101 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.11 |
Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 6 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.18 |
- |
Intalasi 1 Titik Lampu PJU (Tarikan Udara) 7,5 m |
1 |
M |
4.400.309,81 |
4.400.309,81 |
24.2.2.27 |
- |
Pemasangan Ornamen Lampu PJU panjang 6m |
1 |
buah |
2.381.047,52 |
2.381.047,52 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
|
|
|
|
|
Nilai ASB |
8.799.138,43 |
| 2020 | 27.1.1.11.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 6 m | titik | 8.799.138,43 | (belum diset) | |
102 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.8 |
Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 3 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.17 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 4 m |
1 |
M |
2.350.359,81 |
2.350.359,81 |
24.2.2.26 |
- |
Pemasangan Ornamen Lampu PJU panjang 3m |
1 |
buah |
3.313.930,00 |
3.313.930,00 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.45 |
- |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
|
|
|
|
|
Nilai ASB |
7.682.070,91 |
| 2020 | 27.1.1.8.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 3 m | titik | 7.682.070,91 | (belum diset) | |
103 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.7 |
Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 3 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.17 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 4 m |
1 |
M |
2.350.359,81 |
2.350.359,81 |
24.2.2.26 |
- |
Pemasangan Ornamen Lampu PJU panjang 3m |
1 |
buah |
3.313.930,00 |
3.313.930,00 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
|
|
|
|
|
Nilai ASB |
7.682.070,91 |
| 2020 | 27.1.1.7.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 3 m | titik | 7.682.070,91 | (belum diset) | |
104 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.6 |
Pemasangan Lampu HPS 150 W - 1 Phase - Ornamen 3 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.17 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 4 m |
1 |
M |
2.350.359,81 |
2.350.359,81 |
24.2.2.26 |
- |
Pemasangan Ornamen Lampu PJU panjang 3m |
1 |
buah |
3.313.930,00 |
3.313.930,00 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.43 |
- |
Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
2.642.075,00 |
2.642.075,00 |
|
|
|
|
|
Nilai ASB |
10.105.170,91 |
| 2020 | 27.1.1.6.1 | Pemasangan Lampu HPS 150 W - 1 Phase - Ornamen 3 m | titik | 10.105.170,91 | (belum diset) | |
105 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.5 |
Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 2 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.16 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 3 m |
1 |
M |
1.764.659,81 |
1.764.659,81 |
24.2.2.25 |
- |
Pemasangan Ornamen Lampu PJU panjang 2m |
1 |
buah |
171.430,00 |
171.430,00 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
|
|
|
|
|
Nilai ASB |
3.953.870,91 |
| 2020 | 27.1.1.5.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 2 m | titik | 3.953.870,91 | (belum diset) | |
106 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.4 |
Pemasangan Lampu HPS 150 W - 1 Phase - Ornamen 2 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.16 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 3 m |
1 |
M |
1.764.659,81 |
1.764.659,81 |
24.2.2.25 |
- |
Pemasangan Ornamen Lampu PJU panjang 2m |
1 |
buah |
171.430,00 |
171.430,00 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.43 |
- |
Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
2.642.075,00 |
2.642.075,00 |
|
|
|
|
|
Nilai ASB |
6.376.970,91 |
| 2020 | 27.1.1.4.1 | Pemasangan Lampu HPS 150 W - 1 Phase - Ornamen 2 m | titik | 6.376.970,91 | (belum diset) | |
107 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.2 |
