161 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.81 |
Menanam Pohon Bougenville (1,5-2m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.105 |
Bougenville (1,5 - 2 m) |
1 |
Polibeg |
667.000,00 |
667.000,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
713.700,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
779.556,00 |
| 2020 | 24.2.6.81 | Menanam Pohon Bougenville (1,5-2m) | Pohon | 779.556,00 | Tidak Dipakai | |
162 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.80 |
Pemasangan Kusen Metal Pintu Tipe 2 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.021 |
OH |
236.200,00 |
4.960,20 |
123.1.1.1.1.6 |
Mandor |
0.0035 |
OH |
206.800,00 |
723,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.84 |
OH |
150.800,00 |
126.672,00 |
123.1.1.1.1.23 |
Tukang |
0.42 |
OH |
177.500,00 |
74.550,00 |
|
|
|
|
Jumlah |
206.905,99 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.379 |
Kusen Metal Pintu Tipe 2 |
1 |
unit |
843.100,00 |
843.100,00 |
|
|
|
|
Jumlah |
843.100,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.050.005,99 |
| 2020 | 24.1.10.80 | Pemasangan Kusen Metal Pintu Tipe 2 | unit | 1.050.005,99 | Tidak Dipakai | |
163 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.80 |
Beton Mutu Rendah Fc 10 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.80 | Beton Mutu Rendah Fc 10 Mpa | M3 | 0,00 | Tidak Dipakai | |
164 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.80 |
LatasTon Lapis Aus Perata (HRS-WC(L)) (gradasi senjang/semi senjang) |
|
ton |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0027 |
OH |
206.800,00 |
558,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0191 |
OH |
150.800,00 |
2.880,28 |
|
|
|
|
Jumlah |
3.438,64 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.17 |
Aspal |
75.19 |
Kg |
17.900,00 |
1.345.901,04 |
117.1.1.1.2.52 |
Semen |
23.1 |
Kg |
1.900,00 |
43.890,00 |
117.1.1.1.5.57 |
Lolos screen 2 ukuran (0-5) |
0.1538 |
M3 |
277.500,00 |
42.679,50 |
|
|
|
|
Jumlah |
1.432.470,54 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.1 |
AMP |
0.0201 |
jam |
9.100.600,00 |
182.922,05 |
123.2.2.1.2.24 |
Dump Truck |
0.1205 |
jam |
513.600,00 |
61.888,80 |
123.2.2.1.2.30 |
Genset |
0.0201 |
jam |
825.800,00 |
16.598,58 |
123.2.2.1.2.64 |
Wheel Loader |
0.0096 |
jam |
844.500,00 |
8.107,20 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
270.916,63 |
|
|
|
|
Nilai HSPK |
1.706.825,82 |
| 2020 | 24.2.3.80 | LatasTon Lapis Aus Perata (HRS-WC(L)) (gradasi senjang/semi senjang) | ton | 1.706.825,82 | Tidak Dipakai | |
165 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.80 |
Menanam Pohon Bonsai Serut (1,5 - 2 m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.104 |
Bonsai Serut (1,5 - 2 m) |
1 |
Pohon |
2.001.000,00 |
2.001.000,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
2.047.700,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
2.113.556,00 |
| 2020 | 24.2.6.80 | Menanam Pohon Bonsai Serut (1,5 - 2 m) | Pohon | 2.113.556,00 | Tidak Dipakai | |
166 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.79 |
LatasTon Lapis Aus (HRS-WC) (gradasi senjang/semi senjang) |
|
ton |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0027 |
OH |
206.800,00 |
558,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0191 |
OH |
150.800,00 |
2.880,28 |
|
|
|
|
Jumlah |
3.438,64 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.17 |
Aspal |
75.19 |
Kg |
