41 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.113 |
Pemasangan Kusen Aluminium Jendela Tipe 5 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0222 |
OH |
236.200,00 |
5.243,64 |
123.1.1.1.1.6 |
Mandor |
0.0037 |
OH |
206.800,00 |
765,16 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.888 |
OH |
150.800,00 |
133.910,40 |
123.1.1.1.1.23 |
Tukang |
0.444 |
OH |
177.500,00 |
78.810,00 |
|
|
|
|
Jumlah |
218.729,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.336 |
Kusen Aluminium Jendela Tipe 5 |
1 |
unit |
1.048.200,00 |
1.048.200,00 |
|
|
|
|
Jumlah |
1.048.200,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.266.929,20 |
| 2020 | 24.1.10.113 | Pemasangan Kusen Aluminium Jendela Tipe 5 | unit | 1.266.929,20 | Tidak Dipakai | |
42 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.112 |
Menanam Pohon Palem Botol (0,5-1m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.242 |
Palem Botol (0,5 - 1 m) |
1 |
Pohon |
333.500,00 |
333.500,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
380.200,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
446.056,00 |
| 2020 | 24.2.6.112 | Menanam Pohon Palem Botol (0,5-1m) | Pohon | 446.056,00 | Tidak Dipakai | |
43 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.112 |
Pemasangan Kusen Aluminium Jendela Tipe 4 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0162 |
OH |
236.200,00 |
3.826,44 |
123.1.1.1.1.6 |
Mandor |
0.0027 |
OH |
206.800,00 |
558,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.648 |
OH |
150.800,00 |
97.718,40 |
123.1.1.1.1.23 |
Tukang |
0.324 |
OH |
177.500,00 |
57.510,00 |
|
|
|
|
Jumlah |
159.613,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.335 |
Kusen Aluminium Jendela Tipe 4 |
1 |
unit |
751.100,00 |
751.100,00 |
|
|
|
|
Jumlah |
751.100,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
910.713,20 |
| 2020 | 24.1.10.112 | Pemasangan Kusen Aluminium Jendela Tipe 4 | unit | 910.713,20 | Tidak Dipakai | |
44 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.112 |
laston lapis pondasi modifikasi (AC base mod total harga (rp) |
|
ton |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.1.2 |
Filler |
9.87 |
kilogram |
4.002,00 |
39.499,74 |
20.1.1.1.5.11 |
Aspal |
58.71 |
Kg |
13.750,00 |
807.262,49 |
|
|
|
|
Jumlah |
846.762,23 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.1205 |
jam |
69.200,00 |
8.338,60 |
23.2.5.11.5.2 |
Sewa Genset |
0.0201 |
unit |
2.750.000,00 |
55.275,00 |
23.2.5.11.6.2 |
Sewa Ashpalt Finisher |
0.0092 |
jam |
1.112.200,00 |
10.232,24 |
23.2.5.11.6.3 |
Sewa Pneumatic Tire Roller |
0.0052 |
jam |
234.200,00 |
1.217,84 |
23.2.5.11.6.4 |
Sewa Tandem Roller |
0.0091 |
jam |
281.000,00 |
2.557,10 |
23.2.5.11.6.6 |
Sewa Amp 10 T |
0.0201 |
jam |
276.300,00 |
5.553,63 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0096 |
jam |
608.800,00 |
5.844,48 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
110.318,89 |
|
|
|
|
Nilai HSPK |
957.081,12 |
| 2019 | 24.3.1.112 | laston lapis pondasi modifikasi (AC base mod total harga (rp) | ton | 957.081,12 | Tidak Dipakai | |
45 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.111 |
Pemasangan Kusen Aluminium Jendela Tipe 3 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0288 |
OH |
236.200,00 |
6.802,56 |
123.1.1.1.1.6 |
Mandor |
0.0048 |
OH |
206.800,00 |
992,64 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.152 |
OH |
150.800,00 |