Pemasangan Lampu HPS 150 W - 1 Phase - Ornamen 1.5 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.15 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 2,5 m |
1 |
M |
1.471.809,81 |
1.471.809,81 |
24.2.2.24 |
- |
Pemasangan Ornamen Lampu PJU panjang 1,5 m |
1 |
buah |
171.430,00 |
171.430,00 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.43 |
- |
Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
2.642.075,00 |
2.642.075,00 |
|
|
|
|
|
Nilai ASB |
6.084.120,91 |
| 2020 | 27.1.1.2.1 | Pemasangan Lampu HPS 150 W - 1 Phase - Ornamen 1.5 m | titik | 6.084.120,91 | (belum diset) | |
108 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.1 |
Pemasangan PJU dengan kabel udara |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
2 |
unit |
218.975,00 |
437.950,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.55 |
- |
Pemasangan Tiang Oktagonal 9 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
6.994.859,00 |
6.994.859,00 |
|
|
|
|
|
Nilai ASB |
25.860.633,31 |
| 2020 | 27.1.1.1.1 | Pemasangan PJU dengan kabel udara | titik | 25.860.633,31 | (belum diset) | |
109 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.2.1.3 |
Pembuatan Rangka Atap Baja |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.0481 |
M1 |
113.758,40 |
5.471,78 |
24.1.1.11 |
- |
Pembongkaran Rangka Atap dan Penutup Dipakai Kembali |
0.2625 |
M2 |
32.228,00 |
8.459,85 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.0093 |
M3 |
118.270,00 |
1.099,91 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
0.0721 |
titik |
232.058,65 |
16.731,43 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.0023 |
M3 |
568.825,93 |
1.308,30 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.0409 |
M3 |
1.943.652,28 |
79.495,38 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
3.6457 |
kilogram |
23.886,93 |
87.084,58 |
24.1.4.51 |
- |
Bekisting untuk Sloof |
0.176 |
M2 |
436.108,01 |
76.755,01 |
24.1.4.52 |
- |
Bekisting untuk Kolom |
0.0865 |
M2 |
641.808,00 |
55.516,39 |
24.1.5.1 |
- |
Pekerjaan Perakitan dan Pemasangan Struktur Besi/Baja Profil |
7.1304 |
kilogram |
40.446,50 |
288.399,73 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.0865 |
M2 |
99.416,60 |
8.599,54 |
24.1.6.25 |
- |
Pemasangan acian |
0.0865 |
M2 |
60.790,00 |
5.258,33 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
0.3462 |
M |
40.230,50 |
13.927,80 |
24.1.7.8 |
- |
Pengecatan Besi |
1.3488 |
M2 |
53.052,00 |
71.556,54 |
24.1.7.10 |
- |
Pengecatan Dasar Meni Besi |
1.2623 |
M2 |
50.512,00 |
63.761,30 |
24.1.9.26 |
- |
Pemasangan Penutup Atap Galvalume |
1.625 |
M2 |
746.496,53 |
1.213.056,86 |
24.1.9.29 |
- |
Pemasangan Jurai Genteng Galvalume Tebal 4 mm (m) |
0.2885 |
M1 |
1.159.312,51 |
334.461,67 |
|
|
|
|
|
Nilai ASB |
2.330.944,38 |
| 2020 | 26.2.1.3.1 | Pembuatan Rangka Atap Baja | M2 | 2.330.944,38 | (belum diset) | |
110 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.2.1.2 |
Pembangunan Rumah Pompa Tipe 2 |
|
|
Titik |
|
|
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
68.2 |
M2 |
25.420,00 |
1.733.643,95 |
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
181.2 |
M2 |
8.975,66 |
1.626.389,52 |
24.1.1.13 |
- |
Pekerjaan Pembongkaran Dinding Tembok Bata |
2.88 |
M3 |
1.074.247,97 |
3.093.834,29 |
24.2.5.25 |
- |
Pembongkaran Beton |
2 |
M3 |
546.486,93 |
1.092.973,87 |
|
|
|
|
|
Nilai ASB |
7.546.841,62 |
| 2020 | 26.2.1.2.1 | Pembangunan Rumah Pompa Tipe 2 | unit | 7.546.841,62 | (belum diset) | |
111 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.2.1.1 |
Pembangunan Rumah Pompa Tipe 1 |
|
|
Titik |
|
|
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
68.2 |
M2 |
25.420,00 |
1.733.643,95 |
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
68.2 |
M2 |
8.975,66 |
612.139,97 |
24.1.1.13 |
- |
Pekerjaan Pembongkaran Dinding Tembok Bata |
0.36 |
M3 |
1.074.247,97 |
386.729,29 |
24.2.5.25 |
