41 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.9 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.36 |
M2 |
2.011.392,60 |
724.101,36 |
|
|
|
|
|
Nilai ASB |
724.101,36 |
| 2020 | 28.4.1.9.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade | unit | 724.101,36 | (belum diset) | |
42 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.8 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.54 |
M2 |
2.011.392,60 |
1.086.152,05 |
|
|
|
|
|
Nilai ASB |
1.086.152,05 |
| 2020 | 28.4.1.8.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan | unit | 1.086.152,05 | (belum diset) | |
43 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.7 |
Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.825 |
M2 |
2.011.392,60 |
1.659.398,87 |
|
|
|
|
|
Nilai ASB |
1.659.398,87 |
| 2020 | 28.4.1.7.1 | Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan | unit | 1.659.398,87 | (belum diset) | |
44 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.6 |
Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.54 |
M2 |
2.011.392,60 |
1.086.152,05 |
|
|
|
|
|
Nilai ASB |
1.086.152,05 |
| 2020 | 28.4.1.6.1 | Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan | unit | 1.086.152,05 | (belum diset) | |
45 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.5 |
Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.825 |
M2 |
2.011.392,60 |
1.659.398,87 |
|
|
|
|
|
Nilai ASB |
1.659.398,87 |
| 2020 | 28.4.1.5.1 | Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan | unit | 1.659.398,87 | (belum diset) | |
46 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.4 |
Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan dan Umpak Beton |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.12 |
M3 |
1.943.652,28 |
233.238,27 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.54 |
M2 |
2.011.392,60 |
1.086.152,05 |
|
|
|
|
|
Nilai ASB |
1.319.390,31 |
| 2020 | 28.4.1.4.1 | Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan dan Umpak Beton | unit | 1.319.390,31 | (belum diset) | |
47 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.3 |
Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan dan Umpak Beton |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.12 |
M3 |
1.943.652,28 |
233.238,27 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.825 |
M2 |
2.011.392,60 |
1.659.398,87 |
|
|
|
|
|
Nilai ASB |
1.892.637,14 |
| 2020 | 28.4.1.3.1 | Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan dan Umpak Beton | unit | 1.892.637,14 | (belum diset) | |
48 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.2 |
Rambu Lalu Lintas (60 cm) Engineering Grade papan tambahan dan umpak beton |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.12 |
M3 |
1.943.652,28 |
233.238,27 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.54 |
M2 |
2.011.392,60 |
1.086.152,05 |
|
|
|
|
|
Nilai ASB |
1.319.390,31 |
| 2020 | 28.4.1.2.1 | Rambu Lalu Lintas (60 cm) Engineering Grade papan tambahan dan umpak beton | unit | 1.319.390,31 | (belum diset) | |
49 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.1 |
Rambu Lalu Lintas (75 cm) Engineering Grade papan tambahan dan umpak beton |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.12 |
M3 |
1.943.652,28 |
233.238,27 |
|
|
|
|
|
Nilai ASB |
233.238,27 |
| 2020 | 28.4.1.1.1 | Rambu Lalu Lintas (75 cm) Engineering Grade papan tambahan dan umpak beton | unit | 233.238,27 | (belum diset) | |
50 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.10 |
Sumur Buis Beton diameter 80 cm |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
1 |
M3 |
157.417,60 |
157.417,60 |
24.1.2.17 |
- |
Pengangkutan Tanah dari Lubang Galian yg dalamnya > 1 m |
1 |
M3 |
40.285,00 |
40.285,00 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.01 |
M3 |
1.943.652,28 |
19.436,52 |
117.1.1.1.22.468 |
- |
Riol Beton |
2 |
buah |
748.400,00 |
1.496.800,00 |
|
|
|
|
|
Nilai ASB |
1.713.939,12 |
