181 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.22 |
Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) |
|
|
Titik |
|
|
20.1.1.44.1 |
- |
- |
1 |
M |
0,00 |
0,00 |
23.2.2.3.1 |
- |
- |
800 |
VA |
0,00 |
0,00 |
24.8.3.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
0,00 |
0,00 |
24.8.3.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
0,00 |
0,00 |
24.8.3.22 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m |
1 |
M |
0,00 |
0,00 |
24.8.3.28 |
- |
Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.45 |
- |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
0,00 |
0,00 |
24.8.3.49 |
- |
Pondasi Strous PJU |
1 |
titik |
0,00 |
0,00 |
24.8.3.55 |
- |
Pemasangan Tiang Oktagonal 9 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 27.1.1.22.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) | 500 gr | 0,00 | (belum diset) | |
182 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.22 |
Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 27.1.1.22.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) | 500 gr | 0,00 | (belum diset) | |
183 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.22 |
Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.22 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m |
1 |
M |
10.550.159,81 |
10.550.159,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.45 |
- |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.55 |
- |
Pemasangan Tiang Oktagonal 9 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
6.994.859,00 |
6.994.859,00 |
|
|
|
|
|
Nilai ASB |
20.663.208,31 |
| 2020 | 27.1.1.22.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) | titik | 20.663.208,31 | (belum diset) | |
184 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.25 |
Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) |
|
|
Titik |
|
|
20.1.1.44.1 |
- |
- |
1 |
M |
0,00 |
0,00 |
23.2.2.3.1 |
- |
- |
1600 |
VA |
0,00 |
0,00 |
24.8.3.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
0,00 |
0,00 |
24.8.3.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
0,00 |
0,00 |
24.8.3.28 |
- |
Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.45 |
- |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
2 |
unit |
0,00 |
0,00 |
24.8.3.49 |
- |
Pondasi Strous PJU |
1 |
titik |
0,00 |
0,00 |
24.8.3.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
0,00 |
0,00 |
25.1.1.2 |
- |
- |
1 |
M |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 27.1.1.25.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) | 500 gr | 0,00 | (belum diset) | |
185 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.25 |
Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 27.1.1.25.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) | 500 gr | 0,00 | (belum diset) | |
186 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.25 |
Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.45 |
- |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
2 |
unit |
218.975,00 |
437.950,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
5.692.159,00 |
5.692.159,00 |
|
|
|
|
|
Nilai ASB |
24.557.933,31 |
| 2020 | 27.1.1.25.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) | titik | 24.557.933,31 | (belum diset) | |
187 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.23 |
Pemasangan Paku Jalan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.23.1 | Pemasangan Paku Jalan | unit | 0,00 | (belum diset) | |
188 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.23 |
Pemasangan Paku Jalan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.23.1 | Pemasangan Paku Jalan | unit | 0,00 | (belum diset) | |
189 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.23 |
Pemasangan Paku Jalan |
|
|
Titik |
|
|
123.1.1.1.1.6 |
- |
Mandor |
0.083 |
OH |
206.800,00 |
17.164,40 |
123.1.1.1.1.14 |
- |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
|
|
|
|
|
Nilai ASB |
167.964,40 |
| 2020 | 28.4.1.23.1 | Pemasangan Paku Jalan | unit | 167.964,40 | (belum diset) | |
190 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.24 |
Pemasangan Paku Jalan Solar dengan LED Light dan Capasitor |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.24.1 | Pemasangan Paku Jalan Solar dengan LED Light dan Capasitor | unit | 0,00 | (belum diset) | |
191 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.24 |
Pemasangan Paku Jalan Solar dengan LED Light dan Capasitor |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.24.1 | Pemasangan Paku Jalan Solar dengan LED Light dan Capasitor | unit | 0,00 | (belum diset) | |
192 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.24 |
Pemasangan Paku Jalan Solar dengan LED Light dan Capasitor |
|
|
Titik |
|
|
123.1.1.1.1.6 |
- |
Mandor |
0.083 |
OH |
206.800,00 |
17.164,40 |
123.1.1.1.1.14 |
- |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
|
|
|
|
|
Nilai ASB |
167.964,40 |
| 2020 | 28.4.1.24.1 | Pemasangan Paku Jalan Solar dengan LED Light dan Capasitor | unit | 167.964,40 | (belum diset) | |
193 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.15 |
Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.15.1 | Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap | unit | 0,00 | (belum diset) | |
194 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.15 |
Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.15.1 | Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap | unit | 0,00 | (belum diset) | |
195 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.15 |
Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.075 |
M3 |
1.943.652,28 |
145.773,93 |
|
|
|
|
|
Nilai ASB |
145.773,93 |
| 2020 | 28.4.1.15.1 | Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap | unit | 145.773,93 | (belum diset) | |
196 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.16 |
Pemasangan Papan Peringatan / Himbauan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.16.1 | Pemasangan Papan Peringatan / Himbauan | unit | 0,00 | (belum diset) | |
197 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.16 |
Pemasangan Papan Peringatan / Himbauan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.16.1 | Pemasangan Papan Peringatan / Himbauan | unit | 0,00 | (belum diset) | |
198 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.16 |
Pemasangan Papan Peringatan / Himbauan |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.35 |
M3 |
1.943.652,28 |
680.278,29 |
|
|
|
|
|
Nilai ASB |
680.278,29 |
| 2020 | 28.4.1.16.1 | Pemasangan Papan Peringatan / Himbauan | unit | 680.278,29 | (belum diset) | |
199 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.17 |
Pemasangan Papan Petunjuk |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.17.1 | Pemasangan Papan Petunjuk | unit | 0,00 | (belum diset) | |
200 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.17 |
Pemasangan Papan Petunjuk |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.17.1 | Pemasangan Papan Petunjuk | unit | 0,00 | (belum diset) | |