161 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.64 |
Kerb Pracetak yang digunakan kembali |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0287 |
OH |
206.800,00 |
5.935,16 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1721 |
OH |
150.800,00 |
25.952,68 |
123.1.1.1.1.23 |
Tukang |
0.0574 |
OH |
177.500,00 |
10.188,50 |
|
|
|
|
Jumlah |
42.076,34 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.45 |
Mortar |
0.0165 |
M3 |
48.100,00 |
793,65 |
|
|
|
|
Jumlah |
793,65 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
0.0778 |
jam |
228.200,00 |
17.753,96 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
19.153,96 |
|
|
|
|
Nilai HSPK |
62.023,95 |
| 2020 | 24.2.5.64 | Kerb Pracetak yang digunakan kembali | M | 62.023,95 | Tidak Dipakai | |
162 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.63 |
Kerb Pracetak Jenis 7 (Kerb pd pelandaian trotoar) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0098 |
OH |
206.800,00 |
2.026,64 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0977 |
OH |
150.800,00 |
14.733,16 |
123.1.1.1.1.23 |
Tukang |
0.0391 |
OH |
177.500,00 |
6.940,25 |
|
|
|
|
Jumlah |
23.700,05 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
0.3316 |
M3 |
1.534.100,00 |
508.707,58 |
117.1.1.1.2.45 |
Mortar |
0.0294 |
M3 |
48.100,00 |
1.414,14 |
|
|
|
|
Jumlah |
510.121,72 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.29 |
Flat Bed Truck |
0.0684 |
jam |
844.500,00 |
57.763,80 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
59.163,80 |
|
|
|
|
Nilai HSPK |
592.985,57 |
| 2020 | 24.2.5.63 | Kerb Pracetak Jenis 7 (Kerb pd pelandaian trotoar) | M1 | 592.985,57 | Tidak Dipakai | |
163 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.62 |
Kerb Pracetak Jenis 6 (Kerb dengan bukaan) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0069 |
OH |
206.800,00 |
1.426,92 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0687 |
OH |
150.800,00 |
10.359,96 |
123.1.1.1.1.23 |
Tukang |
0.0275 |
OH |
177.500,00 |
4.881,25 |
|
|
|
|
Jumlah |
16.668,13 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
0.0246 |
M3 |
1.534.100,00 |
37.738,86 |
117.1.1.1.2.45 |
Mortar |
0.0105 |
M3 |
48.100,00 |
505,05 |
|
|
|
|
Jumlah |
38.243,91 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.29 |
Flat Bed Truck |
0.0481 |
jam |
844.500,00 |
40.620,45 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
42.020,45 |
|
|
|
|
Nilai HSPK |
96.932,49 |
| 2020 | 24.2.5.62 | Kerb Pracetak Jenis 6 (Kerb dengan bukaan) | M1 | 96.932,49 | Tidak Dipakai | |
164 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.61 |
Kerb Pracetak Jenis 5 (Penghalang Berparit) t=30 cm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0069 |
OH |
206.800,00 |
1.426,92 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0687 |
OH |
150.800,00 |
10.359,96 |
123.1.1.1.1.23 |
Tukang |
0.0275 |
OH |
177.500,00 |
4.881,25 |
|
|
|
|
Jumlah |
16.668,13 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
0.0977 |
M3 |
1.534.100,00 |
149.881,57 |
117.1.1.1.2.45 |
Mortar |
0.0158 |
M3 |
48.100,00 |
759,98 |
|
|
|
|
Jumlah |
150.641,55 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.29 |
Flat Bed Truck |
0.0481 |
jam |
844.500,00 |
40.620,45 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
42.020,45 |
|
|
|
|
Nilai HSPK |
209.330,13 |
| 2020 | 24.2.5.61 | Kerb Pracetak Jenis 5 (Penghalang Berparit) t=30 cm | M1 | 209.330,13 | Tidak Dipakai | |
165 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.60 |
Kerb Pracetak Jenis 4 (Penghalang Berparit) t=20 cm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0069 |
OH |
206.800,00 |
1.426,92 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0687 |
OH |
150.800,00 |
10.359,96 |
123.1.1.1.1.23 |
Tukang |
0.0275 |
OH |
177.500,00 |
4.881,25 |
|
|
|
|
Jumlah |
16.668,13 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
0.0798 |
M3 |
1.534.100,00 |
122.421,18 |
117.1.1.1.2.45 |
Mortar |
0.0105 |
M3 |
48.100,00 |
505,05 |
|
|
|
|
Jumlah |
122.926,23 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.29 |
Flat Bed Truck |
0.0481 |
jam |
844.500,00 |
40.620,45 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
42.020,45 |
|
|
|
|
Nilai HSPK |
181.614,81 |
| 2020 | 24.2.5.60 | Kerb Pracetak Jenis 4 (Penghalang Berparit) t=20 cm | M1 | 181.614,81 | Tidak Dipakai | |
166 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.59 |
