101 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 6 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
6 |
M2 |
640.512,49 |
3.843.074,93 |
|
|
|
|
|
Nilai ASB |
3.843.074,93 |
| 2020 | 25.1.1.2.9 | Pemeliharaan Jalan Overlay Lebar 6 m | M1 | 3.843.074,93 | (belum diset) | |
102 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.12 |
Rehabilitasi Kerusakan Sedang Bangunan Tipe B (45%) |
|
|
Titik |
|
|
26.1.1.2.1 |
- |
Pembangunan Gedung Type B |
0.45 |
M2 |
8.259.969,82 |
3.716.986,32 |
|
|
|
|
|
Nilai ASB |
3.716.986,32 |
| 2020 | 26.1.1.12.1 | Rehabilitasi Kerusakan Sedang Bangunan Tipe B (45%) | M2 | 3.716.986,32 | (belum diset) | |
103 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.3.2.5 |
Saluran Batu kali 40/60 + Tutup Pelat (2 sisi) |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
2.2 |
M3 |
118.270,00 |
260.194,01 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.4 |
M3 |
471.628,02 |
188.651,21 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
2.2 |
M3 |
166.100,00 |
365.420,01 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
1.2 |
M3 |
1.390.242,02 |
1.668.290,49 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.2 |
M3 |
1.943.652,28 |
388.730,46 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
3.6 |
M2 |
99.416,60 |
357.899,76 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
4 |
M |
40.230,50 |
160.922,00 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
2 |
meter |
105.933,20 |
211.866,40 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
4 |
buah |
22.941,10 |
91.764,40 |
|
|
|
|
|
Nilai ASB |
3.693.738,73 |
| 2020 | 25.3.2.5.1 | Saluran Batu kali 40/60 + Tutup Pelat (2 sisi) | M | 3.693.738,73 | (belum diset) | |
104 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.3.2.3 |
Saluran Batu kali 80/100 + Tutup Pelat (1 sisi) |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
3.1 |
M3 |
118.270,00 |
366.636,99 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.3 |
M3 |
85.740,00 |
25.722,00 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.6 |
M3 |
471.628,02 |
282.976,82 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
2.8 |
M3 |
166.100,00 |
465.079,99 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
1.3 |
M3 |
1.390.242,02 |
1.807.314,56 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1 |
M3 |
1.943.652,28 |
194.365,23 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
2.6 |
M2 |
99.416,60 |
258.483,16 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
2 |
M |
40.230,50 |
80.461,00 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
1 |
meter |
105.933,20 |
105.933,20 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
2 |
buah |
22.941,10 |
45.882,20 |
|
|
|
|
|
Nilai ASB |
3.632.855,14 |
| 2020 | 25.3.2.3.1 | Saluran Batu kali 80/100 + Tutup Pelat (1 sisi) | M | 3.632.855,14 | (belum diset) | |
105 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 5,5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
5.5 |
M2 |
640.512,49 |
3.522.818,68 |
|
|
|
|
|
Nilai ASB |
3.522.818,68 |
| 2020 | 25.1.1.2.8 | Pemeliharaan Jalan Overlay Lebar 5,5 m | M1 | 3.522.818,68 | (belum diset) | |
106 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.8 |
Pekerjaan Pengadaan dan Pemasangan Warning Light |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.55 |
M3 |
118.270,00 |
