21 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.8 |
Stopper/Uskup tebal 6 cm abu -abu |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.1.8 | Stopper/Uskup tebal 6 cm abu -abu | lembar | 0,00 | Tidak Dipakai | |
22 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.8 |
Stopper/Uskup tebal 6 cm abu -abu |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.8 | Stopper/Uskup tebal 6 cm abu -abu | lembar | 0,00 | Tidak Dipakai | |
23 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.8 |
Stopper/Uskup tebal 6 cm abu - abu |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.001 |
OH |
206.800,00 |
206,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
22.526,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.4 |
Pasir Pasang |
0.001 |
M3 |
180.100,00 |
180,10 |
117.1.1.12.1.102 |
Stopper / Uskup Tb 6 cm abu-abu |
3.34 |
buah |
8.300,00 |
27.722,00 |
|
|
|
|
Jumlah |
27.902,10 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
50.428,90 |
| 2020 | 24.2.1.8 | Stopper/Uskup tebal 6 cm abu - abu | M | 50.428,90 | Tidak Dipakai | |
24 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.64 |
sandaran (railing) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.27.5.1 |
Baut |
0.75 |
pc |
23.500,00 |
17.625,00 |
|
|
|
|
Jumlah |
17.625,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
21.300,00 |
|
|
|
|
Nilai HSPK |
38.925,00 |
| 2019 | 24.3.1.64 | sandaran (railing) | M1 | 38.925,00 | Tidak Dipakai | |
25 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.7 |
Roll Pipa 4" |
|
Pad |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.3.7 | Roll Pipa 4" | Pad | 0,00 | Tidak Dipakai | |
26 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.7 |
Roll Pipa 4" |
|
Pad |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.7 | Roll Pipa 4" | Pad | 0,00 | Tidak Dipakai | |
27 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.7 |
Roll Pipa 4" |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.8 |
OH |
150.800,00 |
120.640,00 |
123.1.1.1.1.23 |
Tukang |
0.4 |
OH |
177.500,00 |
71.000,00 |
|
|
|
|
Jumlah |
191.640,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.6 |
Alat Bantu Roll Pipa |
1 |
jam |
3.700,00 |
3.700,00 |
|
|
|
|
Jumlah |
3.700,00 |
|
|
|
|
Nilai HSPK |
195.340,00 |
| 2020 | 24.2.2.7 | Roll Pipa 4" | unit | 195.340,00 | Tidak Dipakai | |
28 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.6 |
Roll Pipa 3" |
|
Pad |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.3.6 | Roll Pipa 3" | Pad | 0,00 | Tidak Dipakai | |
29 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.6 |
Roll Pipa 3" |
|
Pad |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.6 | Roll Pipa 3" | Pad | 0,00 | Tidak Dipakai | |
30 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.6 |
Roll Pipa 3" |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
119.775,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.6 |
Alat Bantu Roll Pipa |
1 |
jam |
3.700,00 |
3.700,00 |
|
|
|
|
Jumlah |
3.700,00 |
|
|
|
|
Nilai HSPK |
123.475,00 |
| 2020 | 24.2.2.6 | Roll Pipa 3" | unit | 123.475,00 | Tidak Dipakai | |
31 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.5 |
Roll Pipa 2" |
|
Pad |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.3.5 | Roll Pipa 2" | Pad | 0,00 | Tidak Dipakai | |
32 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.5 |
Roll Pipa 2" |
|
Pad |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.5 | Roll Pipa 2" | Pad | 0,00 | Tidak Dipakai | |
33 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.5 |
Roll Pipa 2" |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2667 |
OH |
150.800,00 |
40.218,36 |
123.1.1.1.1.23 |
Tukang |
0.1333 |
OH |
177.500,00 |
23.660,75 |
|
|
|
|
Jumlah |
63.879,11 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.6 |
Alat Bantu Roll Pipa |
1 |
jam |
3.700,00 |
3.700,00 |
|
|
|
|
Jumlah |
3.700,00 |
|
|
|
|
Nilai HSPK |
67.579,11 |
| 2020 | 24.2.2.5 | Roll Pipa 2" | unit | 67.579,11 | Tidak Dipakai | |
34 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.4 |
Roll Pipa 1,5" |
|
Pad |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.3.4 | Roll Pipa 1,5" | Pad | 0,00 | Tidak Dipakai | |
35 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.4 |
Roll Pipa 1,5" |
|
Pad |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.4 | Roll Pipa 1,5" | Pad | 0,00 | Tidak Dipakai | |
36 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.4 |
Roll Pipa 1,5" |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2133 |
OH |
150.800,00 |
32.165,64 |
123.1.1.1.1.23 |
Tukang |
0.1067 |
OH |
177.500,00 |
18.939,25 |
|
|
|
|
Jumlah |
51.104,89 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.6 |
Alat Bantu Roll Pipa |
1 |
jam |
3.700,00 |
3.700,00 |
|
|
|
|
Jumlah |
3.700,00 |
|
|
|
|
Nilai HSPK |
54.804,89 |
| 2020 | 24.2.2.4 | Roll Pipa 1,5" | unit | 54.804,89 | Tidak Dipakai | |
37 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.31 |
Rekondisi Curbing Type B panjang 0.5 m |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.31 | Rekondisi Curbing Type B panjang 0.5 m | lembar | 0,00 | Tidak Dipakai | |
38 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.31 |
Rekondisi Curbing Type B panjang 0.5 m |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.2.31 | Rekondisi Curbing Type B panjang 0.5 m | lembar | 0,00 | Tidak Dipakai | |
39 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.10 |
Rangka Plafon Luar (Overstek) |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.6.3.10 | Rangka Plafon Luar (Overstek) | 10 Pcs | 0,00 | Tidak Dipakai | |
40 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.10 |
Rangka Plafon Luar (Overstek) |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.10 | Rangka Plafon Luar (Overstek) | 10 Pcs | 0,00 | Tidak Dipakai | |