| 2020 | 28.3.1.10.1 | Sumur Buis Beton diameter 80 cm | titik | 1.713.939,12 | (belum diset) | |
51 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.9 |
Pembangunan Lapangan Olahraga Tenis dan Pagar |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.1 |
M1 |
113.758,40 |
11.375,84 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.002 |
M3 |
85.740,00 |
171,48 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0007 |
M3 |
471.628,02 |
330,14 |
24.1.3.13 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 5 Ps) |
0.06 |
M3 |
1.324.364,43 |
79.461,86 |
24.1.3.15 |
- |
Pemasangan Batu Kali Kosongan (aanstamping) |
0.02 |
M3 |
837.121,22 |
16.742,42 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.0006 |
M3 |
568.825,93 |
341,30 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1 |
M3 |
1.943.652,28 |
194.365,23 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.005 |
M3 |
6.383.804,41 |
31.919,02 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.28 |
M2 |
99.416,60 |
27.836,65 |
24.1.6.25 |
- |
Pemasangan acian |
0.28 |
M2 |
60.790,00 |
17.021,20 |
24.1.8.19 |
- |
Pembuatan/Pemasangan Hardener Floor (Granit Trase Corak) |
1 |
M2 |
75.971,20 |
75.971,20 |
24.1.10.37 |
- |
Pemasangan Kawat Harmonika |
0.76 |
M2 |
155.487,14 |
118.170,23 |
24.1.11.2 |
- |
Pemasangan Titik Lampu Gedung |
0.01 |
titik |
164.792,00 |
1.647,92 |
117.1.1.1.16.14 |
- |
Plat Strip uk 3x 40 mm |
0.71 |
M |
55.800,00 |
39.618,00 |
|
|
|
|
|
Nilai ASB |
627.682,49 |
| 2020 | 28.3.1.9.1 | Pembangunan Lapangan Olahraga Tenis dan Pagar | M2 | 627.682,49 | (belum diset) | |
52 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.8 |
Pembangunan Lapangan Olahraga Sepak Bola Konvensional ukuran 50m x 100m |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.0044 |
M1 |
113.758,40 |
500,54 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.0108 |
M3 |
118.270,00 |
1.277,32 |
24.1.2.13 |
- |
Penimbunan tanah, Perataan dan Pemadatan menggunakan Alat Berat |
0.1 |
M3 |
427.689,23 |
42.768,92 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.3 |
M3 |
281.590,28 |
84.477,09 |
24.1.3.15 |
- |
Pemasangan Batu Kali Kosongan (aanstamping) |
0.0107 |
M3 |
837.121,22 |
8.957,20 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.0035 |
M3 |
1.943.652,28 |
6.802,78 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.062 |
M2 |
99.416,60 |
6.163,83 |
24.1.6.25 |
- |
Pemasangan acian |
0.0621 |
M2 |
60.790,00 |
3.775,06 |
24.1.7.8 |
- |
Pengecatan Besi |
0.002 |
M2 |
53.052,00 |
106,10 |
24.1.7.10 |
- |
Pengecatan Dasar Meni Besi |
0.002 |
M2 |
50.512,00 |
101,02 |
24.2.2.70 |
- |
Pengecatan dengan Cat Road Line |
0.005 |
M2 |
87.985,00 |
439,92 |
24.2.6.9 |
- |
Menanam Rumput Bermuda |
1 |
M2 |
38.618,00 |
38.618,00 |
117.1.1.1.5.48 |
- |
Batu Pecah 5-7 cm |
0.0081 |
M3 |
466.900,00 |
3.781,89 |
117.2.2.6.1.18 |
- |
Pipa PVC uk.4 inchi Pj.4 m |
0.08 |
batang |
93.400,00 |
7.472,00 |
|
|
|
|
|
Nilai ASB |
217.951,68 |
| 2020 | 28.3.1.8.1 | Pembangunan Lapangan Olahraga Sepak Bola Konvensional ukuran 50m x 100m | M2 | 217.951,68 | (belum diset) | |
53 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.7 |
Pembangunan Lapangan Olahraga Futsal Kecil (28x18m) |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.039 |
M3 |
118.270,00 |
4.612,53 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.0068 |
M3 |
85.740,00 |
583,03 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0062 |
M3 |
471.628,02 |
2.924,09 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.06 |
M3 |
281.590,28 |
16.895,42 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.0012 |
M3 |
568.825,93 |
682,59 |
24.1.4.11 |
- |
Beton mutu f'c 12,2 Mpa (K-150), slump (12±2) cm. w/c=0,72, dengan Molen |
0.0008 |
M3 |
1.763.189,02 |
1.410,55 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1737 |
M3 |
1.943.652,28 |
337.612,41 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.0074 |