65.048,50 |
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.76 |
M3 |
157.417,60 |
119.637,37 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
1 |
titik |
193.385,05 |
193.385,05 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.9925 |
M3 |
1.943.652,28 |
1.929.074,90 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
33.96 |
kilogram |
23.046,93 |
782.673,70 |
24.1.7.8 |
- |
Pengecatan Besi |
0.35 |
M2 |
53.052,00 |
18.568,20 |
24.1.14.8 |
- |
Pekerjaan Besi Pipa Galvanis 4 " (Medium) |
3 |
meter |
118.832,00 |
356.495,99 |
|
|
|
|
|
Nilai ASB |
3.464.883,71 |
| 2020 | 28.4.2.8.1 | Pekerjaan Pengadaan dan Pemasangan Warning Light | unit | 3.464.883,71 | (belum diset) | |
107 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.2.1.1 |
Pembangunan Rumah Pompa Tipe 1 |
|
|
Titik |
|
|
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
68.2 |
M2 |
25.420,00 |
1.733.643,95 |
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
68.2 |
M2 |
8.975,66 |
612.139,97 |
24.1.1.13 |
- |
Pekerjaan Pembongkaran Dinding Tembok Bata |
0.36 |
M3 |
1.074.247,97 |
386.729,29 |
24.2.5.25 |
- |
Pembongkaran Beton |
1.2 |
M3 |
546.486,93 |
655.784,35 |
|
|
|
|
|
Nilai ASB |
3.388.297,55 |
| 2020 | 26.2.1.1.1 | Pembangunan Rumah Pompa Tipe 1 | unit | 3.388.297,55 | (belum diset) | |
108 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.2.1 |
Pemeliharaan Rumah Kompos (Penggantian dengan atap baja ringan) |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.01 |
M1 |
113.758,40 |
1.137,58 |
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
1 |
M2 |
25.420,00 |
25.420,00 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.375 |
M3 |
118.270,00 |
44.351,25 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.23 |
M3 |
281.590,28 |
64.765,77 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
33.33 |
kilogram |
23.886,93 |
796.151,40 |
24.1.5.1 |
- |
Pekerjaan Perakitan dan Pemasangan Struktur Besi/Baja Profil |
13 |
kilogram |
40.446,50 |
525.804,50 |
24.1.5.2 |
- |
Pekerjaan Pengelasan dengan las listrik |
41 |
cm |
37.096,20 |
1.520.944,17 |
24.1.5.11 |
- |
Pekerjaan Pemasangan Baut Mur Baja |
1.33 |
kilogram |
34.200,60 |
45.486,80 |
24.1.6.3 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata |
0.083 |
M2 |
320.687,30 |
26.617,05 |
24.1.7.8 |
- |
Pengecatan Besi |
1.83 |
M2 |
53.052,00 |
97.085,16 |
24.1.9.17 |
- |
Pemasang rangka atap Galvalume 0.75 |
0.35 |
M2 |
81.466,00 |
28.513,10 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
1.104 |
M2 |
116.890,00 |
129.046,56 |
24.2.1.9 |
- |
Stopper/Uskup tebal 8 cm abu - abu |
0.67 |
M |
53.100,90 |
35.577,60 |
|
|
|
|
|
Nilai ASB |
3.340.900,93 |
| 2020 | 25.1.2.1.4 | Pemeliharaan Rumah Kompos (Penggantian dengan atap baja ringan) | M2 | 3.340.900,93 | (belum diset) | |
109 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
5 |
M2 |
640.512,49 |
3.202.562,44 |
|
|
|
|
|
Nilai ASB |
3.202.562,44 |
| 2020 | 25.1.1.2.7 | Pemeliharaan Jalan Overlay Lebar 5 m | M1 | 3.202.562,44 | (belum diset) | |
110 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.3.11 |
Konstruksi Jalan Paving Baru Lebar 4 m (tbl. 6 cm) dengan Saluran lebar 60 cm + plat |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
2 |
M3 |
118.270,00 |
236.540,00 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.1 |
M3 |
