261 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.19 |
Pemasangan Rambu Elektronik Solar Cell |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.19.1 | Pemasangan Rambu Elektronik Solar Cell | unit | 0,00 | (belum diset) | |
262 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.18 |
Pemasangan penggantian pipa rambu lalu lintas (menggunakan flenders) |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.18.1 | Pemasangan penggantian pipa rambu lalu lintas (menggunakan flenders) | unit | 0,00 | (belum diset) | |
263 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.17 |
Pemasangan Papan Petunjuk |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.17.1 | Pemasangan Papan Petunjuk | unit | 0,00 | (belum diset) | |
264 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.16 |
Pemasangan Papan Peringatan / Himbauan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.16.1 | Pemasangan Papan Peringatan / Himbauan | unit | 0,00 | (belum diset) | |
265 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.15 |
Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.15.1 | Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap | unit | 0,00 | (belum diset) | |
266 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.14 |
Pemasangan Rambu Lalu Lintas (90 cm) Engineering Grade serta Papan Tambahan dengan Tiang Overhead Oktagonal |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.14.1 | Pemasangan Rambu Lalu Lintas (90 cm) Engineering Grade serta Papan Tambahan dengan Tiang Overhead Oktagonal | unit | 0,00 | (belum diset) | |
267 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.13 |
Pemasangan RPPJ Oktagonal Kantilever 1,8 x 1,2 m dengan scotch light engineering grade perismatik |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.13.1 | Pemasangan RPPJ Oktagonal Kantilever 1,8 x 1,2 m dengan scotch light engineering grade perismatik | unit | 0,00 | (belum diset) | |
268 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.12 |
Pemasangan Rambu RPPJ 2 m x 3 m |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.12.1 | Pemasangan Rambu RPPJ 2 m x 3 m | unit | 0,00 | (belum diset) | |
269 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.11 |
Pemasangan Tiang dan rambu RPPJ 2 m x 3 m |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.11.1 | Pemasangan Tiang dan rambu RPPJ 2 m x 3 m | unit | 0,00 | (belum diset) | |
270 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.10 |
Klem Galvanis Rambu Include Mur Baut |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.10.1 | Klem Galvanis Rambu Include Mur Baut | unit | 0,00 | (belum diset) | |
271 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.9 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.9.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade | unit | 0,00 | (belum diset) | |
272 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.8 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.8.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
273 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.7 |
Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.7.1 | Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
274 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.6 |
Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.6.1 | Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
275 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.5 |
Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.5.1 | Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
276 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.4 |
Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan dan Umpak Beton |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.4.1 | Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan dan Umpak Beton | unit | 0,00 | (belum diset) | |
277 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.3 |
Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan dan Umpak Beton |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.3.1 | Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan dan Umpak Beton | unit | 0,00 | (belum diset) | |
278 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.2 |
Rambu Lalu Lintas (60 cm) Engineering Grade papan tambahan dan umpak beton |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.2.1 | Rambu Lalu Lintas (60 cm) Engineering Grade papan tambahan dan umpak beton | unit | 0,00 | (belum diset) | |
279 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.1 |
Rambu Lalu Lintas (75 cm) Engineering Grade papan tambahan dan umpak beton |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.1.1 | Rambu Lalu Lintas (75 cm) Engineering Grade papan tambahan dan umpak beton | unit | 0,00 | (belum diset) | |
280 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.10 |
Sumur Buis Beton diameter 80 cm |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.3.1.10.1 | Sumur Buis Beton diameter 80 cm | 500 gr | 0,00 | (belum diset) | |