101 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.3.18 |
Konstruksi Taman Paving (Luas 100 m2, Urugan Pasir 10 cm,Kanstin Beton K350) |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 25.1.3.18.1 | Konstruksi Taman Paving (Luas 100 m2, Urugan Pasir 10 cm,Kanstin Beton K350) | M2 | 0,00 | (belum diset) | |
102 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.3.18 |
Konstruksi Taman Paving (Luas 100 m2, Urugan Pasir 10 cm,Kanstin Beton K350) |
|
|
Titik |
|
|
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.1 |
M3 |
471.628,02 |
47.162,80 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
1 |
M2 |
116.890,00 |
116.890,00 |
24.2.1.6 |
- |
Kanstin BDCM 21.5 |
0.4 |
M |
121.117,38 |
48.446,95 |
|
|
|
|
|
Nilai ASB |
212.499,76 |
| 2020 | 25.1.3.18.1 | Konstruksi Taman Paving (Luas 100 m2, Urugan Pasir 10 cm,Kanstin Beton K350) | M2 | 212.499,76 | (belum diset) | |
103 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.4 |
Pedestrian Crossing Traffic Light (PCTL) dengan 2 Tiang |
|
|
Titik |
|
|
2.6.3.7.1 |
- |
- |
1 |
unit |
0,00 |
0,00 |
2.6.6.1.1 |
- |
- |
1 |
M1 |
0,00 |
0,00 |
2.6.6.1.1 |
- |
- |
30 |
M1 |
0,00 |
0,00 |
2.6.6.1.1 |
- |
- |
75 |
meter |
0,00 |
0,00 |
2.6.6.8.1 |
- |
- |
1 |
unit |
0,00 |
0,00 |
2.6.6.17.1 |
- |
- |
1 |
unit |
0,00 |
0,00 |
2.7.1.1.1 |
- |
- |
2 |
unit |
0,00 |
0,00 |
20.1.1.8.7 |
- |
- |
47.04 |
Kg |
0,00 |
0,00 |
20.1.1.8.10 |
- |
- |
58 |
buah |
0,00 |
0,00 |
20.1.1.8.13 |
- |
- |
7.59 |
M2 |
0,00 |
0,00 |
20.1.1.8.15 |
- |
- |
25 |
Kg |
0,00 |
0,00 |
20.2.7.8.1 |
- |
- |
1 |
buah |
0,00 |
0,00 |
20.5.2.1.1 |
- |
- |
2 |
buah |
0,00 |
0,00 |
22.1.1.2.1 |
- |
- |
1.692 |
M2 |
0,00 |
0,00 |
22.1.2.1.1 |
- |
- |
1 |
unit |
0,00 |
0,00 |
23.2.2.3.1 |
- |
- |
1 |
unit |
0,00 |
0,00 |
24.1.2.7 |
- |
Penggalian Tanah Biasa untuk Konstruksi |
1 |
M3 |
0,00 |
0,00 |
24.1.2.8 |
- |
Penggalian Tanah Keras |
0.4 |
M3 |
0,00 |
0,00 |
24.1.2.8 |
- |
Penggalian Tanah Keras |
0.9295 |
M3 |
0,00 |
0,00 |
24.1.2.8 |
- |
Penggalian Tanah Keras |
1.17975 |
M3 |
0,00 |
0,00 |
24.1.2.8 |
- |
Penggalian Tanah Keras |
1.188 |
M3 |
0,00 |
0,00 |
24.1.2.8 |
- |
Penggalian Tanah Keras |
2.55 |
M3 |
0,00 |
0,00 |
24.1.2.13 |
- |
Pengurugan Tanah Kembali untuk Konstruksi |
3.55 |
M3 |
0,00 |
0,00 |
24.2.1.22 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
2 |
titik |
0,00 |
0,00 |
24.2.1.24 |
- |
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) |
0.375 |
M3 |
0,00 |
0,00 |
24.2.1.24 |
- |
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) |
0.5 |
M3 |
0,00 |
0,00 |
24.3.1.7 |
- |
Pekerjaan Beton K-225 |
0.238 |
M3 |
0,00 |
0,00 |
24.3.1.7 |
- |
Pekerjaan Beton K-225 |
0.605 |
M3 |
0,00 |
0,00 |
24.3.1.14 |
- |
Pekerjaan Pembesian dengan besi beton (polos/ulir) |
0.6345 |
Kg |
0,00 |
0,00 |
24.3.1.14 |
- |
Pekerjaan Pembesian dengan besi beton (polos/ulir) |
0.66825 |
Kg |
0,00 |