173.721,59 |
123.1.1.1.1.23 |
Tukang |
0.576 |
OH |
177.500,00 |
102.240,00 |
|
|
|
|
Jumlah |
283.756,79 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.334 |
Kusen Aluminium Jendela Tipe 3 |
1 |
unit |
1.362.300,00 |
1.362.300,00 |
|
|
|
|
Jumlah |
1.362.300,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.646.056,79 |
| 2020 | 24.1.10.111 | Pemasangan Kusen Aluminium Jendela Tipe 3 | unit | 1.646.056,79 | Tidak Dipakai | |
46 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.111 |
laston lapis pondasi (AC.base) |
|
ton |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.6.2 |
Aspal Panas |
49.44 |
Kg |
13.750,00 |
679.799,98 |
|
|
|
|
Jumlah |
679.799,98 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.1205 |
jam |
69.200,00 |
8.338,60 |
23.2.5.11.5.2 |
Sewa Genset |
0.0201 |
unit |
2.750.000,00 |
55.275,00 |
23.2.5.11.6.2 |
Sewa Ashpalt Finisher |
0.0092 |
jam |
1.112.200,00 |
10.232,24 |
23.2.5.11.6.3 |
Sewa Pneumatic Tire Roller |
0.0052 |
jam |
234.200,00 |
1.217,84 |
23.2.5.11.6.4 |
Sewa Tandem Roller |
0.0091 |
jam |
281.000,00 |
2.557,10 |
23.2.5.11.6.6 |
Sewa Amp 10 T |
0.0201 |
jam |
276.300,00 |
5.553,63 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0096 |
jam |
608.800,00 |
5.844,48 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
110.318,89 |
|
|
|
|
Nilai HSPK |
790.118,87 |
| 2019 | 24.3.1.111 | laston lapis pondasi (AC.base) | ton | 790.118,87 | Tidak Dipakai | |
47 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.111 |
Menanam Pohon Palem Bismarq |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.241 |
Palem Bismarq |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
152.656,00 |
| 2020 | 24.2.6.111 | Menanam Pohon Palem Bismarq | Pohon | 152.656,00 | Tidak Dipakai | |
48 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.110 |
Pemasangan Kusen Aluminium Jendela Tipe 2 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0414 |
OH |
236.200,00 |
9.778,68 |
123.1.1.1.1.6 |
Mandor |
0.0069 |
OH |
206.800,00 |
1.426,92 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.656 |
OH |
150.800,00 |
249.724,80 |
123.1.1.1.1.23 |
Tukang |
0.828 |
OH |
177.500,00 |
146.970,00 |
|
|
|
|
Jumlah |
407.900,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.333 |
Kusen Aluminium Jendela Tipe 2 |
1 |
unit |
1.946.900,00 |
1.946.900,00 |
|
|
|
|
Jumlah |
1.946.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.354.800,40 |
| 2020 | 24.1.10.110 | Pemasangan Kusen Aluminium Jendela Tipe 2 | unit | 2.354.800,40 | Tidak Dipakai | |
49 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.110 |
beton diafragma tepi125x124x20 |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.11.3.1 |
Sewa Crane |
0.7042 |
jam |
146.300,00 |
103.024,46 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
124.324,46 |
|
|
|
|
Nilai HSPK |
124.324,46 |
| 2019 | 24.3.1.110 | beton diafragma tepi125x124x20 | buah | 124.324,46 | Tidak Dipakai | |
50 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.110 |
Menanam Pohon Ortensia |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
|
|
|
|
Jumlah |
154.936,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.236 |
Ortensia |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
243.136,00 |
| 2020 | 24.2.6.110 | Menanam Pohon Ortensia | Pohon | 243.136,00 | Tidak Dipakai | |
51 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.109 |