85.740,00 |
8.574,00 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.4 |
M3 |
471.628,02 |
188.651,21 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.9 |
M3 |
166.100,00 |
315.590,00 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.9 |
M3 |
1.390.242,02 |
1.251.217,78 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1 |
M3 |
1.943.652,28 |
194.365,23 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
2.2 |
M2 |
99.416,60 |
218.716,53 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
2 |
M |
40.230,50 |
80.461,00 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
1 |
meter |
105.933,20 |
105.933,20 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
2 |
buah |
22.941,10 |
45.882,20 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
4 |
M2 |
116.890,00 |
467.560,00 |
|
|
|
|
|
Nilai ASB |
3.113.491,15 |
| 2020 | 25.1.3.11.1 | Konstruksi Jalan Paving Baru Lebar 4 m (tbl. 6 cm) dengan Saluran lebar 60 cm + plat | M | 3.113.491,15 | (belum diset) | |
111 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.2.2.11 |
Pembangunan Jogging Track |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.1835 |
M1 |
113.758,40 |
20.874,67 |
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
1.5 |
M2 |
25.420,00 |
38.130,00 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
0.5113 |
titik |
232.058,65 |
118.651,59 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.034 |
M3 |
6.383.804,41 |
217.049,36 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.05 |
M3 |
7.944.915,55 |
397.245,78 |
24.1.5.2 |
- |
Pekerjaan Pengelasan dengan las listrik |
0.34 |
cm |
37.096,20 |
12.612,71 |
24.1.7.5 |
- |
Pengecatan bidang kayu dengan cat vernis |
1.855 |
M2 |
74.482,60 |
138.165,22 |
24.1.7.8 |
- |
Pengecatan Besi |
0.07 |
M2 |
53.052,00 |
3.713,64 |
24.1.9.2 |
- |
Pemasangan Konstruksi Kuda-Kuda Konvensional Kayu Kelas II bentang 6 m. |
0.06 |
M3 |
19.216.990,36 |
1.153.019,40 |
24.1.9.54 |
- |
Pemasangan Plafon Triplek ukuran (120x240) cm |
1 |
M2 |
67.403,96 |
67.403,96 |
24.1.10.39 |
- |
Lantai Papan / Balok kayu Kamper per m2 |
1.15 |
M2 |
794.508,24 |
913.684,46 |
|
|
|
|
|
Nilai ASB |
3.080.550,79 |
| 2020 | 27.2.2.11.1 | Pembangunan Jogging Track | M2 | 3.080.550,79 | (belum diset) | |
112 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.3.10 |
Konstruksi Jalan Paving Baru Lebar 3 m (tbl. 6 cm) dengan Saluran lebar 60 cm + plat |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
2 |
M3 |
118.270,00 |
236.540,00 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.1 |
M3 |
85.740,00 |
8.574,00 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.4 |
M3 |
471.628,02 |
188.651,21 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.9 |
M3 |
166.100,00 |
315.590,00 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.9 |
M3 |
1.390.242,02 |
1.251.217,78 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1 |
M3 |
1.943.652,28 |
194.365,23 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
2.2 |
M2 |
99.416,60 |
218.716,53 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
2 |
M |
40.230,50 |
80.461,00 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
1 |
meter |
105.933,20 |
105.933,20 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
2 |
buah |
22.941,10 |
45.882,20 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
3 |
