1 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.11 |
Pengadaan -Pemasangan Guard Rail |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
1 |
M1 |
113.758,40 |
113.758,40 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
348.596 |
M3 |
118.270,00 |
41.228.424,66 |
24.1.2.17 |
- |
Pengangkutan Tanah dari Lubang Galian yg dalamnya > 1 m |
348.6 |
M3 |
40.285,00 |
14.043.351,26 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
287.875 |
M3 |
1.943.652,28 |
559.528.128,32 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
125.25 |
M2 |
116.890,00 |
14.640.472,55 |
117.1.1.1.16.14 |
- |
Plat Strip uk 3x 40 mm |
501 |
M |
55.800,00 |
27.955.800,00 |
|
|
|
|
|
Nilai ASB |
657.522.645,20 |
| 2020 | 28.4.2.11.1 | Pengadaan -Pemasangan Guard Rail | unit | 657.522.645,20 | (belum diset) | |
2 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.2.2.9 |
Pembuatan Blok Makam |
|
|
Titik |
|
|
24.1.1.13 |
- |
Pekerjaan Pembongkaran Dinding Tembok Bata |
0.3135 |
M3 |
1.074.247,97 |
336.776,73 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
175 |
M3 |
118.270,00 |
20.697.250,01 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
175 |
M3 |
85.740,00 |
15.004.500,03 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
29.15 |
M3 |
471.628,02 |
13.747.956,56 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
310 |
M3 |
281.590,28 |
87.292.986,90 |
24.1.3.2 |
- |
Pemasangan Turap Bambu tinggi 1,5 m |
18.05 |
M1 |
295.947,08 |
5.341.844,56 |
24.1.3.15 |
- |
Pemasangan Batu Kali Kosongan (aanstamping) |
2.17 |
M3 |
837.121,22 |
1.816.553,10 |
24.1.6.3 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata |
359 |
M2 |
320.687,30 |
115.126.741,52 |
24.1.9.40 |
- |
Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh |
68 |
M1 |
88.017,30 |
5.985.176,59 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
16.5 |
buah |
22.941,10 |
378.528,14 |
24.2.1.3 |
- |
Pemasangan Paving Blok Tbl.8 cm segi empat |
512 |
M2 |
132.290,00 |
67.732.480,21 |
24.2.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
835 |
M |
127.630,24 |
106.571.252,62 |
24.2.1.9 |
- |
Stopper/Uskup tebal 8 cm abu - abu |
552.5 |
M |
53.100,90 |
29.338.247,01 |
24.2.1.12 |
- |
Pembongkaran Paving Dipakai Kembali |
11.6 |
M2 |
10.168,00 |
117.948,80 |
24.2.5.25 |
- |
Pembongkaran Beton |
0.5 |
M3 |
546.486,93 |
273.243,47 |
117.1.1.1.22.468 |
- |
Riol Beton |
5 |
buah |
748.400,00 |
3.742.000,00 |
|
|
|
|
|
Nilai ASB |
473.503.486,27 |
| 2020 | 27.2.2.9.1 | Pembuatan Blok Makam | unit | 473.503.486,27 | (belum diset) | |
3 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.148 |
Pemasangan Tiang PJU cab 1 |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.22 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m |
18 |
M |
10.550.159,81 |
189.902.876,58 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
1 |
unit |
288.360,00 |
288.360,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.55 |
- |
Pemasangan Tiang Oktagonal 9 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
6.994.859,00 |
6.994.859,00 |
|
|
|
|
|
Nilai ASB |
200.275.449,08 |
| 2020 | 27.1.1.148.1 | Pemasangan Tiang PJU cab 1 | titik | 200.275.449,08 | (belum diset) | |
4 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.2.2.12 |
Pemeliharaan Menara Pantau |
|
|
Titik |
|
|
26.1.1.2.1 |
- |
Pembangunan Gedung Type B |
21.9465 |
M2 |
8.259.969,82 |
181.277.434,13 |
|
|
|
|
|
Nilai ASB |
181.277.434,13 |
| 2020 | 27.2.2.12.1 | Pemeliharaan Menara Pantau | unit | 181.277.434,13 | (belum diset) | |
5 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.2.2.10 |
Pembangunan Dermaga Beton Mangrove |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
44 |
M1 |
113.758,40 |
5.005.369,65 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
30 |
M2 |
12.710,00 |
381.300,01 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