Pemasangan Kusen Aluminium Jendela Tipe 1 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0558 |
OH |
236.200,00 |
13.179,96 |
123.1.1.1.1.6 |
Mandor |
0.0093 |
OH |
206.800,00 |
1.923,24 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.232 |
OH |
150.800,00 |
336.585,62 |
123.1.1.1.1.23 |
Tukang |
1.116 |
OH |
177.500,00 |
198.090,01 |
|
|
|
|
Jumlah |
549.778,83 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.22 |
Kusen Aluminium Jendela Tipe 1 |
1 |
unit |
2.614.000,00 |
2.614.000,00 |
|
|
|
|
Jumlah |
2.614.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
3.163.778,83 |
| 2020 | 24.1.10.109 | Pemasangan Kusen Aluminium Jendela Tipe 1 | unit | 3.163.778,83 | Tidak Dipakai | |
52 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.109 |
laston lapis antara modifikasi (AC-BC(L)) |
|
ton |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.1.2 |
Filler |
9.345 |
kilogram |
4.002,00 |
37.398,69 |
20.1.1.1.5.11 |
Aspal |
66.289 |
Kg |
13.750,00 |
911.473,77 |
|
|
|
|
Jumlah |
948.872,46 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.1205 |
jam |
69.200,00 |
8.338,60 |
23.2.5.11.5.2 |
Sewa Genset |
0.0201 |
unit |
2.750.000,00 |
55.275,00 |
23.2.5.11.6.2 |
Sewa Ashpalt Finisher |
0.0092 |
jam |
1.112.200,00 |
10.232,24 |
23.2.5.11.6.3 |
Sewa Pneumatic Tire Roller |
0.0039 |
jam |
234.200,00 |
913,38 |
23.2.5.11.6.4 |
Sewa Tandem Roller |
0.0091 |
jam |
281.000,00 |
2.557,10 |
23.2.5.11.6.6 |
Sewa Amp 10 T |
0.0201 |
jam |
276.300,00 |
5.553,63 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0096 |
jam |
608.800,00 |
5.844,48 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
110.014,43 |
|
|
|
|
Nilai HSPK |
1.058.886,89 |
| 2019 | 24.3.1.109 | laston lapis antara modifikasi (AC-BC(L)) | ton | 1.058.886,89 | Tidak Dipakai | |
53 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.109 |
Menanam Pohon Nenas Merah |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.231 |
Nenas Merah |
1 |
Pohon |
40.100,00 |
40.100,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
86.800,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
152.656,00 |
| 2020 | 24.2.6.109 | Menanam Pohon Nenas Merah | Pohon | 152.656,00 | Tidak Dipakai | |
54 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.108 |
laston lapis antaraperata (AC-BC(L)) |
|
ton |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.6.1 |
Aspal Panas |
57.68 |
Kg |
13.500,00 |
778.680,00 |
20.1.1.2.1.2 |
Semen Mortar |
9.45 |
kilogram |
103.251,00 |
975.721,93 |
|
|
|
|
Jumlah |
1.754.401,93 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.1205 |
jam |
69.200,00 |
8.338,60 |
23.2.5.11.5.2 |
Sewa Genset |
0.02 |
unit |
2.750.000,00 |
55.000,00 |
23.2.5.11.6.2 |
Sewa Ashpalt Finisher |
0.0092 |
jam |
1.112.200,00 |
10.232,24 |
23.2.5.11.6.3 |
Sewa Pneumatic Tire Roller |
0.0039 |
jam |
234.200,00 |
913,38 |
23.2.5.11.6.4 |
Sewa Tandem Roller |
0.0091 |
jam |
281.000,00 |
2.557,10 |
23.2.5.11.6.6 |
Sewa Amp 10 T |
0.0201 |
jam |
276.300,00 |
5.553,63 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0096 |
jam |
608.800,00 |
5.844,48 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
109.739,43 |
|
|
|
|
Nilai HSPK |
1.864.141,36 |
| 2019 | 24.3.1.108 | laston lapis antaraperata (AC-BC(L)) | ton | 1.864.141,36 | Tidak Dipakai | |
55 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.108 |
Pemasangan Kusen Aluminium Type V 4 K |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0114 |