17.900,00 |
1.345.901,04 |
117.1.1.1.2.52 |
Semen |
23.1 |
Kg |
1.900,00 |
43.890,00 |
117.1.1.1.5.57 |
Lolos screen 2 ukuran (0-5) |
0.1538 |
M3 |
277.500,00 |
42.679,50 |
|
|
|
|
Jumlah |
1.432.470,54 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.1 |
AMP |
0.0201 |
jam |
9.100.600,00 |
182.922,05 |
123.2.2.1.2.3 |
Asphalt Finisher |
0.0191 |
jam |
1.315.400,00 |
25.124,14 |
123.2.2.1.2.24 |
Dump Truck |
0.1205 |
jam |
513.600,00 |
61.888,80 |
123.2.2.1.2.30 |
Genset |
0.0201 |
jam |
825.800,00 |
16.598,58 |
123.2.2.1.2.44 |
Pneumatic Tyre Roller |
0.0043 |
jam |
653.700,00 |
2.810,91 |
123.2.2.1.2.49 |
Tandem Roller |
0.0156 |
jam |
699.100,00 |
10.905,96 |
123.2.2.1.2.64 |
Wheel Loader |
0.0096 |
jam |
844.500,00 |
8.107,20 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
309.757,64 |
|
|
|
|
Nilai HSPK |
1.745.666,83 |
| 2020 | 24.2.3.79 | LatasTon Lapis Aus (HRS-WC) (gradasi senjang/semi senjang) | ton | 1.745.666,83 | Tidak Dipakai | |
167 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.79 |
Beton Siklop Fc 15Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.79 | Beton Siklop Fc 15Mpa | M3 | 0,00 | Tidak Dipakai | |
168 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.79 |
Pemasangan Kusen Metal Pintu Tipe 1 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0312 |
OH |
236.200,00 |
7.369,44 |
123.1.1.1.1.6 |
Mandor |
0.0052 |
OH |
206.800,00 |
1.075,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.248 |
OH |
150.800,00 |
188.198,40 |
123.1.1.1.1.23 |
Tukang |
0.624 |
OH |
177.500,00 |
110.760,00 |
|
|
|
|
Jumlah |
307.403,21 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.378 |
Kusen Metal Pintu Tipe 1 |
1 |
unit |
1.256.700,00 |
1.256.700,00 |
|
|
|
|
Jumlah |
1.256.700,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.564.103,21 |
| 2020 | 24.1.10.79 | Pemasangan Kusen Metal Pintu Tipe 1 | unit | 1.564.103,21 | Tidak Dipakai | |
169 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.79 |
Menanam Pohon Bonsai Keranji ( tinggi = 1,5 meter) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.103 |
Bonsai Keranji ( tinggi = 1,5 meter) |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
152.656,00 |
| 2020 | 24.2.6.79 | Menanam Pohon Bonsai Keranji ( tinggi = 1,5 meter) | Pohon | 152.656,00 | Tidak Dipakai | |
170 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.78 |
Beton Mutu Rendah Fc 15 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.78 | Beton Mutu Rendah Fc 15 Mpa | M3 | 0,00 | Tidak Dipakai | |
171 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.78 |
Pekerjaan Ring Balok (10x15) cm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.015 |
OH |
206.800,00 |
3.102,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.297 |
OH |
150.800,00 |
44.787,60 |
123.1.1.1.1.24 |
Tukang Batu |
0.033 |
OH |
177.500,00 |
5.857,50 |
123.1.1.1.1.25 |
Tukang Besi |
0.033 |
OH |
177.500,00 |
5.857,50 |
123.1.1.1.1.28 |
Tukang Kayu |
0.033 |
OH |
177.500,00 |
5.857,50 |
|
|
|
|
Jumlah |
67.824,10 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
5.5 |
Kg |
2.600,00 |
14.300,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.009 |
M3 |
180.100,00 |
1.620,90 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.015 |
M3 |
280.200,00 |
4.203,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.003 |
M3 |
6.403.200,00 |
19.209,60 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.02 |
Kg |
34.700,00 |