17.4 |
M3 |
118.270,00 |
2.057.897,96 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
12.6 |
M3 |
85.740,00 |
1.080.324,03 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.6 |
M3 |
471.628,02 |
282.976,82 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
12 |
titik |
232.058,65 |
2.784.703,78 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.6 |
M3 |
568.825,93 |
341.295,57 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
3.6 |
M3 |
6.383.804,41 |
22.981.695,25 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
3.84 |
M3 |
7.944.915,55 |
30.508.475,03 |
24.1.4.64 |
- |
Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) |
4.82 |
M3 |
10.149.718,50 |
48.921.644,93 |
24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
4.26 |
M3 |
9.262.468,50 |
39.458.117,94 |
24.1.4.68 |
- |
Pekerjaan Kolom Beton Bertulang (300 kg besi + Bekisting) |
0.12 |
M3 |
13.040.231,56 |
1.564.827,75 |
24.1.6.25 |
- |
Pemasangan acian |
170.71 |
M2 |
60.790,00 |
10.377.461,41 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
0 |
M |
40.230,50 |
0,00 |
|
|
|
|
|
Nilai ASB |
165.746.090,13 |
| 2020 | 27.2.2.10.1 | Pembangunan Dermaga Beton Mangrove | titik | 165.746.090,13 | (belum diset) | |
6 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.6.1.3 |
Pembuatan Gapura Tipe 1 |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
33 |
M1 |
113.758,40 |
3.754.027,24 |
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
10 |
M2 |
25.420,00 |
254.200,00 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
30.88 |
M3 |
118.270,00 |
3.652.177,50 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
1.54 |
M3 |
471.628,02 |
726.307,13 |
24.1.3.13 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 5 Ps) |
12.32 |
M3 |
1.324.364,43 |
16.316.169,32 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
8 |
titik |
232.058,65 |
1.856.469,18 |
24.1.3.25 |
- |
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) |
2.26 |
M3 |
1.054.854,31 |
2.383.970,74 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.14 |
M3 |
568.825,93 |
79.635,63 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
1.19 |
M3 |
6.383.804,41 |
7.596.727,61 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.58 |
M3 |
7.944.915,55 |
4.608.050,89 |
24.1.4.64 |
- |
Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) |
2.32 |
M3 |
10.149.718,50 |
23.547.346,25 |
24.1.4.68 |
- |
Pekerjaan Kolom Beton Bertulang (300 kg besi + Bekisting) |
1.17 |
M3 |
13.040.231,56 |
15.257.070,36 |
24.1.6.8 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata |
80.2 |
M2 |
150.726,50 |
12.088.265,09 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
160.4 |
M2 |
99.416,60 |
15.946.422,39 |
24.1.6.25 |
- |
Pemasangan acian |
130.6 |
M2 |
60.790,00 |
7.939.174,45 |
24.1.8.1 |
- |
Pemasangan Lantai Keramik 30x30 cm |
40 |
M2 |
578.227,50 |
23.129.099,83 |
24.2.2.70 |
- |
Pengecatan dengan Cat Road Line |
142.6 |
M2 |
87.985,00 |
12.546.661,78 |
24.2.3.17 |
- |
Pasangan Batu tanpa Adukan (Aanstamping) |
18.4 |
M3 |
624.945,01 |
11.498.987,94 |
|
|
|
|
|
Nilai ASB |
163.180.763,33 |
| 2020 | 28.6.1.3.1 | Pembuatan Gapura Tipe 1 | unit | 163.180.763,33 | (belum diset) | |
7 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.6.1.5 |
Pemeliharaan Jogging Track |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
64.2 |
M1 |
113.758,40 |
7.303.289,00 |
24.1.8.14 |
- |
Pemasangan lantai kayu gymfloor |
66.5 |
M1 |
183.190,00 |
12.182.134,81 |
24.1.9.2 |
- |
Pemasangan Konstruksi Kuda-Kuda Konvensional Kayu Kelas II bentang 6 m. |
2.18 |
M3 |
19.216.990,36 |
41.893.040,26 |
24.1.9.61 |
- |
Pemasangan Listplank Asbes Datar Kayu Kelas II |
55.4 |
M2 |
480.735,88 |
26.632.768,53 |
24.1.10.38 |
- |
Pembongkaran Kayu |
2.18 |
M3 |
1.248.476,01 |
2.721.677,79 |
24.2.2.70 |
- |
