
Pelapisan Waterproofing |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.2.3 | Pelapisan Waterproofing | 10 Pcs | 0,00 | Tidak Dipakai | |
171 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.4 |
Biaya Menggilas dengan Mesin Gilas (Tandem) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.4 | Biaya Menggilas dengan Mesin Gilas (Tandem) | Pohon | 0,00 | Tidak Dipakai | |
172 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.4 |
Pengukuran dan Pembuatan Bouwplank |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
36.226,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.012 |
M3 |
6.403.200,00 |
76.838,40 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.02 |
Kg |
34.700,00 |
694,00 |
|
|
|
|
Jumlah |
77.532,40 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
113.758,40 |
| 2020 | 24.1.1.4 | Pengukuran dan Pembuatan Bouwplank | M1 | 113.758,40 | Tidak Dipakai | |
173 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.2.4 |
Pengecatan Genteng |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.4.2.4 | Pengecatan Genteng | 10 Pcs | 0,00 | Tidak Dipakai | |
174 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.3.4 |
Pemasangan Dasar Saluran R.10 (1/2 lingkaran) |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.7.3.4 | Pemasangan Dasar Saluran R.10 (1/2 lingkaran) | lembar | 0,00 | Tidak Dipakai | |
175 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.2.4 |
Pengecatan Genteng |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.2.4 | Pengecatan Genteng | 10 Pcs | 0,00 | Tidak Dipakai | |
176 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.4 |
Pemasangan konstruksi gordeng kayu kelas II |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
2.01 |
OH |
236.200,00 |
474.762,00 |
123.1.1.1.1.6 |
Mandor |
0.335 |
OH |
206.800,00 |
69.278,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
6.7 |
OH |
150.800,00 |
1.010.359,97 |
123.1.1.1.1.23 |
Tukang |
20.1 |
OH |
177.500,00 |
3.567.750,07 |
|
|
|
|
Jumlah |
5.122.150,04 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
1.1 |
M3 |
14.567.300,00 |
16.024.030,35 |
117.1.1.1.22.236 |
Paku 4 inchi |
3 |
Kg |
24.100,00 |
72.300,00 |
|
|
|
|
Jumlah |
16.096.330,35 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
21.218.480,39 |
| 2020 | 24.1.9.4 | Pemasangan konstruksi gordeng kayu kelas II | M3 | 21.218.480,39 | Tidak Dipakai | |
177 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.4 |
Pemasangan Atap Sirap Asbes Tebal 4 mm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.4 | Pemasangan Atap Sirap Asbes Tebal 4 mm | 10 Pcs | 0,00 | Tidak Dipakai | |
178 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.4 |
Lantai Kerja K-100 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.1.4 | Lantai Kerja K-100 | 500 Biji | 0,00 | Tidak Dipakai | |
179 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.4 |
Pemasangan Trucuk Bambu φ 10 s/d 12 - P.3 m |
|
batang |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.2.1.4 | Pemasangan Trucuk Bambu φ 10 s/d 12 - P.3 m | batang | 0,00 | Tidak Dipakai | |
180 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.4 |
Pemasangan Lantai Keramik ukuran 60x60 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.035 |
OH |
206.800,00 |
7.238,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7 |
OH |
150.800,00 |
105.560,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
183.190,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
10.4 |
Kg |
2.600,00 |
27.040,00 |
117.1.1.1.2.58 |
Semen Warna |
1.62 |
Zak |
114.800,00 |
185.976,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.045 |
M3 |
180.100,00 |
8.104,50 |
117.1.1.12.1.77 |
Keramik 60 x 60 cm |
3 |
kotak |
151.900,00 |
455.700,00 |
|
|
|
|
Jumlah |
676.820,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
860.010,50 |
| 2020 | 24.1.8.4 | Pemasangan Lantai Keramik ukuran 60x60 cm | M2 | 860.010,50 | Tidak Dipakai | |