0,00 |
24.3.1.14 |
- |
Pekerjaan Pembesian dengan besi beton (polos/ulir) |
1.8 |
Kg |
0,00 |
0,00 |
24.3.1.14 |
- |
Pekerjaan Pembesian dengan besi beton (polos/ulir) |
11.16 |
Kg |
0,00 |
0,00 |
24.3.1.14 |
- |
Pekerjaan Pembesian dengan besi beton (polos/ulir) |
35.068 |
Kg |
0,00 |
0,00 |
24.3.1.14 |
- |
Pekerjaan Pembesian dengan besi beton (polos/ulir) |
43.92 |
Kg |
0,00 |
0,00 |
24.3.1.17 |
- |
Pekerjaan Bekisting Sloof |
0.24 |
M2 |
0,00 |
0,00 |
24.3.1.17 |
- |
Pekerjaan Bekisting Sloof |
0.81 |
M2 |
0,00 |
0,00 |
24.4.2.6 |
- |
Pengecatan Besi |
3.384 |
M2 |
0,00 |
0,00 |
24.5.1.3 |
- |
Pemasangan Tegel Keramik 40x40 cm |
1.68 |
M2 |
0,00 |
0,00 |
24.6.2.22 |
- |
Pemasangan Talang Pembuluh Pipa PVC 3" Type AW |
2 |
M1 |
0,00 |
0,00 |
24.7.5.6 |
- |
Pekerjaan Besi Pipa Galvanis 2 " (Medium) |
6 |
M |
0,00 |
0,00 |
24.7.5.9 |
- |
Pekerjaan Besi Pipa Galvanis 4 " (Medium) |
2.5 |
M |
0,00 |
0,00 |
24.8.3.3 |
- |
Pemasangan Kabel Bawah Tanah |
30 |
M |
0,00 |
0,00 |
24.8.3.52 |
- |
Pemasangan Tiang Oktagonal 5 m Double Hot Dipped Galvanized dengan Flenders |
2 |
unit |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.2.4.1 | Pedestrian Crossing Traffic Light (PCTL) dengan 2 Tiang | unit | 0,00 | (belum diset) | |
104 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.4 |
Pedestrian Crossing Traffic Light (PCTL) dengan 2 Tiang |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.2.4.1 | Pedestrian Crossing Traffic Light (PCTL) dengan 2 Tiang | unit | 0,00 | (belum diset) | |
105 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.4 |
Pedestrian Crossing Traffic Light (PCTL) dengan 2 Tiang |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
1 |
M3 |
118.270,00 |
118.270,00 |
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
6.2473 |
M3 |
157.417,60 |
983.435,00 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
3.55 |
M3 |
85.740,00 |
304.377,00 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
2 |
titik |
193.385,05 |
386.770,09 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.843 |
M3 |
1.943.652,28 |
1.638.498,86 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
49.3308 |
kilogram |
23.046,93 |
1.136.923,44 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
43.92 |
kilogram |
23.886,93 |
1.049.113,89 |
24.1.4.51 |
- |
Bekisting untuk Sloof |
1.05 |
M2 |
436.108,01 |
457.913,39 |
24.1.7.8 |
- |
Pengecatan Besi |
3.384 |
M2 |
53.052,00 |
179.527,97 |
24.1.8.5 |
- |
Pemasangan Lantai Keramik ukuran 40x40 cm |
1.68 |
M2 |
1.423.510,50 |
2.391.497,56 |
24.1.9.40 |
- |
Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh |
57 |
M1 |
88.017,30 |
5.016.986,26 |
24.1.14.5 |
- |
Pekerjaan Besi Pipa Galvanis 2 " (Medium) |
6 |
meter |
59.416,00 |
356.495,99 |
24.1.14.8 |
- |
Pekerjaan Besi Pipa Galvanis 4 " (Medium) |
2.5 |
meter |
118.832,00 |
297.079,99 |
24.2.2.3 |
- |
Pemasangan Kabel Bawah Tanah |