M2 |
116.890,00 |
350.670,00 |
|
|
|
|
|
Nilai ASB |
2.996.601,15 |
| 2020 | 25.1.3.10.1 | Konstruksi Jalan Paving Baru Lebar 3 m (tbl. 6 cm) dengan Saluran lebar 60 cm + plat | M | 2.996.601,15 | (belum diset) | |
113 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.2.1 |
Rigid Pavements Tipe A1 |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.75 |
M3 |
157.417,60 |
118.063,20 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0125 |
M3 |
471.628,02 |
5.895,35 |
24.1.2.14 |
- |
Penimbunan Sirtu dan Pemadatan menggunakan Alat Berat |
0.1 |
M3 |
605.591,02 |
60.559,10 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.1 |
M3 |
568.825,93 |
56.882,59 |
24.1.4.43 |
- |
Beton mutu f'c 31,2 Mpa (K-350), slump (12±2) cm. w/c=0,48, dengan Molen |
0.35 |
M3 |
2.201.588,97 |
770.556,13 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
2.19 |
kilogram |
23.886,93 |
52.312,38 |
24.1.4.54 |
- |
Bekisting untuk Lantai |
0.022 |
M2 |
748.608,00 |
16.469,38 |
24.1.6.6 |
- |
Dinding Batu Merah 1 Pc : 3 Pp tebal 1/2 bata |
1 |
M2 |
162.020,00 |
162.020,00 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
0.25 |
M2 |
116.890,00 |
29.222,50 |
24.2.1.6 |
- |
Kanstin BDCM 21.5 |
0.3333 |
M |
121.117,38 |
40.368,42 |
24.2.3.38 |
- |
Lapis Pondasi Aggregat Kelas A |
0.3 |
M3 |
908.635,51 |
272.590,67 |
24.2.3.39 |
- |
Lapis Pondasi Aggregat Kelas B |
0.4 |
M3 |
819.094,10 |
327.637,64 |
24.2.3.48 |
- |
Lapis Pondasi Aggregat Kelas C |
0.5 |
M3 |
737.720,79 |
368.860,39 |
24.2.3.83 |
- |
LasTon Lapis Aus (AC-WC) |
0.135 |
ton |
1.622.513,66 |
219.039,35 |
24.2.3.87 |
- |
LasTon Lapis Antara (AC-BC) |
0.09 |
ton |
1.502.092,25 |
135.188,31 |
24.2.3.97 |
- |
Lapis Pondasi/Perata Penetrasi Macadam |
0.05 |
M3 |
2.520.503,24 |
126.025,16 |
24.2.5.25 |
- |
Pembongkaran Beton |
0.35 |
M3 |
546.486,93 |
191.270,42 |
|
|
|
|
|
Nilai ASB |
2.952.961,00 |
| 2020 | 25.1.2.1.1 | Rigid Pavements Tipe A1 | M2 | 2.952.961,00 | (belum diset) | |
114 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 4,5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
4.5 |
M2 |
640.512,49 |
2.882.306,20 |
|
|
|
|
|
Nilai ASB |
2.882.306,20 |
| 2020 | 25.1.1.2.6 | Pemeliharaan Jalan Overlay Lebar 4,5 m | M1 | 2.882.306,20 | (belum diset) | |
115 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.15 |
Rehabilitasi Kerusakan Sedang Bangunan Tipe C (45%) |
|
|
Titik |
|
|
26.1.1.3.1 |
- |
Pembangunan Gedung Type C |
0.45 |
M2 |
6.359.708,15 |
2.861.868,59 |
|
|
|
|
|
Nilai ASB |
2.861.868,59 |
| 2020 | 26.1.1.15.1 | Rehabilitasi Kerusakan Sedang Bangunan Tipe C (45%) | M2 | 2.861.868,59 | (belum diset) | |
116 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.5 |
Pembangunan Lapangan Olahraga Futsal Besar (45x28m) |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.0208 |
M3 |
118.270,00 |
2.460,02 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.0041 |
M3 |
85.740,00 |
351,53 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0023 |
M3 |
471.628,02 |
1.084,74 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.067 |
M3 |
281.590,28 |
18.866,55 |
24.1.4.11 |
- |
Beton mutu f'c 12,2 Mpa (K-150), slump (12±2) cm. w/c=0,72, dengan Molen |
0.0013 |
M3 |
1.763.189,02 |
2.292,15 |
24.1.4.15 |
- |
Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, dengan Molen |
0.0007 |
M3 |
1.830.876,03 |
