21 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.29 |
Pengadaan Cermin Tikungan |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.24 |
M3 |
1.943.652,28 |
466.476,54 |
117.2.2.1.2.7 |
- |
Pipa Galvanis 6 m 2" |
3 |
meter |
76.100,00 |
228.300,00 |
123.1.1.1.1.6 |
- |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
- |
Pekerja Terlatih |
1.5 |
OH |
150.800,00 |
226.200,00 |
123.1.1.1.1.23 |
- |
Tukang |
0.75 |
OH |
177.500,00 |
133.125,00 |
|
|
|
|
|
Nilai ASB |
1.064.441,54 |
| 2020 | 28.4.1.29.1 | Pengadaan Cermin Tikungan | unit | 1.064.441,54 | (belum diset) | |
22 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.28 |
Pengecatan Marka Jalan dengan Coldplastik |
|
|
Titik |
|
|
24.2.5.46 |
- |
Marka Jalan Bukan Termoplastic |
1.1 |
M2 |
157.206,82 |
172.927,51 |
|
|
|
|
|
Nilai ASB |
172.927,51 |
| 2020 | 28.4.1.28.1 | Pengecatan Marka Jalan dengan Coldplastik | M2 | 172.927,51 | (belum diset) | |
23 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.27 |
Pengecatan Marka Profil dengan Thermoplastik |
|
|
Titik |
|
|
24.2.5.45 |
- |
Marka Jalan Termoplastik |
1.5 |
M2 |
162.471,82 |
243.707,73 |
|
|
|
|
|
Nilai ASB |
243.707,73 |
| 2020 | 28.4.1.27.1 | Pengecatan Marka Profil dengan Thermoplastik | M2 | 243.707,73 | (belum diset) | |
24 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.26 |
Pengecatan Marka Pita Penggaduh dengan Thermoplastik tebal 10 mm |
|
|
Titik |
|
|
24.2.5.45 |
- |
Marka Jalan Termoplastik |
5 |
M2 |
162.471,82 |
812.359,11 |
|
|
|
|
|
Nilai ASB |
812.359,11 |
| 2020 | 28.4.1.26.1 | Pengecatan Marka Pita Penggaduh dengan Thermoplastik tebal 10 mm | M2 | 812.359,11 | (belum diset) | |
25 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.25 |
Pengecatan Marka dengan Thermoplastik tebal 2 mm |
|
|
Titik |
|
|
24.2.5.45 |
- |
Marka Jalan Termoplastik |
1 |
M2 |
162.471,82 |
162.471,82 |
|
|
|
|
|
Nilai ASB |
162.471,82 |
| 2020 | 28.4.1.25.1 | Pengecatan Marka dengan Thermoplastik tebal 2 mm | M2 | 162.471,82 | (belum diset) | |
26 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.24 |
Pemasangan Paku Jalan Solar dengan LED Light dan Capasitor |
|
|
Titik |
|
|
123.1.1.1.1.6 |
- |
Mandor |
0.083 |
OH |
206.800,00 |
17.164,40 |
123.1.1.1.1.14 |
- |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
|
|
|
|
|
Nilai ASB |
167.964,40 |
| 2020 | 28.4.1.24.1 | Pemasangan Paku Jalan Solar dengan LED Light dan Capasitor | unit | 167.964,40 | (belum diset) | |
27 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.23 |
Pemasangan Paku Jalan |
|
|
Titik |
|
|
123.1.1.1.1.6 |
- |
Mandor |
0.083 |
OH |
206.800,00 |
17.164,40 |
123.1.1.1.1.14 |
- |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
|
|
|
|
|
Nilai ASB |
167.964,40 |
| 2020 | 28.4.1.23.1 | Pemasangan Paku Jalan | unit | 167.964,40 | (belum diset) | |
28 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.22 |
Pembuatan Palang Kuda - kuda untuk Car Free Day |
|
|
Titik |
|
|
24.1.7.4 |
- |
Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) |
2.969 |
M2 |
82.723,10 |
245.604,89 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.587 |
M2 |
2.011.392,60 |
1.180.687,48 |
117.1.1.1.22.120 |
- |
Besi Hollow 40 x 40 x 1.10 mm |
39.6 |
batang |
124.100,00 |
4.914.359,81 |
117.1.1.1.22.140 |
- |
Besi SIKU 40 x 6m x 4mm |
7.25 |
batang |
180.100,00 |
1.305.725,00 |
123.1.1.1.1.6 |
- |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
- |
Pekerja Terlatih |
0.56 |
OH |
150.800,00 |
84.448,00 |
123.1.1.1.1.23 |
- |
Tukang |
0.56 |
OH |
177.500,00 |