M3 |
6.383.804,41 |
47.240,15 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.011 |
M3 |
7.944.915,55 |
87.394,07 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.07 |
M2 |
99.416,60 |
6.959,16 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
0.21 |
M |
40.230,50 |
8.448,40 |
24.1.7.4 |
- |
Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) |
0.026 |
M2 |
82.723,10 |
2.150,80 |
24.1.7.8 |
- |
Pengecatan Besi |
0.93 |
M2 |
53.052,00 |
49.338,36 |
24.1.8.19 |
- |
Pembuatan/Pemasangan Hardener Floor (Granit Trase Corak) |
0.5 |
M2 |
75.971,20 |
37.985,60 |
24.1.10.23 |
- |
Pemasangan Engsel Kuningan Untuk Pintu |
0.012 |
stel |
124.695,44 |
1.496,35 |
24.1.10.37 |
- |
Pemasangan Kawat Harmonika |
0.551 |
M2 |
155.487,14 |
85.673,42 |
24.1.11.2 |
- |
Pemasangan Titik Lampu Gedung |
0.002 |
titik |
164.792,00 |
329,58 |
24.1.12.26 |
- |
Pemasangan Pipa Pe 12 mm |
1.052 |
meter |
467.208,02 |
491.502,86 |
24.2.2.70 |
- |
Pengecatan dengan Cat Road Line |
0.794 |
M2 |
87.985,00 |
69.860,09 |
117.1.1.1.16.14 |
- |
Plat Strip uk 3x 40 mm |
0.052 |
M |
55.800,00 |
2.901,60 |
|
|
|
|
|
Nilai ASB |
1.256.001,07 |
| 2020 | 28.3.1.7.1 | Pembangunan Lapangan Olahraga Futsal Kecil (28x18m) | M2 | 1.256.001,07 | (belum diset) | |
54 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.6 |
PEKERJAAN PEMBUATAN LAPANGAN BULUTANGKIS (16,4X8,1m) |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.0903 |
M1 |
113.758,40 |
10.272,38 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
0.1075 |
M2 |
12.710,00 |
1.366,33 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.0094 |
M3 |
118.270,00 |
1.111,74 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.0901 |
M3 |
85.740,00 |
7.725,17 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.0021 |
M3 |
1.943.652,28 |
4.081,67 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.0027 |
M3 |
6.383.804,41 |
17.236,27 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.0159 |
M3 |
7.944.915,55 |
126.324,16 |
24.1.4.74 |
- |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
0.0252 |
M3 |
8.648.594,42 |
217.944,58 |
24.1.6.3 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata |
0.0011 |
M2 |
320.687,30 |
352,76 |
24.1.6.7 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1/2 bata |
0.012 |
M2 |
155.098,30 |
1.861,18 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.0354 |
M2 |
99.416,60 |
3.519,35 |
24.1.6.25 |
- |
Pemasangan acian |
0.0354 |
M2 |
60.790,00 |
2.151,97 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
0.2 |
M |
40.230,50 |
8.046,10 |
24.1.7.8 |
- |
Pengecatan Besi |
0.1489 |
M2 |
53.052,00 |
7.899,44 |
24.1.7.12 |
- |
Pengecatan Dinding Luar Baru |
0.0354 |
M2 |
57.917,56 |
2.050,28 |
24.1.8.19 |
- |
Pembuatan/Pemasangan Hardener Floor (Granit Trase Corak) |
0.1 |
M2 |
75.971,20 |
7.597,12 |
24.1.11.1 |
- |
Pemasangan Titik Stop Kontak Gedung |
0.0151 |
titik |
164.792,00 |
2.488,36 |
24.1.14.5 |
- |
Pekerjaan Besi Pipa Galvanis 2 " (Medium) |
0.1152 |
meter |
59.416,00 |
6.844,72 |
|
|
|
|
|
Nilai ASB |
428.873,58 |
| 2020 | 28.3.1.6.1 | PEKERJAAN PEMBUATAN LAPANGAN BULUTANGKIS (16,4X8,1m) | M2 | 428.873,58 | (belum diset) | |
55 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.5 |
Pembangunan Lapangan Olahraga Futsal Besar (45x28m) |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.0208 |
M3 |
118.270,00 |
2.460,02 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.0041 |
M3 |
85.740,00 |
351,53 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0023 |
M3 |
471.628,02 |
1.084,74 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.067 |
M3 |
281.590,28 |
18.866,55 |
24.1.4.11 |
- |
Beton mutu f'c 12,2 Mpa (K-150), slump (12±2) cm. w/c=0,72, dengan Molen |
0.0013 |
M3 |
1.763.189,02 |
2.292,15 |
24.1.4.15 |
- |
Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, dengan Molen |
0.0007 |
M3 |
1.830.876,03 |
1.281,61 |
24.1.4.27 |
