61 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.49 |
Pondasi Strous PJU |
|
titik |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.03 |
OH |
236.200,00 |
7.086,00 |
123.1.1.1.1.6 |
Mandor |
0.065 |
OH |
206.800,00 |
13.442,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.25 |
OH |
150.800,00 |
37.700,00 |
123.1.1.1.1.23 |
Tukang |
1.155 |
OH |
177.500,00 |
205.012,49 |
|
|
|
|
Jumlah |
263.240,49 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.4 |
Pasir Pasang |
0.024 |
M3 |
180.100,00 |
4.322,40 |
117.1.1.1.4.7 |
Penggalian Tanah Keras |
0.2077 |
M3 |
116.100,00 |
24.113,97 |
117.1.1.1.14.32 |
Besi Beton Polos |
25.018 |
Kg |
16.900,00 |
422.804,19 |
117.1.1.1.16.14 |
Plat Strip uk 3x 40 mm |
1.6 |
M |
55.800,00 |
89.280,00 |
117.1.1.1.22.88 |
Papan/Kaso Kayu Kelas IV |
0.0176 |
M3 |
3.348.400,00 |
58.931,84 |
117.1.1.1.22.123 |
Besi Angkur |
4 |
Kg |
53.400,00 |
213.600,00 |
117.1.1.1.22.198 |
Kawat ikat |
0.5 |
Kg |
30.700,00 |
15.350,00 |
117.1.1.1.22.246 |
Paku Reng |
0.125 |
Kg |
21.000,00 |
2.625,00 |
|
|
|
|
Jumlah |
831.027,41 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
0.0152 |
jam |
228.200,00 |
3.468,64 |
123.2.2.1.2.59 |
Vibro Roller |
0 |
jam |
617.700,00 |
0,00 |
123.2.2.1.3.4 |
Alat Bantu Penerangan Jalan Umum (PJU) |
0.2709 |
jam |
9.800,00 |
2.654,82 |
123.2.2.1.3.7 |
Alat Bantu Strous Pile |
1.2 |
jam |
14,20 |
17,04 |
|
|
|
|
Jumlah |
6.140,50 |
|
|
|
|
Nilai HSPK |
1.100.408,40 |
| 2020 | 24.2.2.49 | Pondasi Strous PJU | titik | 1.100.408,40 | Tidak Dipakai | |
62 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.48 |
Pondasi Biasa PJU |
|
cup |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.3.48 | Pondasi Biasa PJU | cup | 0,00 | Tidak Dipakai | |
63 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.48 |
Pondasi Biasa PJU |
|
cup |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.48 | Pondasi Biasa PJU | cup | 0,00 | Tidak Dipakai | |
64 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.48 |
Pondasi Biasa PJU |
|
titik |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.03 |
OH |
236.200,00 |
7.086,00 |
123.1.1.1.1.6 |
Mandor |
0.065 |
OH |
206.800,00 |
13.442,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.25 |
OH |
150.800,00 |
37.700,00 |
123.1.1.1.1.23 |
Tukang |
1.155 |
OH |
177.500,00 |
205.012,49 |
|
|
|
|
Jumlah |
263.240,49 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.18 |
Beton Cor K 225 |
0.24 |
M3 |
1.440.800,00 |
345.791,99 |
117.1.1.1.4.4 |
Pasir Pasang |
0.024 |
M3 |
180.100,00 |
4.322,40 |
117.1.1.1.14.32 |
Besi Beton Polos |
2.3663 |
Kg |
16.900,00 |
39.990,47 |
117.1.1.1.22.88 |
Papan/Kaso Kayu Kelas IV |
0.0144 |
M3 |
3.348.400,00 |
48.216,96 |
117.1.1.1.22.123 |
Besi Angkur |
4 |
Kg |
53.400,00 |
213.600,00 |
117.1.1.1.22.246 |
Paku Reng |
0.125 |
Kg |
21.000,00 |
2.625,00 |
|
|
|
|
Jumlah |
654.546,82 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
0.0076 |
jam |
228.200,00 |
1.734,32 |
123.2.2.1.2.59 |
Vibro Roller |
0.0076 |
jam |
617.700,00 |
4.694,52 |
123.2.2.1.3.4 |
Alat Bantu Penerangan Jalan Umum (PJU) |
0.1767 |
jam |
9.800,00 |
1.731,66 |
|
|
|
|
Jumlah |
8.160,50 |
|
|
|
|
Nilai HSPK |
925.947,82 |
| 2020 | 24.2.2.48 | Pondasi Biasa PJU | titik | 925.947,82 | Tidak Dipakai | |
65 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.17 |
Plesteran Halus 1 Pc : 5 Ps tebal 1.5 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.1.17 | Plesteran Halus 1 Pc : 5 Ps tebal 1.5 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
66 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.17 |
Plesteran Halus 1 Pc : 5 Ps tebal 1.5 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.4.1.17 | Plesteran Halus 1 Pc : 5 Ps tebal 1.5 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
67 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.21 |
Plesteran Halus 1 Pc : 4 Ps tebal 2.0 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.022 |
OH |
206.800,00 |
4.549,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
105.093,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
8.32 |
Kg |
2.600,00 |
21.632,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.032 |
M3 |
180.100,00 |
5.763,20 |
|
|
|
|
Jumlah |
27.395,20 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
132.488,80 |
| 2020 | 24.1.6.21 | Plesteran Halus 1 Pc : 4 Ps tebal 2.0 cm | M2 | 132.488,80 | Tidak Dipakai | |
68 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.16 |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.1.16 | Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
69 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.16 |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.4.1.16 | Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