99.400,00 |
123.2.2.1.3.4 |
- |
Alat Bantu Penerangan Jalan Umum (PJU) |
3 |
jam |
9.800,00 |
29.400,00 |
|
|
|
|
|
Nilai ASB |
7.869.965,19 |
| 2020 | 28.4.1.22.1 | Pembuatan Palang Kuda - kuda untuk Car Free Day | unit | 7.869.965,19 | (belum diset) | |
29 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.21 |
Pembuatan Palang Kuda dr Pipa Besi Hitam Dia. 2.5" |
|
|
Titik |
|
|
24.1.7.4 |
- |
Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) |
1.9792 |
M2 |
82.723,10 |
163.725,56 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.27 |
M2 |
2.011.392,60 |
543.076,02 |
123.1.1.1.1.6 |
- |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
- |
Pekerja Terlatih |
0.56 |
OH |
150.800,00 |
84.448,00 |
123.1.1.1.1.23 |
- |
Tukang |
0.56 |
OH |
177.500,00 |
99.400,00 |
123.2.2.1.3.4 |
- |
Alat Bantu Penerangan Jalan Umum (PJU) |
6 |
jam |
9.800,00 |
58.800,00 |
|
|
|
|
|
Nilai ASB |
959.789,59 |
| 2020 | 28.4.1.21.1 | Pembuatan Palang Kuda dr Pipa Besi Hitam Dia. 2.5" | unit | 959.789,59 | (belum diset) | |
30 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.20 |
Pemasangan Tiang Rambu Ganda |
|
|
Titik |
|
|
117.1.1.1.22.139 |
- |
Besi SIKU 30 x 6 m x 3 mm |
0.75 |
batang |
60.100,00 |
45.075,00 |
117.1.1.1.22.221 |
- |
Mur Baut untuk panel Rambu |
0.5 |
Kg |
8.700,00 |
4.350,00 |
117.2.2.1.2.7 |
- |
Pipa Galvanis 6 m 2" |
3 |
meter |
76.100,00 |
228.300,00 |
123.1.1.1.1.6 |
- |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
- |
Pekerja Terlatih |
1.5 |
OH |
150.800,00 |
226.200,00 |
|
|
|
|
|
Nilai ASB |
514.265,00 |
| 2020 | 28.4.1.20.1 | Pemasangan Tiang Rambu Ganda | unit | 514.265,00 | (belum diset) | |
31 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.19 |
Pemasangan Rambu Elektronik Solar Cell |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.12 |
M3 |
1.943.652,28 |
233.238,27 |
|
|
|
|
|
Nilai ASB |
233.238,27 |
| 2020 | 28.4.1.19.1 | Pemasangan Rambu Elektronik Solar Cell | unit | 233.238,27 | (belum diset) | |
32 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.18 |
Pemasangan penggantian pipa rambu lalu lintas (menggunakan flenders) |
|
|
Titik |
|
|
117.1.1.1.16.14 |
- |
Plat Strip uk 3x 40 mm |
1.5 |
M |
55.800,00 |
83.700,00 |
117.1.1.1.22.221 |
- |
Mur Baut untuk panel Rambu |
0.5 |
Kg |
8.700,00 |
4.350,00 |
117.2.2.1.2.7 |
- |
Pipa Galvanis 6 m 2" |
3 |
meter |
76.100,00 |
228.300,00 |
123.1.1.1.1.6 |
- |
Mandor |
0.085 |
OH |
206.800,00 |
17.578,00 |
123.1.1.1.1.14 |
- |
Pekerja Terlatih |
0.85 |
OH |
150.800,00 |
128.180,00 |
|
|
|
|
|
Nilai ASB |
462.108,00 |
| 2020 | 28.4.1.18.1 | Pemasangan penggantian pipa rambu lalu lintas (menggunakan flenders) | unit | 462.108,00 | (belum diset) | |
33 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.17 |
Pemasangan Papan Petunjuk |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.35 |
M3 |
1.943.652,28 |
680.278,29 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.72 |
M2 |
2.011.392,60 |
1.448.202,73 |
|
|
|
|
|
Nilai ASB |
2.128.481,01 |
| 2020 | 28.4.1.17.1 | Pemasangan Papan Petunjuk | unit | 2.128.481,01 | (belum diset) | |
34 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.16 |
Pemasangan Papan Peringatan / Himbauan |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.35 |
M3 |
1.943.652,28 |
680.278,29 |
|
|
|
|
|
Nilai ASB |
680.278,29 |
| 2020 | 28.4.1.16.1 | Pemasangan Papan Peringatan / Himbauan | unit | 680.278,29 | (belum diset) | |
35 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.15 |
Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.075 |
