21 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.24 |
Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
2 |
unit |
218.975,00 |
437.950,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
5.692.159,00 |
5.692.159,00 |
|
|
|
|
|
Nilai ASB |
24.557.933,31 |
| 2020 | 27.1.1.24.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) | titik | 24.557.933,31 | (belum diset) | |
22 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.25 |
Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.45 |
- |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
2 |
unit |
218.975,00 |
437.950,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
5.692.159,00 |
5.692.159,00 |
|
|
|
|
|
Nilai ASB |
24.557.933,31 |
| 2020 | 27.1.1.25.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) | titik | 24.557.933,31 | (belum diset) | |
23 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.149 |
Pemasangan Tiang PJU cab 2 |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
2 |
unit |
218.975,00 |
437.950,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
5.692.159,00 |
5.692.159,00 |
|
|
|
|
|
Nilai ASB |
24.557.933,31 |
| 2020 | 27.1.1.149.1 | Pemasangan Tiang PJU cab 2 | titik | 24.557.933,31 | (belum diset) | |
24 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.155 |
Pemasangan PJU dengan kabel tanah dan Lampu LED |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.47 |
- |
Pemasangan Lampu Jalan Raya LED |
2 |
unit |
218.975,00 |
437.950,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
5.692.159,00 |
5.692.159,00 |
|
|
|
|
|
Nilai ASB |
24.557.933,31 |
| 2020 | 27.1.1.155.1 | Pemasangan PJU dengan kabel tanah dan Lampu LED | titik | 24.557.933,31 | (belum diset) | |
25 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.154 |
Pemasangan PJU dengan kabel tanah |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
5.692.159,00 |
5.692.159,00 |
|
|
|
|
|
Nilai ASB |
24.119.983,31 |
| 2020 | 27.1.1.154.1 | Pemasangan PJU dengan kabel tanah | titik | 24.119.983,31 | (belum diset) | |
26 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.2.1.3 |
Jembatan Bentang 12m |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
1.74 |
M1 |
113.758,40 |
197.939,62 |
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
1.01 |
M2 |
25.420,00 |
25.674,20 |
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
1 |
M2 |
8.975,66 |
8.975,66 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.84 |
M3 |
118.270,00 |
99.346,80 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.07 |
M3 |
471.628,02 |
33.013,96 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
0.84 |
M3 |
166.100,00 |
139.524,00 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
1.88 |
M3 |
281.590,28 |
529.389,73 |
24.1.3.4 |
- |
Pemasangan Crucuk Bambu 10 s/d 12 - P.3 m |
1.94 |
batang |
61.857,00 |
120.002,58 |
24.1.3.10 |
- |
Pembuatan KISDAM tinggi 2,5m tebal 0,6 m |
0.01 |
M1 |
711.721,40 |
7.117,21 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.9 |
M3 |
1.390.242,02 |
1.251.217,78 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.03 |
M3 |
568.825,93 |
17.064,78 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.37 |
M3 |
6.383.804,41 |
2.362.007,66 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.26 |
M3 |
7.944.915,55 |
2.065.677,97 |
24.1.4.64 |
- |
Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) |
0.24 |
M3 |
10.149.718,50 |
2.435.932,39 |
24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
0.01 |
M3 |
9.262.468,50 |
92.624,68 |
24.1.4.74 |
- |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
0.53 |
M3 |
8.648.594,42 |
4.583.754,80 |
24.1.6.3 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata |
0.12 |
M2 |
320.687,30 |
38.482,48 |
24.1.6.7 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1/2 bata |
0.11 |
M2 |
155.098,30 |
17.060,81 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
2.18 |
M2 |
99.416,60 |
216.728,20 |
24.1.6.25 |
- |
Pemasangan acian |
2.18 |
M2 |
60.790,00 |
132.522,21 |
24.1.9.40 |
- |
Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh |
0.08 |
M1 |
88.017,30 |
7.041,38 |
24.1.14.4 |
- |
Pekerjaan Besi Pipa Galvanis 1 1/4 " (Medium) |
0.82 |
meter |
56.602,00 |
46.413,64 |
24.1.14.7 |
- |
Pekerjaan Besi Pipa Galvanis 3 " (Medium) |
0.19 |
meter |
89.124,00 |
16.933,56 |
24.2.1.1 |
- |
Pemasangan Tegel Trotoar |
0.16 |
M2 |
238.060,60 |
38.089,70 |
24.2.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
0.32 |
M |
127.630,24 |
40.841,68 |
24.2.3.17 |
- |
Pasangan Batu tanpa Adukan (Aanstamping) |