Pengecatan dengan Cat Road Line |
790 |
M2 |
87.985,00 |
69.508.151,35 |
|
|
|
|
|
Nilai ASB |
160.241.061,76 |
| 2020 | 28.6.1.5.1 | Pemeliharaan Jogging Track | unit | 160.241.061,76 | (belum diset) | |
8 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.6.1.4 |
Pembuatan Gapura Tipe 2 |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
23 |
M1 |
113.758,40 |
2.616.443,22 |
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
10 |
M2 |
25.420,00 |
254.200,00 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
38.88 |
M3 |
118.270,00 |
4.598.337,73 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
20.86 |
M3 |
85.740,00 |
1.788.536,46 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
1.94 |
M3 |
471.628,02 |
914.958,38 |
24.1.3.13 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 5 Ps) |
10.56 |
M3 |
1.324.364,43 |
13.985.288,89 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
8 |
titik |
232.058,65 |
1.856.469,18 |
24.1.3.25 |
- |
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) |
2.26 |
M3 |
1.054.854,31 |
2.383.970,74 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.14 |
M3 |
568.825,93 |
79.635,63 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.58 |
M3 |
6.383.804,41 |
3.702.606,45 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
1.01 |
M3 |
7.944.915,55 |
8.024.364,63 |
24.1.4.64 |
- |
Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) |
2.2 |
M3 |
10.149.718,50 |
22.329.381,19 |
24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
1.17 |
M3 |
9.262.468,50 |
10.837.087,75 |
24.1.6.8 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata |
70.2 |
M2 |
150.726,50 |
10.581.000,05 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
140.4 |
M2 |
99.416,60 |
13.958.090,34 |
24.1.6.25 |
- |
Pemasangan acian |
120.6 |
M2 |
60.790,00 |
7.331.273,98 |
24.1.8.1 |
- |
Pemasangan Lantai Keramik 30x30 cm |
30 |
M2 |
578.227,50 |
17.346.824,87 |
24.2.2.70 |
- |
Pengecatan dengan Cat Road Line |
127.18 |
M2 |
87.985,00 |
11.189.932,54 |
24.2.3.17 |
- |
Pasangan Batu tanpa Adukan (Aanstamping) |
4.8 |
M3 |
624.945,01 |
2.999.736,16 |
|
|
|
|
|
Nilai ASB |
136.778.138,22 |
| 2020 | 28.6.1.4.1 | Pembuatan Gapura Tipe 2 | unit | 136.778.138,22 | (belum diset) | |
9 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.7 |
Traffic Light 4 Kaki Simpang |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
5.625 |
M3 |
118.270,00 |
665.268,75 |
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
19.243 |
M3 |
157.417,60 |
3.029.186,89 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
12.125 |
M3 |
85.740,00 |
1.039.597,50 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
4 |
titik |
193.385,05 |
773.540,19 |
24.1.3.25 |
- |
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) |
0.75 |
M3 |
1.054.854,31 |
791.140,74 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
3.563 |
M3 |
1.943.652,28 |
6.925.232,99 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
206.056 |
kilogram |
23.046,93 |
4.748.958,07 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
2.961 |
kilogram |
23.886,93 |
70.729,20 |
24.1.4.51 |
- |
Bekisting untuk Sloof |
4.02 |
M2 |
436.108,01 |
1.753.154,18 |
24.1.7.8 |
- |
Pengecatan Besi |
1.89 |
M2 |
53.052,00 |
100.268,28 |
24.1.8.5 |
- |
Pemasangan Lantai Keramik ukuran 40x40 cm |
1.68 |
M2 |
1.423.510,50 |
2.391.497,56 |
24.1.9.40 |
- |
Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh |
154 |
M1 |
88.017,30 |
13.554.664,64 |
24.1.13.5 |
- |
Pekerjaan Pembuatan Pagar Besi Model PMG 1,2 m x 2,4 m |
1 |
panel |
15.400.691,90 |
15.400.691,90 |
24.1.14.8 |
- |
Pekerjaan Besi Pipa Galvanis 4 " (Medium) |
5 |
meter |
118.832,00 |
594.159,99 |
24.2.2.3 |
- |
Pemasangan Kabel Bawah Tanah |
50 |
M |
307.070,00 |
15.353.500,00 |
117.1.3.8.1.36 |
- |
Kabel NYFGDY 3 x 10 mm |
616 |
meter |
90.800,00 |
55.932.800,00 |