M3 |
1.943.652,28 |
145.773,93 |
|
|
|
|
|
Nilai ASB |
145.773,93 |
| 2020 | 28.4.1.15.1 | Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap | unit | 145.773,93 | (belum diset) | |
36 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.14 |
Pemasangan Rambu Lalu Lintas (90 cm) Engineering Grade serta Papan Tambahan dengan Tiang Overhead Oktagonal |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.945 |
M3 |
157.417,60 |
148.759,63 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
1 |
titik |
232.058,65 |
232.058,65 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.8 |
M3 |
1.943.652,28 |
1.554.921,85 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
58 |
kilogram |
23.886,93 |
1.385.441,90 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
2.47 |
M2 |
2.011.392,60 |
4.968.139,77 |
24.2.2.51 |
- |
Pemasangan Tiang Oktagonal 5 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
3.655.059,00 |
3.655.059,00 |
|
|
|
|
|
Nilai ASB |
11.944.380,80 |
| 2020 | 28.4.1.14.1 | Pemasangan Rambu Lalu Lintas (90 cm) Engineering Grade serta Papan Tambahan dengan Tiang Overhead Oktagonal | unit | 11.944.380,80 | (belum diset) | |
37 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.13 |
Pemasangan RPPJ Oktagonal Kantilever 1,8 x 1,2 m dengan scotch light engineering grade perismatik |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.945 |
M3 |
157.417,60 |
148.759,63 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
1 |
titik |
232.058,65 |
232.058,65 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.8 |
M3 |
1.943.652,28 |
1.554.921,85 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
58 |
kilogram |
23.886,93 |
1.385.441,90 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
4.32 |
M2 |
2.011.392,60 |
8.689.216,37 |
|
|
|
|
|
Nilai ASB |
12.010.398,39 |
| 2020 | 28.4.1.13.1 | Pemasangan RPPJ Oktagonal Kantilever 1,8 x 1,2 m dengan scotch light engineering grade perismatik | unit | 12.010.398,39 | (belum diset) | |
38 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.12 |
Pemasangan Rambu RPPJ 2 m x 3 m |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
6 |
M2 |
2.011.392,60 |
12.068.355,59 |
|
|
|
|
|
Nilai ASB |
12.068.355,59 |
| 2020 | 28.4.1.12.1 | Pemasangan Rambu RPPJ 2 m x 3 m | unit | 12.068.355,59 | (belum diset) | |
39 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.11 |
Pemasangan Tiang dan rambu RPPJ 2 m x 3 m |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
1.47 |
M3 |
157.417,60 |
231.403,88 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
1 |
titik |
232.058,65 |
232.058,65 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.85 |
M3 |
1.943.652,28 |
1.652.104,48 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
68.82 |
kilogram |
23.886,93 |
1.643.898,47 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
6 |
M2 |
2.011.392,60 |
12.068.355,59 |
24.2.2.53 |
- |
Pemasangan Tiang Oktagonal 7 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
4.389.559,00 |
4.389.559,00 |
|
|
|
|
|
Nilai ASB |
20.217.380,06 |
| 2020 | 28.4.1.11.1 | Pemasangan Tiang dan rambu RPPJ 2 m x 3 m | unit | 20.217.380,06 | (belum diset) | |
40 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.10 |
Klem Galvanis Rambu Include Mur Baut |
|
|
Titik |
|
|
24.1.5.2 |
- |
Pekerjaan Pengelasan dengan las listrik |
6.8 |
cm |
37.096,20 |
252.254,16 |
|
|
|
|
|
Nilai ASB |
252.254,16 |
| 2020 | 28.4.1.10.1 | Klem Galvanis Rambu Include Mur Baut | unit | 252.254,16 | (belum diset) | |