- |
Beton mutu f'c 21,7 Mpa (K-250), slump (12±2) cm. w/c=0,56, dengan Molen |
0.174 |
M3 |
1.974.996,64 |
343.649,40 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.0044 |
M3 |
6.383.804,41 |
28.088,74 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.0078 |
M3 |
7.944.915,55 |
61.970,34 |
24.1.4.74 |
- |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
0.2366 |
M3 |
8.648.594,42 |
2.046.257,41 |
24.1.8.19 |
- |
Pembuatan/Pemasangan Hardener Floor (Granit Trase Corak) |
0.5 |
M2 |
75.971,20 |
37.985,60 |
24.1.10.23 |
- |
Pemasangan Engsel Kuningan Untuk Pintu |
0.005 |
stel |
124.695,44 |
623,48 |
24.1.10.37 |
- |
Pemasangan Kawat Harmonika |
0.347 |
M2 |
155.487,14 |
53.954,04 |
24.1.11.2 |
- |
Pemasangan Titik Lampu Gedung |
0.0024 |
titik |
164.792,00 |
395,50 |
24.1.12.26 |
- |
Pemasangan Pipa Pe 12 mm |
0.486 |
meter |
467.208,02 |
227.063,10 |
24.2.2.70 |
- |
Pengecatan dengan Cat Road Line |
0.02 |
M2 |
87.985,00 |
1.759,70 |
|
|
|
|
|
Nilai ASB |
2.828.083,91 |
| 2020 | 28.3.1.5.1 | Pembangunan Lapangan Olahraga Futsal Besar (45x28m) | M2 | 2.828.083,91 | (belum diset) | |
56 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.4 |
PEKERJAAN PEMBUATAN LAPANGAN BOLA VOLLEY (11X22m) |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.0496 |
M1 |
113.758,40 |
5.642,42 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
0.0041 |
M2 |
12.710,00 |
52,11 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.003 |
M3 |
118.270,00 |
354,81 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.0007 |
M3 |
85.740,00 |
60,02 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0001 |
M3 |
471.628,02 |
47,16 |
24.1.4.3 |
- |
Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, dengan Molen |
0.0001 |
M3 |
1.689.836,57 |
168,98 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.0001 |
M3 |
1.943.652,28 |
194,37 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.001 |
M3 |
6.383.804,41 |
6.383,80 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.0095 |
M3 |
7.944.915,55 |
75.476,70 |
24.1.4.74 |
- |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
0.03 |
M3 |
8.648.594,42 |
259.457,83 |
24.1.7.8 |
- |
Pengecatan Besi |
0.0331 |
M2 |
53.052,00 |
1.756,02 |
24.1.7.13 |
- |
Pekerjaan Teer Kayu |
0.06 |
M2 |
43.183,30 |
2.591,00 |
24.1.8.19 |
- |
Pembuatan/Pemasangan Hardener Floor (Granit Trase Corak) |
0.2 |
M2 |
75.971,20 |
15.194,24 |
24.1.11.1 |
- |
Pemasangan Titik Stop Kontak Gedung |
0.0083 |
titik |
164.792,00 |
1.367,77 |
24.1.14.5 |
- |
Pekerjaan Besi Pipa Galvanis 2 " (Medium) |
0.0165 |
meter |
59.416,00 |
980,36 |
24.1.14.7 |
- |
Pekerjaan Besi Pipa Galvanis 3 " (Medium) |
0.0562 |
meter |
89.124,00 |
5.008,77 |
|
|
|
|
|
Nilai ASB |
374.736,36 |
| 2020 | 28.3.1.4.1 | PEKERJAAN PEMBUATAN LAPANGAN BOLA VOLLEY (11X22m) | M2 | 374.736,36 | (belum diset) | |
57 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.3 |
PEKERJAAN PEMBUATAN LAPANGAN BOLA BASKET (39 x 17,6 m2) |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.0057 |
M1 |
113.758,40 |
648,42 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.0003 |
M3 |
118.270,00 |
35,48 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
4.73825E-5 |
M3 |
471.628,02 |
22,35 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
1.88551E-5 |
M3 |
1.943.652,28 |
36,65 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.0001 |
M3 |
6.383.804,41 |
638,38 |
24.1.4.74 |
- |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
0.0248 |
M3 |
8.648.594,42 |
214.485,15 |
24.1.7.8 |
- |
Pengecatan Besi |
0.0141 |
M2 |
53.052,00 |
748,03 |
24.1.7.13 |
- |
Pekerjaan Teer Kayu |
2.2589 |
M2 |
43.183,30 |
97.546,75 |
24.1.8.19 |
- |
Pembuatan/Pemasangan Hardener Floor (Granit Trase Corak) |
0.0488 |
M2 |
75.971,20 |
3.707,39 |
|
|
|
|
|
Nilai ASB |
330.578,61 |
| 2020 | 28.3.1.3.1 | PEKERJAAN PEMBUATAN LAPANGAN BOLA BASKET (39 x 17,6 m2) | M2 | 330.578,61 | (belum diset) | |