Kerb Pracetak Jenis 3 (Kerb Berparit/Gutter) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0065 |
OH |
206.800,00 |
1.344,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0655 |
OH |
150.800,00 |
9.877,40 |
123.1.1.1.1.23 |
Tukang |
0.0262 |
OH |
177.500,00 |
4.650,50 |
|
|
|
|
Jumlah |
15.872,10 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
0.0664 |
M3 |
1.534.100,00 |
101.864,24 |
117.1.1.1.2.45 |
Mortar |
0.01 |
M3 |
48.100,00 |
481,00 |
|
|
|
|
Jumlah |
102.345,24 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.29 |
Flat Bed Truck |
0.0458 |
jam |
844.500,00 |
38.678,10 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
40.078,10 |
|
|
|
|
Nilai HSPK |
158.295,44 |
| 2020 | 24.2.5.59 | Kerb Pracetak Jenis 3 (Kerb Berparit/Gutter) | M1 | 158.295,44 | Tidak Dipakai | |
167 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.58 |
Kerb Pracetak Jenis 2 (Penghalang/Barrier) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0065 |
OH |
206.800,00 |
1.344,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0655 |
OH |
150.800,00 |
9.877,40 |
123.1.1.1.1.23 |
Tukang |
0.0262 |
OH |
177.500,00 |
4.650,50 |
|
|
|
|
Jumlah |
15.872,10 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
0.006 |
M3 |
1.534.100,00 |
9.204,60 |
117.1.1.1.2.45 |
Mortar |
0.0158 |
M3 |
48.100,00 |
759,98 |
|
|
|
|
Jumlah |
9.964,58 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.29 |
Flat Bed Truck |
0.0458 |
jam |
844.500,00 |
38.678,10 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
40.078,10 |
|
|
|
|
Nilai HSPK |
65.914,78 |
| 2020 | 24.2.5.58 | Kerb Pracetak Jenis 2 (Penghalang/Barrier) | M1 | 65.914,78 | Tidak Dipakai | |
168 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.57 |
Kerb Pracetak Jenis 1 (Peninggi/Mountable) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0063 |
OH |
206.800,00 |
1.302,84 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0629 |
OH |
150.800,00 |
9.485,32 |
123.1.1.1.1.23 |
Tukang |
0.0252 |
OH |
177.500,00 |
4.473,00 |
|
|
|
|
Jumlah |
15.261,16 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
0.0551 |
M3 |
1.534.100,00 |
84.528,91 |
117.1.1.1.2.45 |
Mortar |
0.0079 |
M3 |
48.100,00 |
379,99 |
|
|
|
|
Jumlah |
84.908,90 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.29 |
Flat Bed Truck |
0.044 |
jam |
844.500,00 |
37.158,00 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
38.558,00 |
|
|
|
|
Nilai HSPK |
138.728,06 |
| 2020 | 24.2.5.57 | Kerb Pracetak Jenis 1 (Peninggi/Mountable) | M1 | 138.728,06 | Tidak Dipakai | |
169 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.56 |
Mata Kucing |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.25 |
OH |
150.800,00 |
37.700,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
65.790,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.063 |
M3 |
1.374.100,00 |
86.568,30 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.22.217 |
Mata Kucing |
1 |
Kg |
53.400,00 |
53.400,00 |
|
|
|
|
Jumlah |
165.868,30 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
233.058,30 |
| 2020 | 24.2.5.56 | Mata Kucing | buah | 233.058,30 | Tidak Dipakai | |
170 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.55 |
Paku Jalan |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.25 |
OH |
150.800,00 |
37.700,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
65.790,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.063 |
M3 |
1.374.100,00 |
86.568,30 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.22.243 |
Paku Jalan |
1 |
buah |
25.700,00 |
25.700,00 |
|
|
|
|
Jumlah |
138.168,30 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
205.358,30 |
| 2020 | 24.2.5.55 | Paku Jalan | buah | 205.358,30 | Tidak Dipakai | |
171 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.54 |
Rel Pengaman |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0298 |
OH |
206.800,00 |
6.162,64 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2387 |
OH |
150.800,00 |
35.995,96 |
123.1.1.1.1.23 |
Tukang |
0.0597 |
OH |
177.500,00 |
10.596,75 |
|
|
|
|
Jumlah |
52.755,35 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.10.1 |
Patok Beton K-175 |
0.0929 |
buah |
773.800,00 |
71.886,02 |
117.1.1.1.14.32 |
Besi Beton Polos |
4.645 |
Kg |
16.900,00 |
78.500,50 |
|
|
|
|
Jumlah |
150.386,52 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.2089 |