OH |
236.200,00 |
2.692,68 |
123.1.1.1.1.6 |
Mandor |
0.0019 |
OH |
206.800,00 |
392,92 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.456 |
OH |
150.800,00 |
68.764,80 |
123.1.1.1.1.23 |
Tukang |
0.228 |
OH |
177.500,00 |
40.470,00 |
|
|
|
|
Jumlah |
112.320,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.369 |
Kusen Aluminium Tipe V 4 K |
1 |
unit |
397.600,00 |
397.600,00 |
|
|
|
|
Jumlah |
397.600,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
509.920,40 |
| 2020 | 24.1.10.108 | Pemasangan Kusen Aluminium Type V 4 K | unit | 509.920,40 | Tidak Dipakai | |
56 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.108 |
Menanam Pohon Nangka |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.230 |
Nangka |
1 |
Pohon |
66.700,00 |
66.700,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
113.400,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
179.256,00 |
| 2020 | 24.2.6.108 | Menanam Pohon Nangka | Pohon | 179.256,00 | Tidak Dipakai | |
57 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.107 |
Pemasangan Kusen Aluminium Type V 4 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0168 |
OH |
236.200,00 |
3.968,16 |
123.1.1.1.1.6 |
Mandor |
0.0028 |
OH |
206.800,00 |
579,04 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.672 |
OH |
150.800,00 |
101.337,60 |
123.1.1.1.1.23 |
Tukang |
0.336 |
OH |
177.500,00 |
59.640,00 |
|
|
|
|
Jumlah |
165.524,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.368 |
Kusen Aluminium Tipe V 4 |
1 |
unit |
591.000,00 |
591.000,00 |
|
|
|
|
Jumlah |
591.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
756.524,80 |
| 2020 | 24.1.10.107 | Pemasangan Kusen Aluminium Type V 4 | unit | 756.524,80 | Tidak Dipakai | |
58 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.107 |
Menanam Pohon Meranti Merah (0.75-2m) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
|
|
|
|
Jumlah |
64.456,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.227 |
Meranti Merah (0.75-2m) |
1 |
Pohon |
667.000,00 |
667.000,00 |
117.1.1.12.1.210 |
Bambu |
1 |
batang |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
713.700,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
779.556,00 |
| 2020 | 24.2.6.107 | Menanam Pohon Meranti Merah (0.75-2m) | Pohon | 779.556,00 | Tidak Dipakai | |
59 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.107 |
pemasangan unit percetakan gelagar tipe u bentang 11 meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.11.3.1 |
Sewa Crane |
0.9009 |
jam |
146.300,00 |
131.801,67 |
23.2.5.11.3.2 |
Sewa Bucket dan Crane / Draglin Scraper |
0.9009 |
jam |
85.200,00 |
76.756,68 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
229.858,35 |
|
|
|
|
Nilai HSPK |
229.858,35 |
| 2019 | 24.3.1.107 | pemasangan unit percetakan gelagar tipe u bentang 11 meter | buah | 229.858,35 | Tidak Dipakai | |
60 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.106 |
pemasangan unit percetakan gelagar tipe u bentang 16 meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.11.3.1 |
Sewa Crane |
0.9009 |
jam |
146.300,00 |
131.801,67 |
23.2.5.11.3.2 |
Sewa Bucket dan Crane / Draglin Scraper |
0.9009 |
jam |
85.200,00 |
76.756,68 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
229.858,35 |
|
|
|
|
Nilai HSPK |
229.858,35 |
| 2019 | 24.3.1.106 | pemasangan unit percetakan gelagar tipe u bentang 16 meter | buah | 229.858,35 | Tidak Dipakai | |