41 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.118 |
Menanam Pohon Palem Kuning (0,5-1m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.252 |
Palem Kuning (0,5-1m) |
1 |
Pohon |
100.100,00 |
100.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
146.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
212.656,00 |
| 2020 | 24.2.6.118 | Menanam Pohon Palem Kuning (0,5-1m) | Pohon | 212.656,00 | Tidak Dipakai | |
42 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.117 |
Menanam Pohon Palem Kenari (2-2,5m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.251 |
Palem Kenari (2-2,5m) |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
152.656,00 |
| 2020 | 24.2.6.117 | Menanam Pohon Palem Kenari (2-2,5m) | Pohon | 152.656,00 | Tidak Dipakai | |
43 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.116 |
Menanam Pohon Palem Kenari (1,5-2m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
46.700,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
112.556,00 |
| 2020 | 24.2.6.116 | Menanam Pohon Palem Kenari (1,5-2m) | Pohon | 112.556,00 | Tidak Dipakai | |
44 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.115 |
Menanam Pohon Palem Eleventaris |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.247 |
Palem Eleventaris |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
152.656,00 |
| 2020 | 24.2.6.115 | Menanam Pohon Palem Eleventaris | Pohon | 152.656,00 | Tidak Dipakai | |
45 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.114 |
Menanam Pohon Palem Ekor Tupai(1-1.5m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.246 |
Palem Ekor Tupai(1-1.5m) |
1 |
Pohon |
266.800,00 |
266.800,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
313.500,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
379.356,00 |
| 2020 | 24.2.6.114 | Menanam Pohon Palem Ekor Tupai(1-1.5m) | Pohon | 379.356,00 | Tidak Dipakai | |
46 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.113 |
Menanam Pohon Palem Ekor Tupai (0,5-1m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.243 |
Palem Ekor Tupai (0,5-1m) |
1 |
Pohon |
233.500,00 |
233.500,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
280.200,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
346.056,00 |
| 2020 | 24.2.6.113 | Menanam Pohon Palem Ekor Tupai (0,5-1m) | Pohon | 346.056,00 | Tidak Dipakai | |
47 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.112 |
Menanam Pohon Palem Botol (0,5-1m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.242 |
Palem Botol (0,5 - 1 m) |
1 |
Pohon |
333.500,00 |
333.500,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
380.200,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
446.056,00 |
| 2020 | 24.2.6.112 | Menanam Pohon Palem Botol (0,5-1m) | Pohon | 446.056,00 | Tidak Dipakai | |
48 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.111 |
Menanam Pohon Palem Bismarq |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.241 |
Palem Bismarq |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
152.656,00 |
| 2020 | 24.2.6.111 | Menanam Pohon Palem Bismarq | Pohon | 152.656,00 | Tidak Dipakai | |
49 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.110 |
Menanam Pohon Ortensia |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
|
|
|
|
Jumlah |
154.936,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.236 |
Ortensia |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
243.136,00 |
| 2020 | 24.2.6.110 | Menanam Pohon Ortensia | Pohon | 243.136,00 | Tidak Dipakai | |
50 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.109 |
Menanam Pohon Nenas Merah |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.231 |
Nenas Merah |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
152.656,00 |
| 2020 | 24.2.6.109 | Menanam Pohon Nenas Merah | Pohon | 152.656,00 | Tidak Dipakai | |
51 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.108 |
Menanam Pohon Nangka |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.230 |
Nangka |
1 |
Pohon |
66.700,00 |
66.700,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
113.400,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
179.256,00 |
| 2020 | 24.2.6.108 | Menanam Pohon Nangka | Pohon | 179.256,00 | Tidak Dipakai | |
52 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.107 |
Menanam Pohon Meranti Merah (0.75-2m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.227 |
Meranti Merah (0.75-2m) |
1 |
Pohon |
667.000,00 |
667.000,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
713.700,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
779.556,00 |
| 2020 | 24.2.6.107 | Menanam Pohon Meranti Merah (0.75-2m) | Pohon | 779.556,00 | Tidak Dipakai | |
53 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.106 |
Menanam Pohon Melinjo |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.226 |
Melinjo |
1 |
Pohon |
66.700,00 |
66.700,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
113.400,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
179.256,00 |
| 2020 | 24.2.6.106 | Menanam Pohon Melinjo | Pohon | 179.256,00 | Tidak Dipakai | |
54 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.105 |
Menanam Pohon Manggis |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.219 |
manggis |
1 |
Pohon |
66.700,00 |
66.700,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
113.400,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
179.256,00 |
| 2020 | 24.2.6.105 | Menanam Pohon Manggis | Pohon | 179.256,00 | Tidak Dipakai | |
55 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.104 |
Menanam Pohon Mangga (1.5-2) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.218 |
Mangga (1.5-2) |
1 |
Pohon |
466.900,00 |
466.900,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
513.600,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
579.456,00 |
| 2020 | 24.2.6.104 | Menanam Pohon Mangga (1.5-2) | Pohon | 579.456,00 | Tidak Dipakai | |
56 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.103 |
Menanam Pohon Lohan |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.214 |
Lohan |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
152.656,00 |
| 2020 | 24.2.6.103 | Menanam Pohon Lohan | Pohon | 152.656,00 | Tidak Dipakai | |
57 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.102 |
Menanam Pohon Kiara Payung (1-1.5m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.197 |
Kiara Payung (1-1.5m) |
1 |
Pohon |
20.100,00 |
20.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
66.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
132.656,00 |
| 2020 | 24.2.6.102 | Menanam Pohon Kiara Payung (1-1.5m) | Pohon | 132.656,00 | Tidak Dipakai | |
58 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.101 |
Menanam Pohon Ketapang kencana |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.196 |
Ketapang kencana |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
152.656,00 |
| 2020 | 24.2.6.101 | Menanam Pohon Ketapang kencana | Pohon | 152.656,00 | Tidak Dipakai | |
59 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.100 |
Menanam Pohon Kedondong Laut (1,5-2m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.186 |
Kedondong Laut (1,5-2m) |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
152.656,00 |
| 2020 | 24.2.6.100 | Menanam Pohon Kedondong Laut (1,5-2m) | Pohon | 152.656,00 | Tidak Dipakai | |
60 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.99 |
Menanam Pohon Kamboja Jepang (1-2meter) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.183 |
Kamboja Jepang (1-2meter) |
1 |
Pohon |
400.200,00 |
400.200,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
446.900,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
512.756,00 |
| 2020 | 24.2.6.99 | Menanam Pohon Kamboja Jepang (1-2meter) | Pohon | 512.756,00 | Tidak Dipakai | |