0.07 |
M3 |
624.945,01 |
43.746,15 |
24.2.3.38 |
- |
Lapis Pondasi Aggregat Kelas A |
2.14 |
M3 |
908.635,51 |
1.944.480,10 |
24.2.3.48 |
- |
Lapis Pondasi Aggregat Kelas C |
1.71 |
M3 |
737.720,79 |
1.261.502,58 |
24.2.3.72 |
- |
Lapis Resap Pengikat - Aspal Cair |
1.42 |
M3 |
16.390,10 |
23.273,94 |
24.2.3.73 |
- |
Lapis Perekat - Aspal Cair |
1.42 |
liter |
17.664,37 |
25.083,40 |
24.2.3.83 |
- |
LasTon Lapis Aus (AC-WC) |
0.125 |
ton |
1.622.513,66 |
202.814,21 |
24.2.3.103 |
- |
Lapis ATB |
0.48 |
ton |
4.230.375,51 |
2.030.580,20 |
24.2.5.12 |
- |
Pemancangan Tiang Pancang Beton . ukuran .... |
4.67 |
M1 |
85.408,44 |
398.857,41 |
24.2.5.25 |
- |
Pembongkaran Beton |
0.41 |
M3 |
546.486,93 |
224.059,64 |
|
|
|
|
|
Nilai ASB |
20.677.775,09 |
| 2020 | 25.2.1.3.1 | Jembatan Bentang 12m | M2 | 20.677.775,09 | (belum diset) | |
27 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.21 |
Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.22 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m |
1 |
M |
10.550.159,81 |
10.550.159,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.55 |
- |
Pemasangan Tiang Oktagonal 9 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
6.994.859,00 |
6.994.859,00 |
|
|
|
|
|
Nilai ASB |
20.663.208,31 |
| 2020 | 27.1.1.21.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) | titik | 20.663.208,31 | (belum diset) | |
28 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.22 |
Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.22 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m |
1 |
M |
10.550.159,81 |
10.550.159,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.45 |
- |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.55 |
- |
Pemasangan Tiang Oktagonal 9 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
6.994.859,00 |
6.994.859,00 |
|
|
|
|
|
Nilai ASB |
20.663.208,31 |
| 2020 | 27.1.1.22.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) | titik | 20.663.208,31 | (belum diset) | |
29 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.11 |
Pemasangan Tiang dan rambu RPPJ 2 m x 3 m |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
1.47 |
M3 |
157.417,60 |
231.403,88 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
1 |
titik |
232.058,65 |
232.058,65 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.85 |
M3 |
1.943.652,28 |
1.652.104,48 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
68.82 |
kilogram |
23.886,93 |
1.643.898,47 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
6 |
M2 |
2.011.392,60 |
12.068.355,59 |
24.2.2.53 |
- |
Pemasangan Tiang Oktagonal 7 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
4.389.559,00 |
4.389.559,00 |
|
|
|
|
|
Nilai ASB |
20.217.380,06 |
| 2020 | 28.4.1.11.1 | Pemasangan Tiang dan rambu RPPJ 2 m x 3 m | unit | 20.217.380,06 | (belum diset) | |
30 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.152 |
Pemasangan Tiang Dekoratif Cab 2 |
|
|
Titik |
|
|
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
117.1.3.8.1.26 |
- |
Kabel NYFGbY 3 x 4 mm |
50 |
meter |
49.400,00 |
2.470.000,00 |
|
|
|
|
|
Nilai ASB |
19.291.510,91 |
| 2020 | 27.1.1.152.1 | Pemasangan Tiang Dekoratif Cab 2 | titik | 19.291.510,91 | (belum diset) | |
31 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.19 |
Pemasangan Lampu HPS 150 W - 1 Phase - Tiang cab 1-7 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.20 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 11,5 m |
1 |
M |
6.743.109,81 |
6.743.109,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.43 |
- |
Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
2.642.075,00 |
2.642.075,00 |
24.2.2.48 |
- |
Pondasi Biasa PJU |
1 |
titik |
925.947,82 |
925.947,82 |
24.2.2.53 |
- |
Pemasangan Tiang Oktagonal 7 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
4.389.559,00 |
4.389.559,00 |
|
|
|
|
|
Nilai ASB |
16.499.497,72 |
| 2020 | 27.1.1.19.1 | Pemasangan Lampu HPS 150 W - 1 Phase - Tiang cab 1-7 m (OKTAGONAL) | titik | 16.499.497,72 | (belum diset) | |
32 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.151 |
Pemasangan Tiang Dekoratif Cab 1 |
|
|
Titik |
|
|
24.2.2.22 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m |
1 |
M |
10.550.159,81 |
10.550.159,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
117.1.3.8.1.26 |
- |
Kabel NYFGbY 3 x 4 mm |
50 |
meter |
49.400,00 |
2.470.000,00 |
|
|
|
|
|
Nilai ASB |
14.313.060,91 |
| 2020 | 27.1.1.151.1 | Pemasangan Tiang Dekoratif Cab 1 | titik | 14.313.060,91 | (belum diset) | |