30 |
M |
307.070,00 |
9.212.100,00 |
24.2.2.52 |
- |
Pemasangan Tiang Oktagonal 5 m Double Hot Dipped Galvanized dengan Flenders |
2 |
unit |
5.692.159,00 |
11.384.318,00 |
117.1.1.1.22.223 |
- |
Pabrikasi/Elektroda Baja(20%) |
7.59 |
M2 |
46.900,00 |
355.971,01 |
117.1.2.11.2.87 |
- |
Angker Besi PJU. |
25 |
Kg |
17.800,00 |
445.000,00 |
117.1.3.8.1.26 |
- |
Kabel NYFGbY 3 x 4 mm |
291 |
meter |
49.400,00 |
14.375.400,00 |
117.1.3.8.1.47 |
- |
Kabel NYM 3 x 2,5 mm |
3.5 |
Roll |
858.100,00 |
3.003.350,00 |
117.1.3.8.1.88 |
- |
Kabel TWISTED 2 x 15 mm |
75 |
meter |
13.400,00 |
1.005.000,00 |
|
|
|
|
|
Nilai ASB |
54.098.028,46 |
| 2020 | 28.4.2.4.1 | Pedestrian Crossing Traffic Light (PCTL) dengan 2 Tiang | unit | 54.098.028,46 | (belum diset) | |
106 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.5 |
Pedestrian Crossing Traffic Light (PCTL) dengan 4 Tiang |
|
|
Titik |
|
|
2.6.3.7.1 |
- |
- |
1 |
unit |
0,00 |
0,00 |
2.6.6.1.1 |
- |
- |
1 |
M1 |
0,00 |
0,00 |
2.6.6.1.1 |
- |
- |
30 |
M1 |
0,00 |
0,00 |
2.6.6.1.1 |
- |
- |
75 |
meter |
0,00 |
0,00 |
2.6.6.1.1 |
- |
- |
125 |
meter |
0,00 |
0,00 |
2.6.6.1.1 |
- |
- |
400 |
M1 |
0,00 |
0,00 |
2.6.6.5.7 |
- |
- |
6 |
unit |
0,00 |
0,00 |
2.6.6.8.1 |
- |
- |
1 |
unit |
0,00 |
0,00 |
2.6.6.16.1 |
- |
- |
5 |
buah |
0,00 |
0,00 |
2.6.6.17.1 |
- |
- |
1 |
unit |
0,00 |
0,00 |
2.7.1.1.1 |
- |
- |
2 |
unit |
0,00 |
0,00 |
20.1.1.8.7 |
- |
- |
78.4 |
Kg |
0,00 |
0,00 |
20.1.1.8.10 |
- |
- |
55 |
buah |
0,00 |
0,00 |
20.1.1.8.10 |
- |
- |
60 |
buah |
0,00 |
0,00 |
20.1.1.8.13 |
- |
- |
12.65 |
M2 |
0,00 |
0,00 |
20.1.1.8.15 |
- |
- |
25 |
Kg |
0,00 |
0,00 |
20.2.7.8.1 |
- |
- |
1 |
buah |
0,00 |
0,00 |
20.5.2.1.1 |
- |
- |
2 |
buah |
0,00 |
0,00 |
20.5.2.1.1 |
- |
- |
7 |
buah |
0,00 |
0,00 |
22.1.1.2.1 |
- |
- |
2.256 |
M2 |
0,00 |
0,00 |
22.1.1.3.20 |
- |
- |
2 |
unit |
0,00 |
0,00 |
22.1.1.4.1 |
- |
- |
4 |
unit |
0,00 |
0,00 |
22.1.2.1.1 |
- |
- |
1 |
unit |
0,00 |
0,00 |
22.1.6.3.1 |
- |
- |
4 |
buah |
0,00 |
0,00 |
23.2.2.3.1 |
- |
- |
1 |
unit |
0,00 |
0,00 |
24.1.2.7 |
- |
Penggalian Tanah Biasa untuk Konstruksi |
1 |
M3 |
0,00 |
0,00 |
24.1.2.8 |
- |
Penggalian Tanah Keras |
0.4 |
M3 |
0,00 |
0,00 |
24.1.2.8 |
- |
Penggalian Tanah Keras |
0.6655 |
M3 |
0,00 |
0,00 |
24.1.2.8 |
- |
Penggalian Tanah Keras |
0.9295 |
M3 |
0,00 |
0,00 |
24.1.2.8 |
- |
Penggalian Tanah Keras |
1.573 |
M3 |
0,00 |
0,00 |
24.1.2.8 |
- |
Penggalian Tanah Keras |
1.98 |
M3 |
0,00 |
0,00 |
24.1.2.8 |
- |
Penggalian Tanah Keras |
7.5 |
M3 |
0,00 |
0,00 |
24.1.2.13 |
- |
Pengurugan Tanah Kembali untuk Konstruksi |
8.5 |
M3 |
0,00 |
0,00 |
24.2.1.22 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
2 |
titik |
0,00 |
0,00 |
24.2.1.24 |
- |
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) |
0.375 |
M3 |
0,00 |
0,00 |
24.2.1.24 |
- |
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) |