- |
Pembongkaran Beton |
1.2 |
M3 |
546.486,93 |
655.784,35 |
|
|
|
|
|
Nilai ASB |
3.388.297,55 |
| 2020 | 26.2.1.1.1 | Pembangunan Rumah Pompa Tipe 1 | unit | 3.388.297,55 | (belum diset) | |
112 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.26 |
Pemasangan Wall Paper |
|
|
Titik |
|
|
24.1.8.18 |
- |
Pemasangan wallpaper lebar 50 cm |
1 |
M2 |
631.231,51 |
631.231,51 |
|
|
|
|
|
Nilai ASB |
631.231,51 |
| 2020 | 26.1.1.26.1 | Pemasangan Wall Paper | M2 | 631.231,51 | (belum diset) | |
113 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.25 |
Pemeliharaan Gedung Bertingkat |
|
|
Titik |
|
|
24.1.7.11 |
- |
Pengecatan Dinding Luar Lama Tanpa Plamir (sewarna) |
4 |
M2 |
46.036,44 |
184.145,76 |
24.1.8.5 |
- |
Pemasangan Lantai Keramik ukuran 40x40 cm |
0.25 |
M2 |
1.423.510,50 |
355.877,62 |
24.1.9.52 |
- |
Pemasangan Plafon Asbes Semen, tebal 4 mm |
0.125 |
M2 |
46.286,60 |
5.785,83 |
24.1.9.55 |
- |
Pemasangan Plafon Gypsum Board (120x240) 9 mm |
1 |
M2 |
62.325,80 |
62.325,80 |
|
|
|
|
|
Nilai ASB |
608.135,01 |
| 2020 | 26.1.1.25.1 | Pemeliharaan Gedung Bertingkat | M2 | 608.135,01 | (belum diset) | |
114 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.24 |
Pemeliharaan Gedung Tidak Bertingkat |
|
|
Titik |
|
|
24.1.7.11 |
- |
Pengecatan Dinding Luar Lama Tanpa Plamir (sewarna) |
3 |
M2 |
46.036,44 |
138.109,32 |
24.1.8.5 |
- |
Pemasangan Lantai Keramik ukuran 40x40 cm |
0.2 |
M2 |
1.423.510,50 |
284.702,10 |
24.1.9.55 |
- |
Pemasangan Plafon Gypsum Board (120x240) 9 mm |
1 |
M2 |
62.325,80 |
62.325,80 |
|
|
|
|
|
Nilai ASB |
485.137,22 |
| 2020 | 26.1.1.24.1 | Pemeliharaan Gedung Tidak Bertingkat | M2 | 485.137,22 | (belum diset) | |
115 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.20 |
Pengecatan Dinding Luar Baru |
|
|
Titik |
|
|
24.1.7.12 |
- |
Pengecatan Dinding Luar Baru |
1 |
M2 |
57.917,56 |
57.917,56 |
|
|
|
|
|
Nilai ASB |
57.917,56 |
| 2020 | 26.1.1.20.1 | Pengecatan Dinding Luar Baru | M2 | 57.917,56 | (belum diset) | |
116 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.19 |
Pengecatan Dinding Luar Lama Tanpa Plamir (Sewarna ) |
|
|
Titik |
|
|
24.1.7.11 |
- |
Pengecatan Dinding Luar Lama Tanpa Plamir (sewarna) |
1 |
M2 |
46.036,44 |
46.036,44 |
|
|
|
|
|
Nilai ASB |
46.036,44 |
| 2020 | 26.1.1.19.1 | Pengecatan Dinding Luar Lama Tanpa Plamir (Sewarna ) | M2 | 46.036,44 | (belum diset) | |
117 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.18 |
Pengecatan Dinding Dalam Baru |
|
|
Titik |
|
|
24.1.7.7 |
- |
Pengecatan Dinding Dalam Baru |
1 |
M2 |
45.835,85 |
45.835,85 |
|
|
|
|
|
Nilai ASB |
45.835,85 |
| 2020 | 26.1.1.18.1 | Pengecatan Dinding Dalam Baru | M2 | 45.835,85 | (belum diset) | |
118 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.17 |
Pengecatan Dinding Dalam Lama Tanpa Plamir (Sewarna ) |
|
|
Titik |
|
|
24.1.7.11 |
- |
Pengecatan Dinding Luar Lama Tanpa Plamir (sewarna) |
1 |
M2 |
46.036,44 |
46.036,44 |
|
|
|
|
|
Nilai ASB |
46.036,44 |
| 2020 | 26.1.1.17.1 | Pengecatan Dinding Dalam Lama Tanpa Plamir (Sewarna ) | M2 | 46.036,44 | (belum diset) | |
119 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.16 |
Rehabilitasi Kerusakan Berat Bangunan Tipe C (65%) |
|
|
Titik |
|
|
26.1.1.3.1 |
- |
Pembangunan Gedung Type C |
0.65 |
M2 |
6.359.708,15 |
4.133.810,15 |
|
|
|
|
|
Nilai ASB |
4.133.810,15 |
| 2020 | 26.1.1.16.1 | Rehabilitasi Kerusakan Berat Bangunan Tipe C (65%) | M2 | 4.133.810,15 | (belum diset) | |
120 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.15 |
Rehabilitasi Kerusakan Sedang Bangunan Tipe C (45%) |
|
|
Titik |
|
|
26.1.1.3.1 |
- |
Pembangunan Gedung Type C |
0.45 |
M2 |
6.359.708,15 |
2.861.868,59 |
|
|
|
|
|
Nilai ASB |
2.861.868,59 |
| 2020 | 26.1.1.15.1 | Rehabilitasi Kerusakan Sedang Bangunan Tipe C (45%) | M2 | 2.861.868,59 | (belum diset) | |