1.281,61 |
24.1.4.27 |
- |
Beton mutu f'c 21,7 Mpa (K-250), slump (12±2) cm. w/c=0,56, dengan Molen |
0.174 |
M3 |
1.974.996,64 |
343.649,40 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.0044 |
M3 |
6.383.804,41 |
28.088,74 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.0078 |
M3 |
7.944.915,55 |
61.970,34 |
24.1.4.74 |
- |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
0.2366 |
M3 |
8.648.594,42 |
2.046.257,41 |
24.1.8.19 |
- |
Pembuatan/Pemasangan Hardener Floor (Granit Trase Corak) |
0.5 |
M2 |
75.971,20 |
37.985,60 |
24.1.10.23 |
- |
Pemasangan Engsel Kuningan Untuk Pintu |
0.005 |
stel |
124.695,44 |
623,48 |
24.1.10.37 |
- |
Pemasangan Kawat Harmonika |
0.347 |
M2 |
155.487,14 |
53.954,04 |
24.1.11.2 |
- |
Pemasangan Titik Lampu Gedung |
0.0024 |
titik |
164.792,00 |
395,50 |
24.1.12.26 |
- |
Pemasangan Pipa Pe 12 mm |
0.486 |
meter |
467.208,02 |
227.063,10 |
24.2.2.70 |
- |
Pengecatan dengan Cat Road Line |
0.02 |
M2 |
87.985,00 |
1.759,70 |
|
|
|
|
|
Nilai ASB |
2.828.083,91 |
| 2020 | 28.3.1.5.1 | Pembangunan Lapangan Olahraga Futsal Besar (45x28m) | M2 | 2.828.083,91 | (belum diset) | |
117 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.2.1 |
Pembangunan Rumah Kompos Rangka Baja Ringan |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.01 |
M1 |
113.758,40 |
1.137,58 |
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
1 |
M2 |
25.420,00 |
25.420,00 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.375 |
M3 |
118.270,00 |
44.351,25 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.0588 |
M3 |
85.740,00 |
5.041,51 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.23 |
M3 |
281.590,28 |
64.765,77 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
0.1875 |
titik |
193.385,05 |
36.259,70 |
24.1.3.25 |
- |
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) |
0.012 |
M3 |
1.054.854,31 |
12.658,25 |
24.1.4.3 |
- |
Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, dengan Molen |
0.055 |
M3 |
1.689.836,57 |
92.941,01 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
33.33 |
kilogram |
23.886,93 |
796.151,40 |
24.1.4.51 |
- |
Bekisting untuk Sloof |
1.17 |
M2 |
436.108,01 |
510.246,35 |
24.1.5.1 |
- |
Pekerjaan Perakitan dan Pemasangan Struktur Besi/Baja Profil |
0.67 |
kilogram |
40.446,50 |
27.099,16 |
24.1.5.2 |
- |
Pekerjaan Pengelasan dengan las listrik |
2.4 |
cm |
37.096,20 |
89.030,88 |
24.1.5.8 |
- |
Perbaikan Sambungan (Baut, Cincin, Pasak, dll) |
0.271 |
kilogram |
36.633,00 |
9.927,54 |
24.1.5.9 |
- |
Perbaikan dan Penggantian Baja Struktural (profil) |
0.92 |
kilogram |
22.050,90 |
20.286,83 |
24.1.5.11 |
- |
Pekerjaan Pemasangan Baut Mur Baja |
1.33 |
kilogram |
34.200,60 |
45.486,80 |
24.1.6.3 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata |
0.083 |
M2 |
320.687,30 |
26.617,05 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
1.8 |
M2 |
99.416,60 |
178.949,88 |
24.1.6.25 |
- |
Pemasangan acian |
1.8 |
M2 |
60.790,00 |
109.422,00 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
1.42 |
M |
40.230,50 |
57.127,31 |
24.1.7.8 |
- |
Pengecatan Besi |
1.8 |
M2 |
53.052,00 |
95.493,60 |
24.1.7.10 |
- |
Pengecatan Dasar Meni Besi |
1.83 |
M2 |
50.512,00 |
92.436,96 |
24.1.9.17 |
- |
Pemasang rangka atap Galvalume 0.75 |
0.35 |
M2 |
81.466,00 |
28.513,10 |
24.1.10.37 |
- |