0.8 |
M3 |
0,00 |
0,00 |
24.3.1.7 |
- |
Pekerjaan Beton K-225 |
0.238 |
M3 |
0,00 |
0,00 |
24.3.1.7 |
- |
Pekerjaan Beton K-225 |
0.4455 |
M3 |
0,00 |
0,00 |
24.3.1.7 |
- |
Pekerjaan Beton K-225 |
0.605 |
M3 |
0,00 |
0,00 |
24.3.1.14 |
- |
Pekerjaan Pembesian dengan besi beton (polos/ulir) |
0.891 |
Kg |
0,00 |
0,00 |
24.3.1.14 |
- |
Pekerjaan Pembesian dengan besi beton (polos/ulir) |
1.0575 |
Kg |
0,00 |
0,00 |
24.3.1.14 |
- |
Pekerjaan Pembesian dengan besi beton (polos/ulir) |
1.8 |
Kg |
0,00 |
0,00 |
24.3.1.14 |
- |
Pekerjaan Pembesian dengan besi beton (polos/ulir) |
14.88 |
Kg |
0,00 |
0,00 |
24.3.1.14 |
- |
Pekerjaan Pembesian dengan besi beton (polos/ulir) |
23.32 |
Kg |
0,00 |
0,00 |
24.3.1.14 |
- |
Pekerjaan Pembesian dengan besi beton (polos/ulir) |
35.068 |
Kg |
0,00 |
0,00 |
24.3.1.14 |
- |
Pekerjaan Pembesian dengan besi beton (polos/ulir) |
43.92 |
Kg |
0,00 |
0,00 |
24.3.1.17 |
- |
Pekerjaan Bekisting Sloof |
0.24 |
M2 |
0,00 |
0,00 |
24.3.1.17 |
- |
Pekerjaan Bekisting Sloof |
1.35 |
M2 |
0,00 |
0,00 |
24.4.2.6 |
- |
Pengecatan Besi |
4.512 |
M2 |
0,00 |
0,00 |
24.5.1.3 |
- |
Pemasangan Tegel Keramik 40x40 cm |
1.68 |
M2 |
0,00 |
0,00 |
24.6.2.22 |
- |
Pemasangan Talang Pembuluh Pipa PVC 3" Type AW |
2 |
M1 |
0,00 |
0,00 |
24.6.2.22 |
- |
Pemasangan Talang Pembuluh Pipa PVC 3" Type AW |
75 |
M1 |
0,00 |
0,00 |
24.7.5.6 |
- |
Pekerjaan Besi Pipa Galvanis 2 " (Medium) |
6 |
M |
0,00 |
0,00 |
24.7.5.9 |
- |
Pekerjaan Besi Pipa Galvanis 4 " (Medium) |
2 |
M |
0,00 |
0,00 |
24.8.3.3 |
- |
Pemasangan Kabel Bawah Tanah |
45 |
M |
0,00 |
0,00 |
24.8.3.52 |
- |
Pemasangan Tiang Oktagonal 5 m Double Hot Dipped Galvanized dengan Flenders |
2 |
unit |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.2.5.1 | Pedestrian Crossing Traffic Light (PCTL) dengan 4 Tiang | unit | 0,00 | (belum diset) | |
107 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.5 |
Pedestrian Crossing Traffic Light (PCTL) dengan 4 Tiang |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.2.5.1 | Pedestrian Crossing Traffic Light (PCTL) dengan 4 Tiang | unit | 0,00 | (belum diset) | |
108 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.5 |
Pedestrian Crossing Traffic Light (PCTL) dengan 4 Tiang |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
1 |
M3 |
118.270,00 |
118.270,00 |
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
13.048 |
M3 |
157.417,60 |
2.053.984,90 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
8.5 |
M3 |
85.740,00 |
728.790,00 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
2 |
titik |
193.385,05 |
386.770,09 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
1.2885 |
M3 |
1.943.652,28 |
2.504.395,87 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
96.7255 |
kilogram |
23.046,93 |
2.229.225,81 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
24.211 |
kilogram |
23.886,93 |
578.326,46 |