694,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.05 |
Kg |
34.882,00 |
1.744,10 |
|
|
|
|
Jumlah |
41.771,60 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
109.595,70 |
| 2020 | 24.1.4.78 | Pekerjaan Ring Balok (10x15) cm | M1 | 109.595,70 | Tidak Dipakai | |
172 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.78 |
Latasir Kelas B (SS-B) |
|
ton |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0029 |
OH |
206.800,00 |
599,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0201 |
OH |
150.800,00 |
3.031,08 |
|
|
|
|
Jumlah |
3.630,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.17 |
Aspal |
92.7 |
buah |
17.900,00 |
1.659.329,95 |
117.1.1.1.2.52 |
Semen |
31.5 |
Kg |
1.900,00 |
59.850,00 |
117.1.1.1.4.3 |
Pasir Kasar |
0.0139 |
M3 |
247.100,00 |
3.434,69 |
|
|
|
|
Jumlah |
1.722.614,64 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.1 |
AMP |
0.0201 |
jam |
9.100.600,00 |
182.922,05 |
123.2.2.1.2.3 |
Asphalt Finisher |
0.029 |
jam |
1.315.400,00 |
38.146,60 |
123.2.2.1.2.24 |
Dump Truck |
0.0053 |
jam |
513.600,00 |
2.722,08 |
123.2.2.1.2.30 |
Genset |
0.0201 |
jam |
825.800,00 |
16.598,58 |
123.2.2.1.2.44 |
Pneumatic Tyre Roller |
0.0082 |
jam |
653.700,00 |
5.360,34 |
123.2.2.1.2.49 |
Tandem Roller |
0.0238 |
jam |
699.100,00 |
16.638,58 |
123.2.2.1.2.64 |
Wheel Loader |
0.0096 |
jam |
844.500,00 |
8.107,20 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
271.895,43 |
|
|
|
|
Nilai HSPK |
1.998.140,87 |
| 2020 | 24.2.3.78 | Latasir Kelas B (SS-B) | ton | 1.998.140,87 | Tidak Dipakai | |
173 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.78 |
Menanam Pohon Bonsai Anting Putri |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.102 |
Bonsai Anting Putri |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
152.656,00 |
| 2020 | 24.2.6.78 | Menanam Pohon Bonsai Anting Putri | Pohon | 152.656,00 | Tidak Dipakai | |
174 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.78 |
Pemasangan Kusen Metal Jendela Tipe 8 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.009 |
OH |
236.200,00 |
2.125,80 |
123.1.1.1.1.6 |
Mandor |
0.0015 |
OH |
206.800,00 |
310,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.36 |
OH |
150.800,00 |
54.288,00 |
123.1.1.1.1.23 |
Tukang |
0.18 |
OH |
177.500,00 |
31.950,00 |
|
|
|
|
Jumlah |
88.674,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.377 |
Kusen metal Jendela Tipe 8 |
1 |
unit |
356.900,00 |
356.900,00 |
|
|
|
|
Jumlah |
356.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
445.574,00 |
| 2020 | 24.1.10.78 | Pemasangan Kusen Metal Jendela Tipe 8 | unit | 445.574,00 | Tidak Dipakai | |
175 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.77 |
Pekerjaan Kolom Praktis (11 x 11 cm) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.006 |
OH |
236.200,00 |
1.417,20 |
123.1.1.1.1.6 |
Mandor |
0.009 |
OH |
206.800,00 |
1.861,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.18 |
OH |
150.800,00 |
27.144,00 |
123.1.1.1.1.24 |
Tukang Batu |
0.02 |
OH |
177.500,00 |
3.550,00 |
123.1.1.1.1.25 |
Tukang Besi |
0.02 |
OH |
177.500,00 |
3.550,00 |
123.1.1.1.1.28 |
Tukang Kayu |
0.02 |
OH |
177.500,00 |
3.550,00 |
|
|
|
|
Jumlah |
41.072,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
4 |
Kg |
2.600,00 |
10.400,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.006 |
M3 |
180.100,00 |
1.080,60 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.009 |
M3 |
280.200,00 |