70 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.18 |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.015 |
OH |
206.800,00 |
3.102,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3 |
OH |
150.800,00 |
45.240,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
78.510,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
6.24 |
Kg |
2.600,00 |
16.224,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.026 |
M3 |
180.100,00 |
4.682,60 |
|
|
|
|
Jumlah |
20.906,60 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
99.416,60 |
| 2020 | 24.1.6.18 | Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm | M2 | 99.416,60 | Tidak Dipakai | |
71 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.20 |
Plesteran Halus 1 Pc : 3 Ps tebal 2.0 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.022 |
OH |
206.800,00 |
4.549,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
105.093,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
10.368 |
Kg |
2.600,00 |
26.956,80 |
117.1.1.1.4.4 |
Pasir Pasang |
0.031 |
M3 |
180.100,00 |
5.583,10 |
|
|
|
|
Jumlah |
32.539,90 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
137.633,50 |
| 2020 | 24.1.6.20 | Plesteran Halus 1 Pc : 3 Ps tebal 2.0 cm | M2 | 137.633,50 | Tidak Dipakai | |
72 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.15 |
Plesteran Halus 1 Pc : 3 Ps tebal 1.5 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.1.15 | Plesteran Halus 1 Pc : 3 Ps tebal 1.5 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
73 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.15 |
Plesteran Halus 1 Pc : 3 Ps tebal 1.5 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.4.1.15 | Plesteran Halus 1 Pc : 3 Ps tebal 1.5 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
74 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.17 |
Plesteran Halus 1 Pc : 3 Ps tebal 1.5 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.015 |
OH |
206.800,00 |
3.102,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3 |
OH |
150.800,00 |
45.240,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
78.510,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
7.776 |
Kg |
2.600,00 |
20.217,60 |
117.1.1.1.4.4 |
Pasir Pasang |
0.023 |
M3 |
180.100,00 |
4.142,30 |
|
|
|
|
Jumlah |
24.359,90 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
102.869,90 |
| 2020 | 24.1.6.17 | Plesteran Halus 1 Pc : 3 Ps tebal 1.5 cm | M2 | 102.869,90 | Tidak Dipakai | |
75 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.14 |
Plesteran Halus 1 Pc : 2 Ps tebal 1.5 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.1.14 | Plesteran Halus 1 Pc : 2 Ps tebal 1.5 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
76 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.14 |
Plesteran Halus 1 Pc : 2 Ps tebal 1.5 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.4.1.14 | Plesteran Halus 1 Pc : 2 Ps tebal 1.5 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
77 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.16 |
Plesteran Halus 1 Pc : 2 Ps tebal 1.5 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.015 |
OH |
206.800,00 |
3.102,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3 |
OH |
150.800,00 |
45.240,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
78.510,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
10.224 |
Kg |
2.600,00 |
26.582,40 |
117.1.1.1.4.4 |
Pasir Pasang |
0.02 |
M3 |
180.100,00 |
3.602,00 |
|
|
|
|
Jumlah |
30.184,40 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
108.694,40 |
| 2020 | 24.1.6.16 | Plesteran Halus 1 Pc : 2 Ps tebal 1.5 cm | M2 | 108.694,40 | Tidak Dipakai | |
78 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.19 |
Plesteran Halus 1 Pc : 1 Ps tebal 2.0 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.022 |
OH |
206.800,00 |
4.549,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
105.093,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
13.632 |
Kg |
2.600,00 |
35.443,20 |
117.1.1.1.4.4 |
Pasir Pasang |
0.0272 |
M3 |
180.100,00 |
4.898,72 |
|
|
|
|
Jumlah |
40.341,92 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
145.435,52 |
| 2020 | 24.1.6.19 | Plesteran Halus 1 Pc : 1 Ps tebal 2.0 cm | M2 | 145.435,52 | Tidak Dipakai | |
79 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.13 |
Plesteran Halus 1 Pc : 1 Ps tebal 1.5 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.4.1.13 | Plesteran Halus 1 Pc : 1 Ps tebal 1.5 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
80 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.4.1.13 |
Plesteran Halus 1 Pc : 1 Ps tebal 1.5 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.4.1.13 | Plesteran Halus 1 Pc : 1 Ps tebal 1.5 cm | 10 Pcs | 0,00 | Tidak Dipakai | |