24.1.4.51 |
- |
Bekisting untuk Sloof |
1.59 |
M2 |
436.108,01 |
693.411,75 |
24.1.7.8 |
- |
Pengecatan Besi |
4.512 |
M2 |
53.052,00 |
239.370,63 |
24.1.8.0 |
- |
- |
1.68 |
M2 |
0,00 |
0,00 |
24.1.9.40 |
- |
Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh |
77 |
M1 |
88.017,30 |
6.777.332,32 |
24.1.14.5 |
- |
Pekerjaan Besi Pipa Galvanis 2 " (Medium) |
6 |
meter |
59.416,00 |
356.495,99 |
24.1.14.8 |
- |
Pekerjaan Besi Pipa Galvanis 4 " (Medium) |
2 |
meter |
118.832,00 |
237.663,99 |
24.2.2.3 |
- |
Pemasangan Kabel Bawah Tanah |
45 |
M |
307.070,00 |
13.818.150,00 |
24.2.2.52 |
- |
Pemasangan Tiang Oktagonal 5 m Double Hot Dipped Galvanized dengan Flenders |
2 |
unit |
5.692.159,00 |
11.384.318,00 |
117.1.1.1.22.223 |
- |
Pabrikasi/Elektroda Baja(20%) |
12.65 |
M2 |
46.900,00 |
593.284,98 |
117.1.2.11.2.87 |
- |
Angker Besi PJU. |
25 |
Kg |
17.800,00 |
445.000,00 |
117.1.3.8.1.26 |
- |
Kabel NYFGbY 3 x 4 mm |
431 |
meter |
49.400,00 |
21.291.400,00 |
117.1.3.8.1.47 |
- |
Kabel NYM 3 x 2,5 mm |
5 |
Roll |
858.100,00 |
4.290.500,00 |
117.1.3.8.1.88 |
- |
Kabel TWISTED 2 x 15 mm |
75 |
meter |
13.400,00 |
1.005.000,00 |
|
|
|
|
|
Nilai ASB |
69.731.690,79 |
| 2020 | 28.4.2.5.1 | Pedestrian Crossing Traffic Light (PCTL) dengan 4 Tiang | unit | 69.731.690,79 | (belum diset) | |
109 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.5.1 |
Pedestrian Dengan Saluran |
|
|
Titik |
|
|
2.6.1.5.7 |
- |
- |
0.00138 |
buah |
0,00 |
0,00 |
20.1.1.44.1 |
- |
- |
0.05 |
buah |
0,00 |
0,00 |
20.1.1.44.1 |
- |
- |
0.06 |
buah |
0,00 |
0,00 |
22.1.1.2.1 |
- |
- |
0.008 |
buah |
0,00 |
0,00 |
23.4.1.1.1 |
- |
- |
1 |
M |
0,00 |
0,00 |
24.1.1.1 |
- |
- |
0.0385 |
titik |
0,00 |
0,00 |
24.1.1.3 |
- |
- |
1 |
M2 |
0,00 |
0,00 |
24.1.1.5 |
- |
- |
1 |
M2 |
0,00 |
0,00 |
24.4.1.19 |
- |
Plesteran Ciprat 1 Pc : 2PS |
0.056 |
M2 |
0,00 |
0,00 |
24.5.1.12 |
- |
Pemasangan Tegel Porceline 40x40 cm |
0.95 |
M2 |
0,00 |
0,00 |
24.5.1.13 |
- |
Pemasangan Lantai Granit diglasur 20 x 40 cm (warna gelap) |
0.056 |
M2 |
0,00 |
0,00 |
24.8.2.29 |
- |
Pas Curbing Type B panjang 0.5 m |
0.093333 |
M |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 25.1.5.1.1 | Pedestrian Dengan Saluran | M2 | 0,00 | (belum diset) | |
110 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.5.1 |
Pedestrian Dengan Saluran |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 25.1.5.1.1 | Pedestrian Dengan Saluran | M2 | 0,00 | (belum diset) | |
111 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.5.1 |
Pedestrian Dengan Saluran |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.0385 |
M1 |
113.758,40 |
4.379,70 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
1 |
M2 |
8.975,66 |
8.975,66 |
24.1.6.22 |
- |
Plesteran Ciprat 1 Pc : 2PS |
0.056 |
M2 |
80.766,60 |
4.522,93 |
|
|
|
|
|
Nilai ASB |
30.588,29 |
| 2020 | 25.1.5.1.1 | Pedestrian Dengan Saluran | M2 | 30.588,29 | (belum diset) | |
