24.3.1.29 |
Pekerjaan Dinding Beton Bertulang (200 kg besi + Bekisting) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.1.29 | Pekerjaan Dinding Beton Bertulang (200 kg besi + Bekisting) | 500 Biji | 0,00 | Tidak Dipakai | |
82 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.30 |
Pekerjaan Kolom Praktis (11 x 11 cm) |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.1.30 | Pekerjaan Kolom Praktis (11 x 11 cm) | lembar | 0,00 | Tidak Dipakai | |
83 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.31 |
Pekerjaan Ring Balk (10x15) cm |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.1.31 | Pekerjaan Ring Balk (10x15) cm | lembar | 0,00 | Tidak Dipakai | |
84 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.32 |
Pembongkaran Beton |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.1.32 | Pembongkaran Beton | 500 Biji | 0,00 | Tidak Dipakai | |
85 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.33 |
Cor Beton Mutu K 175 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.4.3.1 |
Pasir Pasang |
0.5429 |
M3 |
225.100,00 |
122.206,80 |
20.1.1.5.7.40 |
Kerikil Beton Guli (2-3cm) |
0.7622 |
M3 |
366.850,00 |
279.613,07 |
20.1.1.9.1.453 |
Semen Portland PC @ 50 Kg |
6.52 |
Zak |
130.800,00 |
852.816,00 |
23.2.4.1.1.1 |
Mandor |
0.083 |
Orang Hari |
196.000,00 |
16.268,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.028 |
Orang Hari |
224.000,00 |
6.272,00 |
23.2.4.1.3.1 |
Tukang |
0.275 |
Orang Hari |
168.000,00 |
46.200,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
1.65 |
Orang Hari |
110.000,00 |
181.500,00 |
|
|
|
|
Jumlah |
1.504.875,86 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.504.875,86 |
| 2018 | 24.3.1.33 | Cor Beton Mutu K 175 | M3 | 1.504.875,86 | Tidak Dipakai | |
86 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.1 |
Pekerjaan Pemasangan Besi Profil |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.2.1 | Pekerjaan Pemasangan Besi Profil | ikat | 0,00 | Tidak Dipakai | |
87 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.2 |
Pekerjaan Pengelasan dengan las listrik |
|
set m |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.2.2 | Pekerjaan Pengelasan dengan las listrik | set m | 0,00 | Tidak Dipakai | |
88 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.3 |
Pekerjaan Perakitan Besi |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.2.3 | Pekerjaan Perakitan Besi | ikat | 0,00 | Tidak Dipakai | |
89 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.4 |
Perbaikan Sambungan (Baut, Cincin, Pasak, dll) |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.2.4 | Perbaikan Sambungan (Baut, Cincin, Pasak, dll) | ikat | 0,00 | Tidak Dipakai | |
90 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.5 |
Perbaikan dan Penggantian Baja Struktural (profil) |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.2.5 | Perbaikan dan Penggantian Baja Struktural (profil) | ikat | 0,00 | Tidak Dipakai | |
91 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.6 |
Ongkos Pasang Gelagar Profil |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.2.6 | Ongkos Pasang Gelagar Profil | ikat | 0,00 | Tidak Dipakai | |
92 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.7 |
Pekerjaan Pemasangan Baut Mur Baja |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.2.7 | Pekerjaan Pemasangan Baut Mur Baja | ikat | 0,00 | Tidak Dipakai | |
93 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.8 |
Pekerjaan Fabrikasi dan Elektroda Besi Siku |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.3.2.8 | Pekerjaan Fabrikasi dan Elektroda Besi Siku | ikat | 0,00 | Tidak Dipakai | |
94 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.1 |
Pemasangan Dinding Batu Merah 1 Pc : 2 Pp tebal 1 bata |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.1.1 | Pemasangan Dinding Batu Merah 1 Pc : 2 Pp tebal 1 bata | 10 Pcs | 0,00 | Tidak Dipakai | |
95 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.2 |
Pemasangan Dinding Batu Merah 1 Pc : 3 Pp tebal 1 bata |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.1.2 | Pemasangan Dinding Batu Merah 1 Pc : 3 Pp tebal 1 bata | 10 Pcs | 0,00 | Tidak Dipakai | |
96 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.3 |
Pemasangan Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.1.3 | Pemasangan Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata | 10 Pcs | 0,00 | Tidak Dipakai | |
97 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.4 |
Pemasangan Dinding Batu Merah 1 Pc : 5 Pp tebal 1 bata |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.1.4 | Pemasangan Dinding Batu Merah 1 Pc : 5 Pp tebal 1 bata | 10 Pcs | 0,00 | Tidak Dipakai | |
98 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.5 |
Pemasangan Dinding Batu Merah 1 Pc : 10 Pp : 3 Kp tebal 1 bata |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.1.5 | Pemasangan Dinding Batu Merah 1 Pc : 10 Pp : 3 Kp tebal 1 bata | 10 Pcs | 0,00 | Tidak Dipakai | |
99 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.6 |
Pemasangan Dinding Batu Merah 1 Pc : 2 Pp tebal 1/2 bata |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.1.6 | Pemasangan Dinding Batu Merah 1 Pc : 2 Pp tebal 1/2 bata | 10 Pcs | 0,00 | Tidak Dipakai | |
100 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.7 |
Pemasangan Dinding Batu Merah 1 Pc : 3 Pp tebal 1/2 bata |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.1.7 | Pemasangan Dinding Batu Merah 1 Pc : 3 Pp tebal 1/2 bata | 10 Pcs | 0,00 | Tidak Dipakai | |