1 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.1 |
Box Panel UPS Alumunium |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.2.1.1 | Box Panel UPS Alumunium | unit | 0,00 | (belum diset) | |
2 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.1 |
Box Panel UPS Alumunium |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.2.1.1 | Box Panel UPS Alumunium | unit | 0,00 | (belum diset) | |
3 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.1 |
Box Panel UPS Alumunium |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.2475 |
M3 |
157.417,60 |
38.960,86 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.27 |
M3 |
1.943.652,28 |
524.786,14 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
4 |
kilogram |
23.046,93 |
92.187,72 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
10.37 |
kilogram |
23.886,93 |
247.707,45 |
24.1.4.50 |
- |
Bekisting untuk Pondasi |
0.3 |
M2 |
402.621,99 |
120.786,60 |
24.1.9.40 |
- |
Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh |
1 |
M1 |
88.017,30 |
88.017,30 |
117.1.3.8.1.35 |
- |
Kabel NYFGbY 4 x 6 mm |
5 |
meter |
80.100,00 |
400.500,00 |
|
|
|
|
|
Nilai ASB |
1.512.946,07 |
| 2020 | 28.4.2.1.1 | Box Panel UPS Alumunium | unit | 1.512.946,07 | (belum diset) | |
4 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.6 |
Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.6.1 | Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
5 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.6 |
Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.6.1 | Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
6 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.6 |
Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.54 |
M2 |
2.011.392,60 |
1.086.152,05 |
|
|
|
|
|
Nilai ASB |
1.086.152,05 |
| 2020 | 28.4.1.6.1 | Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan | unit | 1.086.152,05 | (belum diset) | |
7 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.5 |
Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.5.1 | Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
8 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.5 |
Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.5.1 | Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
9 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.5 |
Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.825 |
M2 |
2.011.392,60 |
1.659.398,87 |
|
|
|
|
|
Nilai ASB |
1.659.398,87 |
| 2020 | 28.4.1.5.1 | Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan | unit | 1.659.398,87 | (belum diset) | |
10 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.9 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.9.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade | unit | 0,00 | (belum diset) | |
11 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.9 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.9.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade | unit | 0,00 | (belum diset) | |
12 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.9 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.36 |
M2 |
2.011.392,60 |
724.101,36 |
|
|
|
|
|
Nilai ASB |
724.101,36 |
| 2020 | 28.4.1.9.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade | unit | 724.101,36 | (belum diset) | |
13 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.8 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.8.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
14 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.8 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.8.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
15 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.8 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.54 |
M2 |
2.011.392,60 |
1.086.152,05 |
|
|
|
|
|
Nilai ASB |
1.086.152,05 |
| 2020 | 28.4.1.8.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan | unit | 1.086.152,05 | (belum diset) | |
16 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.7 |
Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.7.1 | Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
17 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.7 |
Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.7.1 | Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
18 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.7 |
Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.825 |
M2 |
2.011.392,60 |
1.659.398,87 |
|
|
|
|
|
Nilai ASB |
1.659.398,87 |
| 2020 | 28.4.1.7.1 | Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan | unit | 1.659.398,87 | (belum diset) | |
19 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.6.1.1 |
Gubug Jamur |
|
|
Titik |
|
|
2.5.2.1.1 |
- |
- |
1 |
buah |
0,00 |
0,00 |
2.6.2.6.8 |
- |
- |
80 |
buah |
0,00 |
0,00 |
2.6.2.6.39 |
- |
- |
60 |
pak |
0,00 |
0,00 |
20.1.1.10.2 |
- |
- |
40 |
buah |
0,00 |
0,00 |
20.1.1.20.1 |
- |
- |
26 |
batang |
0,00 |
0,00 |
20.1.1.20.1 |
- |
- |
30 |
M2 |
0,00 |
0,00 |
24.1.1.4 |
- |
- |
19 |
M2 |
0,00 |
0,00 |
24.1.2.7 |
- |
Penggalian Tanah Biasa untuk Konstruksi |
1.05 |
M3 |
0,00 |
0,00 |
24.1.2.14 |
- |
Pengurugan tanah dengan pemadatan |
5 |
M3 |
0,00 |
0,00 |
24.3.1.13 |
- |
Pekerjaan Beton ( 1Pc : 2 Ps : 3 Kr) |
0.6 |
M3 |
0,00 |
0,00 |
24.4.1.11 |
- |
Pemasangan Batu Merah Kosongan |
0.37 |
M3 |
0,00 |
0,00 |
24.6.1.6 |
- |
Pemasangan Reng Meranti/Usuk Kamper |
10.5 |
M2 |
0,00 |
0,00 |
24.6.2.10 |
- |
Pemasangan Wuwung Genteng Karang Pilang |
35 |
M1 |
0,00 |
0,00 |
24.7.1.11 |
- |
Pintu/Jendela Kaca Papan Kayu Kamper |
0.5 |
M2 |
0,00 |
0,00 |
25.1.1.2 |
- |
- |
42 |
batang |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.6.1.1.1 | Gubug Jamur | unit | 0,00 | (belum diset) | |
20 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.6.1.1 |
Gubug Jamur |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.6.1.1.1 | Gubug Jamur | unit | 0,00 | (belum diset) | |