58 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.2 |
Pembangunan Lapangan Olahraga Lompat Jauh |
|
|
Titik |
|
|
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
1 |
M2 |
8.975,66 |
8.975,66 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.4165 |
M3 |
118.270,00 |
49.259,46 |
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.1004 |
M3 |
157.417,60 |
15.804,73 |
24.1.6.8 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata |
0.3256 |
M2 |
150.726,50 |
49.076,55 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.1302 |
M2 |
99.416,60 |
12.944,04 |
24.1.6.25 |
- |
Pemasangan acian |
0.1302 |
M2 |
60.790,00 |
7.914,86 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
0.6512 |
M |
40.230,50 |
26.198,10 |
24.2.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
1.1124 |
M |
127.630,24 |
141.975,89 |
117.1.1.1.4.23 |
- |
Pasir Halus 1 |
0.3354 |
M3 |
258.200,00 |
86.600,28 |
132.3.2.13.1.96 |
- |
Air Kerja |
100 |
liter |
36,00 |
3.600,00 |
|
|
|
|
|
Nilai ASB |
415.059,56 |
| 2020 | 28.3.1.2.1 | Pembangunan Lapangan Olahraga Lompat Jauh | M2 | 415.059,56 | (belum diset) | |
59 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.1 |
Pembangunan Wall Climbing |
|
|
Titik |
|
|
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
1 |
M2 |
8.975,66 |
8.975,66 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.125 |
M3 |
118.270,00 |
14.783,75 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.025 |
M3 |
471.628,02 |
11.790,70 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
0.1111 |
titik |
232.058,65 |
25.781,72 |
24.1.3.25 |
- |
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) |
0.0157 |
M3 |
1.054.854,31 |
16.561,21 |
24.1.4.15 |
- |
Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, dengan Molen |
0.0125 |
M3 |
1.830.876,03 |
22.885,95 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.1191 |
M3 |
6.383.804,41 |
760.311,09 |
24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
0.0068 |
M3 |
9.262.468,50 |
62.984,79 |
24.1.7.8 |
- |
Pengecatan Besi |
3.547 |
M2 |
53.052,00 |
188.175,44 |
24.1.7.10 |
- |
Pengecatan Dasar Meni Besi |
3.547 |
M2 |
50.512,00 |
179.166,06 |
132.3.2.13.1.96 |
- |
Air Kerja |
450 |
liter |
36,00 |
16.200,00 |
|
|
|
|
|
Nilai ASB |
1.320.326,37 |
| 2020 | 28.3.1.1.1 | Pembangunan Wall Climbing | M2 | 1.320.326,37 | (belum diset) | |
60 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.2.1.2 |
Tandon Air Kebakaran |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.2875 |
M1 |
113.758,40 |
32.705,54 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
3.065 |
M3 |
118.270,00 |
362.497,56 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.536 |
M3 |
85.740,00 |
45.956,64 |
24.1.2.17 |
- |
Pengangkutan Tanah dari Lubang Galian yg dalamnya > 1 m |
1.2861 |
M3 |
40.285,00 |
51.810,54 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.122 |
M3 |
281.590,28 |
34.354,01 |
24.1.3.3 |
- |
Pemasangan Turap Bambu tinggi 2,75 m |
3.015 |
M1 |
565.992,31 |
1.706.466,86 |
24.1.4.3 |
- |
Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, dengan Molen |
0.0657 |
M3 |
1.689.836,57 |
111.022,27 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
2.428 |
kilogram |
23.886,93 |
57.997,46 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.6918 |
M3 |
7.944.915,55 |
5.496.292,56 |
24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
0.14 |
M3 |
9.262.468,50 |
1.296.745,60 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.89 |
M2 |
99.416,60 |
88.480,77 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
4.11 |
M |
40.230,50 |
165.347,36 |
24.1.12.13 |
- |
Pemasangan Saluran Pipa diameter 4'' |
0.07 |
meter |
68.233,88 |
4.776,37 |
24.2.2.70 |
- |
Pengecatan dengan Cat Road Line |
0.057 |
M2 |
87.985,00 |
5.015,15 |
|
|
|
|
|
Nilai ASB |
9.459.468,69 |
| 2020 | 28.2.1.2.1 | Tandon Air Kebakaran | M3 | 9.459.468,69 | (belum diset) | |