jam |
513.600,00 |
107.291,04 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
108.691,04 |
|
|
|
|
Nilai HSPK |
311.832,91 |
| 2020 | 24.2.5.54 | Rel Pengaman | M1 | 311.832,91 | Tidak Dipakai | |
172 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.53 |
Patok Hektometer |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.016 |
OH |
206.800,00 |
3.308,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0798 |
OH |
150.800,00 |
12.033,84 |
123.1.1.1.1.23 |
Tukang |
0.0319 |
OH |
177.500,00 |
5.662,25 |
|
|
|
|
Jumlah |
21.004,89 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.063 |
M3 |
1.374.100,00 |
86.568,30 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
7.875 |
Kg |
16.900,00 |
133.087,50 |
|
|
|
|
Jumlah |
245.555,80 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.1117 |
jam |
513.600,00 |
57.369,12 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
58.769,12 |
|
|
|
|
Nilai HSPK |
325.329,81 |
| 2020 | 24.2.5.53 | Patok Hektometer | buah | 325.329,81 | Tidak Dipakai | |
173 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.52 |
Patok Kilometer |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.016 |
OH |
206.800,00 |
3.308,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0798 |
OH |
150.800,00 |
12.033,84 |
123.1.1.1.1.23 |
Tukang |
0.0319 |
OH |
177.500,00 |
5.662,25 |
|
|
|
|
Jumlah |
21.004,89 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.1512 |
M3 |
1.374.100,00 |
207.763,92 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
18.9 |
Kg |
16.900,00 |
319.409,99 |
|
|
|
|
Jumlah |
553.073,91 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.1117 |
jam |
513.600,00 |
57.369,12 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
58.769,12 |
|
|
|
|
Nilai HSPK |
632.847,92 |
| 2020 | 24.2.5.52 | Patok Kilometer | buah | 632.847,92 | Tidak Dipakai | |
174 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.51 |
Patok Pengarah |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0141 |
OH |
206.800,00 |
2.915,88 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1125 |
OH |
150.800,00 |
16.965,00 |
123.1.1.1.1.23 |
Tukang |
0.0562 |
OH |
177.500,00 |
9.975,50 |
|
|
|
|
Jumlah |
29.856,38 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.0354 |
M3 |
1.374.100,00 |
48.643,14 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
4.6463 |
Kg |
16.900,00 |
78.522,47 |
|
|
|
|
Jumlah |
153.065,61 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.0984 |
jam |
513.600,00 |
50.538,24 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
51.938,24 |
|
|
|
|
Nilai HSPK |
234.860,22 |
| 2020 | 24.2.5.51 | Patok Pengarah | buah | 234.860,22 | Tidak Dipakai | |
175 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.50 |
Rambu Jalan Ganda dengan Permukaan Pemantul High Intensity Grade |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0231 |
OH |
206.800,00 |
4.777,08 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1155 |
OH |
150.800,00 |
17.417,40 |
123.1.1.1.1.23 |
Tukang |
0.0693 |
OH |
177.500,00 |
12.300,75 |
|
|
|
|
Jumlah |
34.495,23 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.016 |
M3 |
1.374.100,00 |
21.985,60 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.22.265 |
Pelat Rambu |
2 |
buah |
400.200,00 |
800.400,00 |
117.2.2.1.2.9 |
Pipa Galvanis Dia. 1,6" |
1 |
batang |
243.400,00 |
243.400,00 |
|
|
|
|
Jumlah |
1.091.685,60 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.1617 |
jam |
513.600,00 |
83.049,12 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
84.449,12 |
|
|
|
|
Nilai HSPK |
1.210.629,95 |
| 2020 | 24.2.5.50 | Rambu Jalan Ganda dengan Permukaan Pemantul High Intensity Grade | buah | 1.210.629,95 | Tidak Dipakai | |
176 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.49 |
Rambu Jalan Tunggal dengan Permukaan Pemantul High Intensity Grade |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0231 |
OH |
206.800,00 |
4.777,08 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1155 |
OH |
150.800,00 |
17.417,40 |
123.1.1.1.1.23 |
Tukang |
0.0693 |
OH |
177.500,00 |
12.300,75 |
|
|
|
|
Jumlah |
34.495,23 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.016 |
M3 |
1.374.100,00 |
21.985,60 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.22.265 |
Pelat Rambu |
1 |
buah |
400.200,00 |
400.200,00 |
117.2.2.1.2.9 |
Pipa Galvanis Dia. 1,6" |
