121 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.3 |
Pemasangan Tegel Keramik 40x40 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.5.1.3 | Pemasangan Tegel Keramik 40x40 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
122 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.3 |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.03 |
OH |
206.800,00 |
6.204,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.6 |
OH |
150.800,00 |
90.480,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
136.908,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
26.55 |
Kg |
2.600,00 |
69.030,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.093 |
M3 |
180.100,00 |
16.749,30 |
117.1.1.1.5.82 |
Batu Bata Besar ( jumbo ) |
140 |
buah |
700,00 |
98.000,00 |
|
|
|
|
Jumlah |
183.779,30 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
320.687,30 |
| 2020 | 24.1.6.3 | Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata | M2 | 320.687,30 | Tidak Dipakai | |
123 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.3 |
Pembuatan dan Pemasangan pintu klamp standar. Kayu kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.105 |
OH |
236.200,00 |
24.801,00 |
123.1.1.1.1.6 |
Mandor |
0.018 |
OH |
206.800,00 |
3.722,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.35 |
OH |
150.800,00 |
52.780,00 |
123.1.1.1.1.23 |
Tukang |
1.05 |
OH |
177.500,00 |
186.374,99 |
|
|
|
|
Jumlah |
267.678,39 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.04 |
M3 |
14.567.300,00 |
582.691,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.05 |
Kg |
34.700,00 |
1.735,00 |
|
|
|
|
Jumlah |
584.426,99 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
852.105,38 |
| 2020 | 24.1.10.3 | Pembuatan dan Pemasangan pintu klamp standar. Kayu kelas II | M2 | 852.105,38 | Tidak Dipakai | |
124 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.4.3 |
Pemasangan Pintu Pagar Besi |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.4.3 | Pemasangan Pintu Pagar Besi | 10 Pcs | 0,00 | Tidak Dipakai | |
125 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.3 |
Pemasangan Plafon Eternit Rangka Kayu Lama |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.6.3.3 | Pemasangan Plafon Eternit Rangka Kayu Lama | 10 Pcs | 0,00 | Tidak Dipakai | |
126 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.3 |
Pemasangan Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.1.3 | Pemasangan Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata | 10 Pcs | 0,00 | Tidak Dipakai | |
127 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.3 |
Pemasangan Paving Stone (Blok) Tbl.8 cm Merah Empat Persegi Panjang |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.3 | Pemasangan Paving Stone (Blok) Tbl.8 cm Merah Empat Persegi Panjang | 10 Pcs | 0,00 | Tidak Dipakai | |
128 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.7.3 |
Pekerjaan pengikisan/pengerokan karat pada permukaan baja cara manual |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
23.240,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.77 |
Soda Api |
0.05 |
Kg |
37.400,00 |
1.870,00 |
|
|
|
|
Jumlah |
1.870,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
25.110,40 |
| 2020 | 24.1.7.3 | Pekerjaan pengikisan/pengerokan karat pada permukaan baja cara manual | M2 | 25.110,40 | Tidak Dipakai | |
129 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.3 |
Pemasangan Plafon Eternit Rangka Kayu Lama |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.3 | Pemasangan Plafon Eternit Rangka Kayu Lama | 10 Pcs | 0,00 | Tidak Dipakai | |
130 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.3 |
Pemasangan Lantai Keramik ukurana 20x25 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.035 |
OH |
206.800,00 |
7.238,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7 |
OH |
150.800,00 |
105.560,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
183.190,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
10.4 |
Kg |
2.600,00 |
27.040,00 |
117.1.1.1.2.58 |
Semen Warna |
1.62 |
Zak |
114.800,00 |
185.976,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.045 |
M3 |
180.100,00 |
8.104,50 |
117.1.1.12.1.70 |
Keramik 20 x 25 cm |
20 |
buah |
4.700,00 |
94.000,00 |
|
|
|
|
Jumlah |
315.120,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
498.310,50 |
| 2020 | 24.1.8.3 | Pemasangan Lantai Keramik ukurana 20x25 cm | M2 | 498.310,50 | Tidak Dipakai | |
131 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.3 |
Pemasangan Kabel Bawah Tanah |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.3.3 | Pemasangan Kabel Bawah Tanah | lembar | 0,00 | Tidak Dipakai | |
132 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.3 |
Biaya Gilas dengan Pneumatic Tire Roller |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.3 | Biaya Gilas dengan Pneumatic Tire Roller | Pohon | 0,00 | Tidak Dipakai | |
133 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.2.3 |
Pelapisan Waterproofing |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.2.3 | Pelapisan Waterproofing | 10 Pcs | 0,00 | Tidak Dipakai | |
134 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.2.3 |
Pelapisan Waterproofing |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.4.2.3 | Pelapisan Waterproofing | 10 Pcs | 0,00 | Tidak Dipakai | |
135 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.4.3 |
Pemasangan Pintu Pagar Besi |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.7.4.3 | Pemasangan Pintu Pagar Besi | 10 Pcs | 0,00 | Tidak Dipakai | |
136 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.2.3 |
Pemasangan Saklar Tunggal |
|
cup |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.2.3 | Pemasangan Saklar Tunggal | cup | 0,00 | Tidak Dipakai | |
137 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.11.3 |
Pemasangan Saklar Tunggal |
|
titik |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2020 | 24.1.11.3 | Pemasangan Saklar Tunggal | titik | 0,00 | Tidak Dipakai | |
138 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.3 |
Pemasangan Turap Bambu tinggi 2,75 m |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.2.1.3 | Pemasangan Turap Bambu tinggi 2,75 m | lembar | 0,00 | Tidak Dipakai | |
139 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.3 |
Pekerjaan Beton K-150 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.3 | Pekerjaan Beton K-150 | 500 Biji | 0,00 | Tidak Dipakai | |
140 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.7.1.3 |
Kusen Pintu/Jendela Kayu Meranti |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.7.1.3 | Kusen Pintu/Jendela Kayu Meranti | 500 Biji | 0,00 | Tidak Dipakai | |