2.521,80 |
117.1.1.1.14.32 |
Besi Beton Polos |
3 |
Kg |
16.900,00 |
50.700,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.002 |
M3 |
6.403.200,00 |
12.806,40 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.01 |
Kg |
34.700,00 |
347,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.45 |
Kg |
34.882,00 |
15.696,90 |
|
|
|
|
Jumlah |
93.552,70 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
134.625,10 |
| 2020 | 24.1.4.77 | Pekerjaan Kolom Praktis (11 x 11 cm) | M1 | 134.625,10 | Tidak Dipakai | |
176 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.77 |
Beton Mutu Sedang Fc 20 Mpa (Untuk Box Culvert) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.77 | Beton Mutu Sedang Fc 20 Mpa (Untuk Box Culvert) | M2 | 0,00 | Tidak Dipakai | |
177 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.77 |
Menanam Pohon Beringin (2-3m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.99 |
Beringin (2-3m) |
1 |
Pohon |
667.000,00 |
667.000,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
713.700,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
779.556,00 |
| 2020 | 24.2.6.77 | Menanam Pohon Beringin (2-3m) | Pohon | 779.556,00 | Tidak Dipakai | |
178 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.77 |
Pemasangan Kusen Metal Jendela Tipe 7 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0132 |
OH |
236.200,00 |
3.117,84 |
123.1.1.1.1.6 |
Mandor |
0.0022 |
OH |
206.800,00 |
454,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.528 |
OH |
150.800,00 |
79.622,40 |
123.1.1.1.1.23 |
Tukang |
0.264 |
OH |
177.500,00 |
46.860,00 |
|
|
|
|
Jumlah |
130.055,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.376 |
Kusen Metal Jendela Tipe 7 |
1 |
unit |
540.300,00 |
540.300,00 |
|
|
|
|
Jumlah |
540.300,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
670.355,20 |
| 2020 | 24.1.10.77 | Pemasangan Kusen Metal Jendela Tipe 7 | unit | 670.355,20 | Tidak Dipakai | |
179 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.3.77 |
Latasir Kelas A (SS-A) |
|
ton |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0029 |
OH |
206.800,00 |
599,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0201 |
OH |
150.800,00 |
3.031,08 |
|
|
|
|
Jumlah |
3.630,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.17 |
Aspal |
103 |
Kg |
17.900,00 |
1.843.700,00 |
117.1.1.1.2.52 |
Semen |
31.5 |
Kg |
1.900,00 |
59.850,00 |
117.1.1.1.4.3 |
Pasir Kasar |
0.2086 |
M3 |
247.100,00 |
51.545,06 |
|
|
|
|
Jumlah |
1.955.095,06 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.1 |
AMP |
0.0201 |
jam |
9.100.600,00 |
182.922,05 |
123.2.2.1.2.3 |
Asphalt Finisher |
0.0386 |
jam |
1.315.400,00 |
50.774,44 |
123.2.2.1.2.24 |
Dump Truck |
0.004 |
jam |
513.600,00 |
2.054,40 |
123.2.2.1.2.30 |
Genset |
0.0201 |
jam |
825.800,00 |
16.598,58 |
123.2.2.1.2.44 |
Pneumatic Tyre Roller |
0.0109 |
jam |
653.700,00 |
7.125,33 |
123.2.2.1.2.49 |
Tandem Roller |
0.0317 |
jam |
699.100,00 |
22.161,47 |
123.2.2.1.2.64 |
Wheel Loader |
0.0096 |
jam |
844.500,00 |
8.107,20 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
291.143,48 |
|
|
|
|
Nilai HSPK |
2.249.869,34 |
| 2020 | 24.2.3.77 | Latasir Kelas A (SS-A) | ton | 2.249.869,34 | Tidak Dipakai | |
180 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.76 |
Beton Mutu Sedang Fc 20 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.76 | Beton Mutu Sedang Fc 20 Mpa | M3 | 0,00 | Tidak Dipakai | |