1 |
batang |
243.400,00 |
243.400,00 |
|
|
|
|
Jumlah |
691.485,60 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.1617 |
jam |
513.600,00 |
83.049,12 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
84.449,12 |
|
|
|
|
Nilai HSPK |
810.429,95 |
| 2020 | 24.2.5.49 | Rambu Jalan Tunggal dengan Permukaan Pemantul High Intensity Grade | buah | 810.429,95 | Tidak Dipakai | |
177 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.48 |
Rambu Jalan Ganda dengan Permukaan Pemantul Engineering Grade |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0231 |
OH |
206.800,00 |
4.777,08 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1386 |
OH |
150.800,00 |
20.900,88 |
123.1.1.1.1.23 |
Tukang |
0.0693 |
OH |
177.500,00 |
12.300,75 |
|
|
|
|
Jumlah |
37.978,71 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.016 |
M3 |
1.374.100,00 |
21.985,60 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.22.265 |
Pelat Rambu |
2 |
buah |
400.200,00 |
800.400,00 |
117.2.2.1.2.9 |
Pipa Galvanis Dia. 1,6" |
1 |
batang |
243.400,00 |
243.400,00 |
|
|
|
|
Jumlah |
1.091.685,60 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.1617 |
jam |
513.600,00 |
83.049,12 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
84.449,12 |
|
|
|
|
Nilai HSPK |
1.214.113,43 |
| 2020 | 24.2.5.48 | Rambu Jalan Ganda dengan Permukaan Pemantul Engineering Grade | buah | 1.214.113,43 | Tidak Dipakai | |
178 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.47 |
Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0231 |
OH |
206.800,00 |
4.777,08 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1155 |
OH |
150.800,00 |
17.417,40 |
123.1.1.1.1.23 |
Tukang |
0.0693 |
OH |
177.500,00 |
12.300,75 |
|
|
|
|
Jumlah |
34.495,23 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.016 |
M3 |
1.374.100,00 |
21.985,60 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.22.265 |
Pelat Rambu |
1 |
buah |
400.200,00 |
400.200,00 |
117.2.2.1.2.9 |
Pipa Galvanis Dia. 1,6" |
1 |
batang |
243.400,00 |
243.400,00 |
|
|
|
|
Jumlah |
691.485,60 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.1617 |
jam |
513.600,00 |
83.049,12 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
84.449,12 |
|
|
|
|
Nilai HSPK |
810.429,95 |
| 2020 | 24.2.5.47 | Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade | buah | 810.429,95 | Tidak Dipakai | |
179 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.46 |
Marka Jalan Bukan Termoplastic |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0107 |
OH |
206.800,00 |
2.212,76 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0857 |
OH |
150.800,00 |
12.923,56 |
123.1.1.1.1.23 |
Tukang |
0.0322 |
OH |
177.500,00 |
5.715,50 |
|
|
|
|
Jumlah |
20.851,82 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.83 |
Thinner |
1.05 |
liter |
18.600,00 |
19.530,00 |
132.5.2.5.1.2 |
Glass Bead |
0.45 |
Kg |
3.300,00 |
1.485,00 |
132.18.1.3.1.17 |
Cat Marka |
1.95 |
Kg |
25.900,00 |
50.505,00 |
|
|
|
|
Jumlah |
71.520,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.12 |
Compressor |
0.075 |
jam |
332.200,00 |
24.915,00 |
123.2.2.1.2.24 |
Dump Truck |
0.075 |
jam |
513.600,00 |
38.520,00 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
64.835,00 |
|
|
|
|
Nilai HSPK |
157.206,82 |
| 2020 | 24.2.5.46 | Marka Jalan Bukan Termoplastic | M2 | 157.206,82 | Tidak Dipakai | |
180 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.45 |
Marka Jalan Termoplastik |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0107 |
OH |
206.800,00 |
2.212,76 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0857 |
OH |
150.800,00 |
12.923,56 |
123.1.1.1.1.23 |
Tukang |
0.0322 |
OH |
177.500,00 |
5.715,50 |
|
|
|
|
Jumlah |
20.851,82 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.83 |
Thinner |
1.05 |
liter |
18.600,00 |
19.530,00 |
132.5.2.5.1.2 |
Glass Bead |
0.45 |
Kg |
3.300,00 |
1.485,00 |
132.18.1.3.1.18 |
Cat Marka Thermoplastic |
1.95 |
Kg |
28.600,00 |
55.770,00 |
|
|
|
|
Jumlah |
76.785,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.12 |
Compressor |
0.075 |
jam |
332.200,00 |
24.915,00 |
123.2.2.1.2.24 |
Dump Truck |
0.075 |
jam |
513.600,00 |
38.520,00 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
64.835,00 |
|
|
|
|
Nilai HSPK |
162.471,82 |
| 2020 | 24.2.5.45 | Marka Jalan Termoplastik | M2 | 162.471,82 | Tidak Dipakai | |