1 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.1.1.1 |
Pemasangan Pipa Air Bersih Dia 110 dengan Eksisting Aspal |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.1.1.1.1 | Pemasangan Pipa Air Bersih Dia 110 dengan Eksisting Aspal | M1 | 0,00 | (belum diset) | |
2 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.1.1.2 |
Pemasangan Pipa Air Bersih Dia 110 dengan Eksisting Beton Rabat |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.1.1.2.1 | Pemasangan Pipa Air Bersih Dia 110 dengan Eksisting Beton Rabat | M | 0,00 | (belum diset) | |
3 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.2.1.1 |
Sumur Kebakaran |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.2.1.1.1 | Sumur Kebakaran | M3 | 0,00 | (belum diset) | |
4 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.2.1.2 |
Tandon Air Kebakaran |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.2.1.2.1 | Tandon Air Kebakaran | M3 | 0,00 | (belum diset) | |
5 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.7 |
Pembangunan Lapangan Olahraga Futsal Kecil (28x18m) |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.3.1.7.1 | Pembangunan Lapangan Olahraga Futsal Kecil (28x18m) | M2 | 0,00 | (belum diset) | |
6 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.8 |
Pembangunan Lapangan Olahraga Sepak Bola Konvensional ukuran 50m x 100m |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.3.1.8.1 | Pembangunan Lapangan Olahraga Sepak Bola Konvensional ukuran 50m x 100m | M2 | 0,00 | (belum diset) | |
7 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.9 |
Pembangunan Lapangan Olahraga Tenis dan Pagar |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.3.1.9.1 | Pembangunan Lapangan Olahraga Tenis dan Pagar | M2 | 0,00 | (belum diset) | |
8 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.10 |
Sumur Buis Beton diameter 80 cm |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.3.1.10.1 | Sumur Buis Beton diameter 80 cm | 500 gr | 0,00 | (belum diset) | |
9 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.1 |
Rambu Lalu Lintas (75 cm) Engineering Grade papan tambahan dan umpak beton |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.1.1 | Rambu Lalu Lintas (75 cm) Engineering Grade papan tambahan dan umpak beton | unit | 0,00 | (belum diset) | |
10 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.2 |
Rambu Lalu Lintas (60 cm) Engineering Grade papan tambahan dan umpak beton |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.2.1 | Rambu Lalu Lintas (60 cm) Engineering Grade papan tambahan dan umpak beton | unit | 0,00 | (belum diset) | |
11 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.3 |
Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan dan Umpak Beton |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.3.1 | Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan dan Umpak Beton | unit | 0,00 | (belum diset) | |
12 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.4 |
Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan dan Umpak Beton |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.4.1 | Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan dan Umpak Beton | unit | 0,00 | (belum diset) | |
13 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.5 |
Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.5.1 | Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
14 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.6 |
Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.6.1 | Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
15 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.7 |
Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.7.1 | Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
16 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.8 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.8.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
17 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.9 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.9.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade | unit | 0,00 | (belum diset) | |
18 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.10 |
Klem Galvanis Rambu Include Mur Baut |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.10.1 | Klem Galvanis Rambu Include Mur Baut | unit | 0,00 | (belum diset) | |
19 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.11 |
Pemasangan Tiang dan rambu RPPJ 2 m x 3 m |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.11.1 | Pemasangan Tiang dan rambu RPPJ 2 m x 3 m | unit | 0,00 | (belum diset) | |
20 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.12 |
Pemasangan Rambu RPPJ 2 m x 3 m |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.12.1 | Pemasangan Rambu RPPJ 2 m x 3 m | unit | 0,00 | (belum diset) | |