81 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.2.1.5 |
Pemeliharaan Air Mancur |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2020 | 27.2.1.5.1 | Pemeliharaan Air Mancur | M2 | 0,00 | (belum diset) | |
82 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.2.1.4 |
PEMBUATAN TAMAN TYPE C |
|
|
Titik |
|
|
24.1.6.8 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata |
0.05 |
M2 |
150.726,50 |
7.536,33 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.32 |
M2 |
99.416,60 |
31.813,31 |
|
|
|
|
|
Nilai ASB |
39.349,64 |
| 2020 | 27.2.1.4.1 | PEMBUATAN TAMAN TYPE C | M2 | 39.349,64 | (belum diset) | |
83 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.2.1.3 |
PEMBUATAN TAMAN TYPE B |
|
|
Titik |
|
|
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.025 |
M3 |
471.628,02 |
11.790,70 |
24.1.6.8 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata |
0.05 |
M2 |
150.726,50 |
7.536,33 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.32 |
M2 |
99.416,60 |
31.813,31 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
0.25 |
M2 |
116.890,00 |
29.222,50 |
|
|
|
|
|
Nilai ASB |
80.362,84 |
| 2020 | 27.2.1.3.1 | PEMBUATAN TAMAN TYPE B | M2 | 80.362,84 | (belum diset) | |
84 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.2.1.2 |
PEMBUATAN TAMAN TYPE A |
|
|
Titik |
|
|
24.1.2.4 |
- |
Penggalian Tanah Cadas/Rabat sedalam s.d. 1 m |
0.25 |
M3 |
238.608,00 |
59.652,00 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.025 |
M3 |
471.628,02 |
11.790,70 |
24.1.6.8 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata |
0.05 |
M2 |
150.726,50 |
7.536,33 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.32 |
M2 |
99.416,60 |
31.813,31 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
0.25 |
M2 |
116.890,00 |
29.222,50 |
117.1.1.1.4.12 |
- |
Tanah Humus |
0.1156 |
M3 |
266.800,00 |
30.842,08 |
117.1.1.8.3.158 |
- |
Ekor Tupai |
2.2 |
Pohon |
40.100,00 |
88.220,00 |
117.1.1.8.3.162 |
- |
Flamboyan (2 - 3 m) |
0.01 |
Pohon |
667.000,00 |
6.670,00 |
117.1.1.8.3.209 |
- |
Lili Paris |
8.75 |
Polibeg |
6.700,00 |
58.625,00 |
117.1.1.8.3.283 |
- |
Pupuk kandang |
0.0375 |
Sak |
33.400,00 |
1.252,50 |
117.1.1.8.3.308 |
- |
Rumput Gajah Mini Varigata |
0.4 |
M2 |
13.400,00 |
5.360,00 |
|
|
|
|
|
Nilai ASB |
330.984,42 |
| 2020 | 27.2.1.2.1 | PEMBUATAN TAMAN TYPE A | M2 | 330.984,42 | (belum diset) | |
85 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.2.1.1 |
Rotonde |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2020 | 27.2.1.1.1 | Rotonde | M2 | 0,00 | (belum diset) | |
86 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.155 |
Pemasangan PJU dengan kabel tanah dan Lampu LED |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.47 |
- |
Pemasangan Lampu Jalan Raya LED |
2 |
unit |
218.975,00 |
437.950,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
5.692.159,00 |
5.692.159,00 |
|
|
|
|
|
Nilai ASB |
24.557.933,31 |
| 2020 | 27.1.1.155.1 | Pemasangan PJU dengan kabel tanah dan Lampu LED | titik | 24.557.933,31 | (belum diset) | |
87 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.154 |
Pemasangan PJU dengan kabel tanah |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
5.692.159,00 |
5.692.159,00 |
|
|
|
|
|
Nilai ASB |
24.119.983,31 |
| 2020 | 27.1.1.154.1 | Pemasangan PJU dengan kabel tanah | titik | 24.119.983,31 | (belum diset) | |
88 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.152 |
Pemasangan Tiang Dekoratif Cab 2 |
|
|
Titik |
|
|
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
117.1.3.8.1.26 |
- |
Kabel NYFGbY 3 x 4 mm |
50 |
meter |
49.400,00 |
2.470.000,00 |
|
|
|
|
|
Nilai ASB |
19.291.510,91 |
| 2020 | 27.1.1.152.1 | Pemasangan Tiang Dekoratif Cab 2 | titik | 19.291.510,91 | (belum diset) | |
89 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.151 |
Pemasangan Tiang Dekoratif Cab 1 |
|
|
Titik |
|
|
24.2.2.22 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m |
1 |
M |
10.550.159,81 |
10.550.159,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
117.1.3.8.1.26 |
- |
Kabel NYFGbY 3 x 4 mm |
50 |
meter |
49.400,00 |
2.470.000,00 |
|
|
|
|
|
Nilai ASB |
14.313.060,91 |
| 2020 | 27.1.1.151.1 | Pemasangan Tiang Dekoratif Cab 1 | titik | 14.313.060,91 | (belum diset) | |
90 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.149 |
Pemasangan Tiang PJU cab 2 |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
2 |
unit |
218.975,00 |
437.950,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
5.692.159,00 |
5.692.159,00 |
|
|
|
|
|
Nilai ASB |
24.557.933,31 |
| 2020 | 27.1.1.149.1 | Pemasangan Tiang PJU cab 2 | titik | 24.557.933,31 | (belum diset) | |
91 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.148 |
Pemasangan Tiang PJU cab 1 |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.22 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m |
18 |
M |
10.550.159,81 |
189.902.876,58 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
1 |
unit |
288.360,00 |
288.360,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.55 |
- |
Pemasangan Tiang Oktagonal 9 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
6.994.859,00 |
6.994.859,00 |
|
|
|
|
|
Nilai ASB |
200.275.449,08 |
| 2020 | 27.1.1.148.1 | Pemasangan Tiang PJU cab 1 | titik | 200.275.449,08 | (belum diset) | |
92 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.146 |
Pemasangan Lampu HPS 150 W - 1 Phase - Tiang Tanam Oktagonal |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.43 |