Pemasangan Kawat Harmonika |
1.17 |
M2 |
155.487,14 |
181.919,95 |
24.1.14.5 |
- |
Pekerjaan Besi Pipa Galvanis 2 " (Medium) |
0.146 |
meter |
59.416,00 |
8.674,74 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
1.104 |
M2 |
116.890,00 |
129.046,56 |
24.2.1.6 |
- |
Kanstin BDCM 21.5 |
0.42 |
M |
121.117,38 |
50.869,30 |
24.2.1.9 |
- |
Stopper/Uskup tebal 8 cm abu - abu |
0.67 |
M |
53.100,90 |
35.577,60 |
|
|
|
|
|
Nilai ASB |
2.775.452,06 |
| 2020 | 25.1.2.1.3 | Pembangunan Rumah Kompos Rangka Baja Ringan | M2 | 2.775.452,06 | (belum diset) | |
118 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.3 |
Pekerjaan Pembuatan Pondasi Traffic Light Pendirian Tiang dan Instalasi Kabel |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.46 |
M3 |
157.417,60 |
72.412,10 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
1 |
titik |
193.385,05 |
193.385,05 |
24.1.3.25 |
- |
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) |
0.19 |
M3 |
1.054.854,31 |
200.422,32 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.3 |
M3 |
1.943.652,28 |
583.095,71 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
21.96 |
kilogram |
23.046,93 |
506.110,55 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
17.53 |
kilogram |
23.886,93 |
418.737,89 |
24.1.9.40 |
- |
Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh |
1 |
M1 |
88.017,30 |
88.017,30 |
123.2.2.1.2.21 |
- |
Crane 40 Ton |
1.25 |
jam |
557.700,00 |
697.125,00 |
|
|
|
|
|
Nilai ASB |
2.759.305,91 |
| 2020 | 28.4.2.3.1 | Pekerjaan Pembuatan Pondasi Traffic Light Pendirian Tiang dan Instalasi Kabel | unit | 2.759.305,91 | (belum diset) | |
119 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.3.2.2 |
Saluran Batu kali 60/80 + Tutup Pelat (1 sisi) |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
2 |
M3 |
118.270,00 |
236.540,00 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.1 |
M3 |
85.740,00 |
8.574,00 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.4 |
M3 |
471.628,02 |
188.651,21 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.9 |
M3 |
166.100,00 |
315.590,00 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.9 |
M3 |
1.390.242,02 |
1.251.217,78 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1 |
M3 |
1.943.652,28 |
194.365,23 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
2.2 |
M2 |
99.416,60 |
218.716,53 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
2 |
M |
40.230,50 |
80.461,00 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
1 |
meter |
105.933,20 |
105.933,20 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
2 |
buah |
22.941,10 |
45.882,20 |
|
|
|
|
|
Nilai ASB |
2.645.931,15 |
| 2020 | 25.3.2.2.1 | Saluran Batu kali 60/80 + Tutup Pelat (1 sisi) | M | 2.645.931,15 | (belum diset) | |
120 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.4 |
Rehabilitasi Kerusakan Ringan Bangunan Tipe A (30%) |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.0852 |
M1 |
113.758,40 |
9.692,22 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.3095 |
M3 |
118.270,00 |
36.604,57 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.0977 |
M3 |
85.740,00 |
8.376,80 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0422 |
M3 |
471.628,02 |
19.902,70 |
24.1.3.13 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 5 Ps) |
0.0977 |
M3 |
1.324.364,43 |