117.1.3.8.1.47 |
- |
Kabel NYM 3 x 2,5 mm |
3.5 |
Roll |
858.100,00 |
3.003.350,00 |
117.1.3.8.1.88 |
- |
Kabel TWISTED 2 x 15 mm |
85 |
meter |
13.400,00 |
1.139.000,00 |
|
|
|
|
|
Nilai ASB |
127.266.740,87 |
| 2020 | 28.4.2.7.1 | Traffic Light 4 Kaki Simpang | unit | 127.266.740,87 | (belum diset) | |
10 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.6 |
Traffic Light 3 Kaki Simpang |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
5.625 |
M3 |
118.270,00 |
665.268,75 |
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
16.0287 |
M3 |
157.417,60 |
2.523.199,47 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
12.125 |
M3 |
85.740,00 |
1.039.597,50 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
3 |
titik |
193.385,05 |
580.155,14 |
24.1.3.25 |
- |
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) |
5.3625 |
M3 |
1.054.854,31 |
5.656.656,46 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
1.8138 |
M3 |
1.943.652,28 |
3.525.396,46 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
189.277 |
kilogram |
23.046,93 |
4.362.253,48 |
24.1.4.51 |
- |
Bekisting untuk Sloof |
2.94 |
M2 |
436.108,01 |
1.282.157,57 |
24.1.7.8 |
- |
Pengecatan Besi |
1.1775 |
M2 |
53.052,00 |
62.468,73 |
24.1.8.5 |
- |
Pemasangan Lantai Keramik ukuran 40x40 cm |
1.68 |
M2 |
1.423.510,50 |
2.391.497,56 |
24.1.9.40 |
- |
Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh |
138 |
M1 |
88.017,30 |
12.146.387,79 |
24.1.14.5 |
- |
Pekerjaan Besi Pipa Galvanis 2 " (Medium) |
6 |
meter |
59.416,00 |
356.495,99 |
24.1.14.8 |
- |
Pekerjaan Besi Pipa Galvanis 4 " (Medium) |
3.75 |
meter |
118.832,00 |
445.619,99 |
24.2.2.3 |
- |
Pemasangan Kabel Bawah Tanah |
36 |
M |
307.070,00 |
11.054.520,00 |
117.1.1.1.22.317 |
- |
Tiang Oktagonal 5 m Double Hot Dipped Galvanized dengan Flenders |
3 |
batang |
5.396.700,00 |
16.190.100,00 |
117.1.3.8.1.26 |
- |
Kabel NYFGbY 3 x 4 mm |
510 |
meter |
49.400,00 |
25.194.000,00 |
117.1.3.8.1.47 |
- |
Kabel NYM 3 x 2,5 mm |
3 |
Roll |
858.100,00 |
2.574.300,00 |
117.1.3.8.1.88 |
- |
Kabel TWISTED 2 x 15 mm |
75 |
meter |
13.400,00 |
1.005.000,00 |
|
|
|
|
|
Nilai ASB |
91.055.074,89 |
| 2020 | 28.4.2.6.1 | Traffic Light 3 Kaki Simpang | unit | 91.055.074,89 | (belum diset) | |
11 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.10 |
Traffic Light 4 Kaki Simpang Lengkap dengan Kamera Sensor ATCS - ITS |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
1 |
M1 |
113.758,40 |
113.758,40 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
25.5678 |
M3 |
118.270,00 |
3.023.903,77 |
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
1.859 |
M3 |
157.417,60 |
292.639,31 |
24.1.2.13 |
- |
Penimbunan tanah, Perataan dan Pemadatan menggunakan Alat Berat |
15.375 |
M3 |
427.689,23 |
6.575.721,84 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
4 |
titik |
193.385,05 |
773.540,19 |
24.1.3.25 |
- |
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) |
0.75 |
M3 |
1.054.854,31 |
791.140,74 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
7.0248 |
M3 |
1.943.652,28 |
13.653.768,18 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
630.266 |
kilogram |
23.046,93 |
14.525.695,77 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
87.84 |
kilogram |
23.886,93 |
2.098.227,78 |
24.1.4.50 |
- |
Bekisting untuk Pondasi |
0.24 |
M2 |
402.621,99 |
96.629,28 |
24.1.7.8 |
- |
Pengecatan Besi |
1.099 |
M2 |
53.052,00 |
58.304,15 |
24.1.9.40 |
- |
Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh |
1.859 |
M1 |
88.017,30 |
163.624,16 |
24.1.14.8 |
- |
Pekerjaan Besi Pipa Galvanis 4 " (Medium) |
21 |
meter |
118.832,00 |
2.495.471,94 |
24.2.2.3 |
- |
Pemasangan Kabel Bawah Tanah |
85 |
M |
307.070,00 |
26.100.950,01 |
117.1.3.8.1.88 |
- |
Kabel TWISTED 2 x 15 mm |
85 |
meter |
13.400,00 |
1.139.000,00 |
117.1.3.8.12.166 |