112 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.5.2 |
Pedestrian Dengan Saluran U-Gutter + Curbing + Wiremesh U-50 |
|
|
Titik |
|
|
20.1.1.4.1 |
- |
- |
0.06578 |
M3 |
0,00 |
0,00 |
20.1.1.9.1 |
- |
- |
0.043113 |
buah |
0,00 |
0,00 |
20.1.1.44.1 |
- |
- |
0.328882 |
buah |
0,00 |
0,00 |
24.1.2.6 |
- |
Pengangkutan Tanah keluar Proyek |
0.454971 |
M3 |
0,00 |
0,00 |
24.1.2.8 |
- |
Penggalian Tanah Keras |
0.000961 |
M3 |
0,00 |
0,00 |
24.1.2.15 |
- |
Pengurugan Pasir (PADAT) |
0.039466 |
M3 |
0,00 |
0,00 |
24.3.1.2 |
- |
Pekerjaan Beton K-125 |
0.001121 |
M3 |
0,00 |
0,00 |
24.3.1.7 |
- |
Pekerjaan Beton K-225 |
0.1 |
M3 |
0,00 |
0,00 |
24.3.1.15 |
- |
Pekerjaan Pembesian Wire Mesh |
0.101213 |
M2 |
0,00 |
0,00 |
24.4.1.1 |
- |
Pemasangan Dinding Batu Merah 1 Pc : 2 Pp tebal 1 bata |
0.004449 |
M2 |
0,00 |
0,00 |
24.4.1.1 |
- |
Pemasangan Dinding Batu Merah 1 Pc : 2 Pp tebal 1 bata |
0.0079 |
M2 |
0,00 |
0,00 |
24.4.1.19 |
- |
Plesteran Ciprat 1 Pc : 2PS |
0.045269 |
M2 |
0,00 |
0,00 |
24.4.1.19 |
- |
Plesteran Ciprat 1 Pc : 2PS |
0.068963 |
M2 |
0,00 |
0,00 |
24.5.1.13 |
- |
Pemasangan Lantai Granit diglasur 20 x 40 cm (warna gelap) |
1 |
M2 |
0,00 |
0,00 |
24.7.3.23 |
- |
Pemasangan Lubang Drainase |
0.00673 |
buah |
0,00 |
0,00 |
24.7.3.23 |
- |
Pemasangan Lubang Drainase |
0.44728 |
buah |
0,00 |
0,00 |
24.7.3.27 |
- |
Galian Drainase |
0.4472 |
M3 |
0,00 |
0,00 |
24.8.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
0.334224 |
M |
0,00 |
0,00 |
24.8.1.8 |
- |
Stopper/Uskup tebal 6 cm abu -abu |
0.3342 |
M |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 25.1.5.2.1 | Pedestrian Dengan Saluran U-Gutter + Curbing + Wiremesh U-50 | M2 | 0,00 | (belum diset) | |
113 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.5.2 |
Pedestrian Dengan Saluran U-Gutter + Curbing + Wiremesh U-50 |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 25.1.5.2.1 | Pedestrian Dengan Saluran U-Gutter + Curbing + Wiremesh U-50 | M2 | 0,00 | (belum diset) | |
114 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.5.2 |
Pedestrian Dengan Saluran U-Gutter + Curbing + Wiremesh U-50 |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.001 |
M3 |
157.417,60 |
157,42 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0395 |
M3 |
471.628,02 |
18.629,31 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
0.455 |
M3 |
166.100,00 |
75.575,50 |
24.1.4.7 |
- |
Beton mutu f'c 9,8 Mpa (K-125), slump (12±2) cm. w/c=0,78, dengan Molen |
0.0011 |
M3 |
1.706.080,36 |
1.876,69 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1 |
M3 |
1.943.652,28 |
194.365,23 |
24.1.6.1 |
- |
Dinding Batu Merah 1 Pc : 2 Pp tebal 1 bata |
0.0044 |
M2 |
362.416,00 |
1.594,63 |
24.1.6.6 |
- |
Dinding Batu Merah 1 Pc : 3 Pp tebal 1/2 bata |
0.1012 |
M2 |
162.020,00 |
16.396,42 |
24.1.6.22 |
- |
Plesteran Ciprat 1 Pc : 2PS |