129.390,40 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
0.01 |
titik |
193.385,05 |
1.933,85 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.0148 |
M3 |
568.825,93 |
8.418,62 |
24.1.4.3 |
- |
Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, dengan Molen |
0.0133 |
M3 |
1.689.836,57 |
22.474,83 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.0083 |
M3 |
1.943.652,28 |
16.132,31 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.0158 |
M3 |
6.383.804,41 |
100.864,10 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.0067 |
M3 |
7.944.915,55 |
53.230,93 |
24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
0.0121 |
M3 |
9.262.468,50 |
112.075,87 |
24.1.4.77 |
- |
Pekerjaan Kolom Praktis (11 x 11 cm) |
0.0972 |
M1 |
134.625,10 |
13.085,56 |
24.1.6.4 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1 bata |
0.9476 |
M2 |
310.998,21 |
294.701,90 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
1.8613 |
M2 |
99.416,60 |
185.044,12 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
0.222 |
M |
40.230,50 |
8.931,17 |
24.1.7.4 |
- |
Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) |
0.1176 |
M2 |
82.723,10 |
9.728,24 |
24.1.7.7 |
- |
Pengecatan Dinding Dalam Baru |
2.1891 |
M2 |
45.835,85 |
100.339,26 |
24.1.7.12 |
- |
Pengecatan Dinding Luar Baru |
0.2619 |
M2 |
57.917,56 |
15.168,61 |
24.1.8.2 |
- |
Pemasangan Lantai Keramik 20x20 cm |
0.0454 |
M2 |
486.460,50 |
22.085,31 |
24.1.8.3 |
- |
Pemasangan Lantai Keramik ukurana 20x25 cm |
0.058 |
M2 |
498.310,50 |
28.902,01 |
24.1.8.19 |
- |
Pembuatan/Pemasangan Hardener Floor (Granit Trase Corak) |
0.2761 |
M2 |
75.971,20 |
20.975,65 |
24.1.9.13 |
- |
Pekerjaan Konstruksi Atap Kuda-Kuda/Gording Baja WF |
12.7112 |
kilogram |
44.850,60 |
570.104,92 |
24.1.9.17 |
- |
Pemasang rangka atap Galvalume 0.75 |
0.003 |
M2 |
81.466,00 |
244,40 |
24.1.9.26 |
- |
Pemasangan Penutup Atap Galvalume |
0.4873 |
M2 |
746.496,53 |
363.767,76 |
24.1.9.29 |
- |
Pemasangan Jurai Genteng Galvalume Tebal 4 mm (m) |
0.0204 |
M1 |
1.159.312,51 |
23.649,98 |
24.1.9.31 |
- |
Pemasangan Listplank Kayu Kelas II |
0.0005 |
M1 |
215.764,84 |
107,88 |
24.1.9.57 |
- |
Pemasangan List plafond Gypsum Profil 4 " |
0.4061 |
M1 |
18.304,80 |
7.433,58 |
24.1.9.63 |
- |
Pemasangan Plafon Kalsiboard Rangka Aluminium |
0.3617 |
M2 |
906.665,19 |
327.940,80 |
24.1.10.10 |
- |
Daun Pintu Panil Kayu Kelas II |
0.0318 |
M2 |
1.348.926,99 |
42.895,88 |
24.1.10.15 |
- |
Pemasangan Kaca Mati Rayban tebal 5 mm |
0.0127 |
M2 |
384.815,45 |
4.887,16 |
24.1.10.20 |
- |
Pemasangan Kunci Tanam Besar 2x Putar kuningan |
0.0228 |
buah |
187.054,00 |
4.264,83 |
24.1.10.23 |
- |
Pemasangan Engsel Kuningan Untuk Pintu |
0.0456 |
stel |
124.695,44 |
5.686,11 |
24.1.10.29 |
- |
Pemasangan Hak Angin (Sikutan) |
0.0144 |
stel |
64.714,00 |
931,88 |
24.1.10.40 |
- |
Pemasangan Daun Pintu PVC |
0.0086 |
buah |
4.879.270,01 |
41.961,72 |
24.1.11.1 |
- |
Pemasangan Titik Stop Kontak Gedung |
0.018 |
titik |
164.792,00 |
2.966,26 |
24.1.11.2 |
- |
Pemasangan Titik Lampu Gedung |
0.036 |
titik |
164.792,00 |
5.932,51 |
24.2.3.17 |
- |
Pasangan Batu tanpa Adukan (Aanstamping) |
0.0355 |
M3 |
624.945,01 |
22.185,55 |
|
|
|
|
|
Nilai ASB |
2.643.020,26 |
| 2020 | 26.1.1.4.1 | Rehabilitasi Kerusakan Ringan Bangunan Tipe A (30%) | M2 | 2.643.020,26 | (belum diset) | |