- |
Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
2.642.075,00 |
2.642.075,00 |
24.2.2.51 |
- |
Pemasangan Tiang Oktagonal 5 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
3.655.059,00 |
3.655.059,00 |
117.1.3.8.1.47 |
- |
Kabel NYM 3 x 2,5 mm |
0.14 |
Roll |
858.100,00 |
120.134,00 |
|
|
|
|
|
Nilai ASB |
8.216.074,10 |
| 2020 | 27.1.1.146.1 | Pemasangan Lampu HPS 150 W - 1 Phase - Tiang Tanam Oktagonal | titik | 8.216.074,10 | (belum diset) | |
93 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.33 |
Pemasangan Lampu HPS 150 W - 1 Phase - Tiang Bulat |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.18 |
- |
Intalasi 1 Titik Lampu PJU (Tarikan Udara) 7,5 m |
1 |
M |
4.400.309,81 |
4.400.309,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.43 |
- |
Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
2.642.075,00 |
2.642.075,00 |
24.2.2.48 |
- |
Pondasi Biasa PJU |
1 |
titik |
925.947,82 |
925.947,82 |
24.2.2.57 |
- |
Pemasangan Tiang Cabang 1 Biasa 5m |
1 |
unit |
1.783.559,00 |
1.783.559,00 |
|
|
|
|
|
Nilai ASB |
11.550.697,72 |
| 2020 | 27.1.1.33.1 | Pemasangan Lampu HPS 150 W - 1 Phase - Tiang Bulat | titik | 11.550.697,72 | (belum diset) | |
94 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.25 |
Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.45 |
- |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
2 |
unit |
218.975,00 |
437.950,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
5.692.159,00 |
5.692.159,00 |
|
|
|
|
|
Nilai ASB |
24.557.933,31 |
| 2020 | 27.1.1.25.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) | titik | 24.557.933,31 | (belum diset) | |
95 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.24 |
Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
2 |
unit |
218.975,00 |
437.950,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
5.692.159,00 |
5.692.159,00 |
|
|
|
|
|
Nilai ASB |
24.557.933,31 |
| 2020 | 27.1.1.24.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) | titik | 24.557.933,31 | (belum diset) | |
96 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.22 |
Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.22 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m |
1 |
M |
10.550.159,81 |
10.550.159,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.45 |
- |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.55 |
- |
Pemasangan Tiang Oktagonal 9 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
6.994.859,00 |
6.994.859,00 |
|
|
|
|
|
Nilai ASB |
20.663.208,31 |
| 2020 | 27.1.1.22.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) | titik | 20.663.208,31 | (belum diset) | |
97 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.21 |
Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.22 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m |
1 |
M |
10.550.159,81 |
10.550.159,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.55 |
- |
Pemasangan Tiang Oktagonal 9 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
6.994.859,00 |
6.994.859,00 |
|
|
|
|
|
Nilai ASB |
20.663.208,31 |
| 2020 | 27.1.1.21.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) | titik | 20.663.208,31 | (belum diset) | |
98 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.19 |
Pemasangan Lampu HPS 150 W - 1 Phase - Tiang cab 1-7 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.20 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 11,5 m |
1 |
M |
6.743.109,81 |
6.743.109,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.43 |
- |
Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
2.642.075,00 |
2.642.075,00 |
24.2.2.48 |
- |
Pondasi Biasa PJU |
1 |
titik |
925.947,82 |
925.947,82 |
24.2.2.53 |
- |
Pemasangan Tiang Oktagonal 7 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
4.389.559,00 |
4.389.559,00 |
|
|
|
|
|
Nilai ASB |
16.499.497,72 |
| 2020 | 27.1.1.19.1 | Pemasangan Lampu HPS 150 W - 1 Phase - Tiang cab 1-7 m (OKTAGONAL) | titik | 16.499.497,72 | (belum diset) | |
99 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.17 |
Pemasangan Lampu HPS 150 W - 1 Phase - Tiang cab 1-5 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.18 |
- |
Intalasi 1 Titik Lampu PJU (Tarikan Udara) 7,5 m |
1 |
M |
4.400.309,81 |
4.400.309,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.43 |
- |
Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
2.642.075,00 |
2.642.075,00 |
24.2.2.48 |
- |
Pondasi Biasa PJU |
1 |
titik |
925.947,82 |
925.947,82 |
24.2.2.51 |
- |
Pemasangan Tiang Oktagonal 5 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
3.655.059,00 |
3.655.059,00 |
|
|
|
|
|
Nilai ASB |
13.422.197,72 |
| 2020 | 27.1.1.17.1 | Pemasangan Lampu HPS 150 W - 1 Phase - Tiang cab 1-5 m (OKTAGONAL) | titik | 13.422.197,72 | (belum diset) | |
100 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.15 |
Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 6 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.18 |
- |
Intalasi 1 Titik Lampu PJU (Tarikan Udara) 7,5 m |
1 |
M |
4.400.309,81 |
4.400.309,81 |
24.2.2.27 |
- |
Pemasangan Ornamen Lampu PJU panjang 6m |
1 |
buah |
2.381.047,52 |
2.381.047,52 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.45 |
- |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
|
|
|
|
|
Nilai ASB |
8.799.138,43 |
| 2020 | 27.1.1.15.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 6 m | lipat | 8.799.138,43 | (belum diset) | |