0.0453 |
M2 |
80.766,60 |
3.658,73 |
24.1.8.7 |
- |
Pemasangan Lantai Keramik ukuran 40x40 cm setara Essenza |
1 |
M2 |
4.870.460,50 |
4.870.460,50 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
0.4473 |
buah |
22.941,10 |
10.261,55 |
24.1.12.24 |
- |
Galian Drainase |
0.4472 |
M3 |
120.370,00 |
53.829,46 |
24.2.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
0.3342 |
M |
127.630,24 |
42.654,03 |
24.2.1.8 |
- |
Stopper/Uskup tebal 6 cm abu - abu |
0.3342 |
M |
50.428,90 |
16.853,34 |
|
|
|
|
|
Nilai ASB |
5.306.312,81 |
| 2020 | 25.1.5.2.1 | Pedestrian Dengan Saluran U-Gutter + Curbing + Wiremesh U-50 | M2 | 5.306.312,81 | (belum diset) | |
115 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.3 |
PEKERJAAN PEMBUATAN LAPANGAN BOLA BASKET (39 x 17,6 m2) |
|
|
Titik |
|
|
24.1.1.4 |
- |
- |
0.0057 |
M1 |
0,00 |
0,00 |
24.1.1.7 |
- |
- |
1 |
M2 |
0,00 |
0,00 |
24.1.2.1 |
- |
Pembersihan Lapangan dan Perataan Tanah |
0.0003 |
M3 |
0,00 |
0,00 |
24.1.4.57 |
- |
- |
0.0001 |
M3 |
0,00 |
0,00 |
24.1.4.74 |
- |
- |
0.0248 |
M3 |
0,00 |
0,00 |
24.1.7.8 |
- |
- |
0.0141 |
M2 |
0,00 |
0,00 |
24.1.8.19 |
- |
- |
0.0488 |
M2 |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.3.1.3.1 | PEKERJAAN PEMBUATAN LAPANGAN BOLA BASKET (39 x 17,6 m2) | M2 | 0,00 | (belum diset) | |
116 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.3 |
PEKERJAAN PEMBUATAN LAPANGAN BOLA BASKET (39 x 17,6 m2) |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.3.1.3.1 | PEKERJAAN PEMBUATAN LAPANGAN BOLA BASKET (39 x 17,6 m2) | M2 | 0,00 | (belum diset) | |
117 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.3 |
PEKERJAAN PEMBUATAN LAPANGAN BOLA BASKET (39 x 17,6 m2) |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.0057 |
M1 |
113.758,40 |
648,42 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.0003 |
M3 |
118.270,00 |
35,48 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
4.73825E-5 |
M3 |
471.628,02 |
22,35 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
1.88551E-5 |
M3 |
1.943.652,28 |
36,65 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.0001 |
M3 |
6.383.804,41 |
638,38 |
24.1.4.74 |
- |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
0.0248 |
M3 |
8.648.594,42 |
214.485,15 |
24.1.7.8 |
- |
Pengecatan Besi |
0.0141 |
M2 |
53.052,00 |
748,03 |
24.1.7.13 |
- |
Pekerjaan Teer Kayu |
2.2589 |
M2 |
43.183,30 |
97.546,75 |
24.1.8.19 |
- |
Pembuatan/Pemasangan Hardener Floor (Granit Trase Corak) |
0.0488 |
M2 |
75.971,20 |
3.707,39 |
|
|
|
|
|
Nilai ASB |
330.578,61 |
| 2020 | 28.3.1.3.1 | PEKERJAAN PEMBUATAN LAPANGAN BOLA BASKET (39 x 17,6 m2) | M2 | 330.578,61 | (belum diset) | |
118 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.4 |
PEKERJAAN PEMBUATAN LAPANGAN BOLA VOLLEY (11X22m) |
|
|
Titik |
|
|
24.1.1.4 |
- |
- |
0.0496 |
M1 |
0,00 |
0,00 |
24.1.1.7 |
- |
- |
0.0541 |
M2 |
0,00 |
0,00 |