33 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.17 |
Pemasangan Lampu HPS 150 W - 1 Phase - Tiang cab 1-5 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.18 |
- |
Intalasi 1 Titik Lampu PJU (Tarikan Udara) 7,5 m |
1 |
M |
4.400.309,81 |
4.400.309,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.43 |
- |
Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
2.642.075,00 |
2.642.075,00 |
24.2.2.48 |
- |
Pondasi Biasa PJU |
1 |
titik |
925.947,82 |
925.947,82 |
24.2.2.51 |
- |
Pemasangan Tiang Oktagonal 5 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
3.655.059,00 |
3.655.059,00 |
|
|
|
|
|
Nilai ASB |
13.422.197,72 |
| 2020 | 27.1.1.17.1 | Pemasangan Lampu HPS 150 W - 1 Phase - Tiang cab 1-5 m (OKTAGONAL) | titik | 13.422.197,72 | (belum diset) | |
34 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 20 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
20 |
M2 |
640.512,49 |
12.810.249,76 |
|
|
|
|
|
Nilai ASB |
12.810.249,76 |
| 2020 | 25.1.1.2.34 | Pemeliharaan Jalan Overlay Lebar 20 m | M1 | 12.810.249,76 | (belum diset) | |
35 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.12 |
Pemasangan Rambu RPPJ 2 m x 3 m |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
6 |
M2 |
2.011.392,60 |
12.068.355,59 |
|
|
|
|
|
Nilai ASB |
12.068.355,59 |
| 2020 | 28.4.1.12.1 | Pemasangan Rambu RPPJ 2 m x 3 m | unit | 12.068.355,59 | (belum diset) | |
36 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.13 |
Pemasangan RPPJ Oktagonal Kantilever 1,8 x 1,2 m dengan scotch light engineering grade perismatik |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.945 |
M3 |
157.417,60 |
148.759,63 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
1 |
titik |
232.058,65 |
232.058,65 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.8 |
M3 |
1.943.652,28 |
1.554.921,85 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
58 |
kilogram |
23.886,93 |
1.385.441,90 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
4.32 |
M2 |
2.011.392,60 |
8.689.216,37 |
|
|
|
|
|
Nilai ASB |
12.010.398,39 |
| 2020 | 28.4.1.13.1 | Pemasangan RPPJ Oktagonal Kantilever 1,8 x 1,2 m dengan scotch light engineering grade perismatik | unit | 12.010.398,39 | (belum diset) | |
37 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.14 |
Pemasangan Rambu Lalu Lintas (90 cm) Engineering Grade serta Papan Tambahan dengan Tiang Overhead Oktagonal |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.945 |
M3 |
157.417,60 |
148.759,63 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
1 |
titik |
232.058,65 |
232.058,65 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.8 |
M3 |
1.943.652,28 |
1.554.921,85 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
58 |
kilogram |
23.886,93 |
1.385.441,90 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
2.47 |
M2 |
2.011.392,60 |
4.968.139,77 |
24.2.2.51 |
- |
Pemasangan Tiang Oktagonal 5 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
3.655.059,00 |
3.655.059,00 |
|
|
|
|
|
Nilai ASB |
11.944.380,80 |
| 2020 | 28.4.1.14.1 | Pemasangan Rambu Lalu Lintas (90 cm) Engineering Grade serta Papan Tambahan dengan Tiang Overhead Oktagonal | unit | 11.944.380,80 | (belum diset) | |
38 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.33 |
Pemasangan Lampu HPS 150 W - 1 Phase - Tiang Bulat |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.18 |
- |
Intalasi 1 Titik Lampu PJU (Tarikan Udara) 7,5 m |
1 |
M |
4.400.309,81 |
4.400.309,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.43 |
- |
Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
2.642.075,00 |
2.642.075,00 |
24.2.2.48 |
- |
Pondasi Biasa PJU |
1 |
titik |
925.947,82 |
925.947,82 |
24.2.2.57 |
- |
Pemasangan Tiang Cabang 1 Biasa 5m |
1 |
unit |
1.783.559,00 |
1.783.559,00 |
|
|
|
|
|
Nilai ASB |
11.550.697,72 |
| 2020 | 27.1.1.33.1 | Pemasangan Lampu HPS 150 W - 1 Phase - Tiang Bulat | titik | 11.550.697,72 | (belum diset) | |
39 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 18 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
18 |
M2 |
640.512,49 |
11.529.224,79 |
|
|
|
|
|
Nilai ASB |
11.529.224,79 |
| 2020 | 25.1.1.2.33 | Pemeliharaan Jalan Overlay Lebar 18 m | M1 | 11.529.224,79 | (belum diset) | |
40 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 17,5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
17.5 |
M2 |
640.512,49 |
11.208.968,54 |
|
|
|
|
|
Nilai ASB |
11.208.968,54 |
| 2020 | 25.1.1.2.32 | Pemeliharaan Jalan Overlay Lebar 17,5 m | M1 | 11.208.968,54 | (belum diset) | |