24.1.2.1 |
- |
Pembersihan Lapangan dan Perataan Tanah |
0.0157 |
M3 |
0,00 |
0,00 |
24.1.2.9 |
- |
Galian Tanah Cadas/Rabat |
0.0007 |
M3 |
0,00 |
0,00 |
24.1.2.11 |
- |
Penggalian Lumpur dengan Alat Berat |
0.0049 |
M3 |
0,00 |
0,00 |
24.1.4.3 |
- |
- |
0.0001 |
M3 |
0,00 |
0,00 |
24.1.4.23 |
- |
- |
0.0049 |
M3 |
0,00 |
0,00 |
24.1.4.57 |
- |
- |
0.001 |
M3 |
0,00 |
0,00 |
24.1.4.60 |
- |
- |
0.0095 |
M3 |
0,00 |
0,00 |
24.1.4.74 |
- |
- |
0.03 |
M3 |
0,00 |
0,00 |
24.1.7.8 |
- |
- |
0.0331 |
M2 |
0,00 |
0,00 |
24.1.7.13 |
- |
- |
2.06 |
M2 |
0,00 |
0,00 |
24.1.8.19 |
- |
- |
0.2 |
M2 |
0,00 |
0,00 |
24.1.11.1 |
- |
- |
0.0083 |
titik |
0,00 |
0,00 |
24.1.14.5 |
- |
- |
0.0165 |
meter |
0,00 |
0,00 |
24.1.14.7 |
- |
- |
0.0562 |
meter |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.3.1.4.1 | PEKERJAAN PEMBUATAN LAPANGAN BOLA VOLLEY (11X22m) | M2 | 0,00 | (belum diset) | |
119 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.4 |
PEKERJAAN PEMBUATAN LAPANGAN BOLA VOLLEY (11X22m) |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.3.1.4.1 | PEKERJAAN PEMBUATAN LAPANGAN BOLA VOLLEY (11X22m) | M2 | 0,00 | (belum diset) | |
120 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.4 |
PEKERJAAN PEMBUATAN LAPANGAN BOLA VOLLEY (11X22m) |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.0496 |
M1 |
113.758,40 |
5.642,42 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
0.0041 |
M2 |
12.710,00 |
52,11 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.003 |
M3 |
118.270,00 |
354,81 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.0007 |
M3 |
85.740,00 |
60,02 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0001 |
M3 |
471.628,02 |
47,16 |
24.1.4.3 |
- |
Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, dengan Molen |
0.0001 |
M3 |
1.689.836,57 |
168,98 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.0001 |
M3 |
1.943.652,28 |
194,37 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.001 |
M3 |
6.383.804,41 |
6.383,80 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.0095 |
M3 |
7.944.915,55 |
75.476,70 |
24.1.4.74 |
- |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
0.03 |
M3 |
8.648.594,42 |
259.457,83 |
24.1.7.8 |
- |
Pengecatan Besi |
0.0331 |
M2 |
53.052,00 |
1.756,02 |
24.1.7.13 |
- |
Pekerjaan Teer Kayu |
0.06 |
M2 |
43.183,30 |
2.591,00 |
24.1.8.19 |
- |
Pembuatan/Pemasangan Hardener Floor (Granit Trase Corak) |
0.2 |
M2 |
75.971,20 |
15.194,24 |
24.1.11.1 |
- |
Pemasangan Titik Stop Kontak Gedung |
0.0083 |
titik |
164.792,00 |
1.367,77 |
24.1.14.5 |
- |
Pekerjaan Besi Pipa Galvanis 2 " (Medium) |
0.0165 |
meter |
59.416,00 |
980,36 |
24.1.14.7 |
- |
Pekerjaan Besi Pipa Galvanis 3 " (Medium) |
0.0562 |
meter |
89.124,00 |
5.008,77 |
|
|
|
|
|
Nilai ASB |
374.736,36 |
| 2020 | 28.3.1.4.1 | PEKERJAAN PEMBUATAN LAPANGAN BOLA VOLLEY (11X22m) | M2 | 374.736,36 | (belum diset) | |