- |
BESI SIKU 40 X 3 mm |
2 |
batang |
114.800,00 |
229.600,00 |
|
|
|
|
|
Nilai ASB |
72.144.685,52 |
| 2020 | 28.4.2.10.1 | Traffic Light 4 Kaki Simpang Lengkap dengan Kamera Sensor ATCS - ITS | unit | 72.144.685,52 | (belum diset) | |
12 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.5 |
Pedestrian Crossing Traffic Light (PCTL) dengan 4 Tiang |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
1 |
M3 |
118.270,00 |
118.270,00 |
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
13.048 |
M3 |
157.417,60 |
2.053.984,90 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
8.5 |
M3 |
85.740,00 |
728.790,00 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
2 |
titik |
193.385,05 |
386.770,09 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
1.2885 |
M3 |
1.943.652,28 |
2.504.395,87 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
96.7255 |
kilogram |
23.046,93 |
2.229.225,81 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
24.211 |
kilogram |
23.886,93 |
578.326,46 |
24.1.4.51 |
- |
Bekisting untuk Sloof |
1.59 |
M2 |
436.108,01 |
693.411,75 |
24.1.7.8 |
- |
Pengecatan Besi |
4.512 |
M2 |
53.052,00 |
239.370,63 |
24.1.8.0 |
- |
- |
1.68 |
M2 |
0,00 |
0,00 |
24.1.9.40 |
- |
Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh |
77 |
M1 |
88.017,30 |
6.777.332,32 |
24.1.14.5 |
- |
Pekerjaan Besi Pipa Galvanis 2 " (Medium) |
6 |
meter |
59.416,00 |
356.495,99 |
24.1.14.8 |
- |
Pekerjaan Besi Pipa Galvanis 4 " (Medium) |
2 |
meter |
118.832,00 |
237.663,99 |
24.2.2.3 |
- |
Pemasangan Kabel Bawah Tanah |
45 |
M |
307.070,00 |
13.818.150,00 |
24.2.2.52 |
- |
Pemasangan Tiang Oktagonal 5 m Double Hot Dipped Galvanized dengan Flenders |
2 |
unit |
5.692.159,00 |
11.384.318,00 |
117.1.1.1.22.223 |
- |
Pabrikasi/Elektroda Baja(20%) |
12.65 |
M2 |
46.900,00 |
593.284,98 |
117.1.2.11.2.87 |
- |
Angker Besi PJU. |
25 |
Kg |
17.800,00 |
445.000,00 |
117.1.3.8.1.26 |
- |
Kabel NYFGbY 3 x 4 mm |
431 |
meter |
49.400,00 |
21.291.400,00 |
117.1.3.8.1.47 |
- |
Kabel NYM 3 x 2,5 mm |
5 |
Roll |
858.100,00 |
4.290.500,00 |
117.1.3.8.1.88 |
- |
Kabel TWISTED 2 x 15 mm |
75 |
meter |
13.400,00 |
1.005.000,00 |
|
|
|
|
|
Nilai ASB |
69.731.690,79 |
| 2020 | 28.4.2.5.1 | Pedestrian Crossing Traffic Light (PCTL) dengan 4 Tiang | unit | 69.731.690,79 | (belum diset) | |
13 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.6.1.7 |
Pembuatan Playground |
|
|
Titik |
|
|
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
8.8 |
M3 |
471.628,02 |
4.150.326,65 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
8.8 |
M3 |
281.590,28 |
2.477.994,52 |
24.1.7.4 |
- |
Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) |
126.64 |
M2 |
82.723,10 |
10.476.053,42 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
88 |
M2 |
116.890,00 |
10.286.320,04 |
24.2.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
38.9 |
M |
127.630,24 |
4.964.816,63 |
117.1.1.1.22.86 |
- |
Papan/ Kaso Kayu Kelas II |
2.5 |
M3 |
14.567.300,00 |
36.418.250,00 |
|
|
|
|
|
Nilai ASB |
68.773.761,27 |
| 2020 | 28.6.1.7.1 | Pembuatan Playground | M2 | 68.773.761,27 | (belum diset) | |
14 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.9 |
Traffic Light 3 Kaki Simpang Lengkap dengan Kamera Sensor ATCS - ITS |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
22.9195 |
M3 |
118.270,00 |
2.710.689,31 |
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
1.3943 |
M3 |
157.417,60 |
219.487,36 |
24.1.2.13 |
- |
Penimbunan tanah, Perataan dan Pemadatan menggunakan Alat Berat |
15.375 |
M3 |
427.689,23 |
6.575.721,84 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
3 |
titik |
193.385,05 |
580.155,14 |
24.1.3.25 |
- |
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) |
0.5625 |
M3 |
1.054.854,31 |
593.355,55 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
5.2193 |
M3 |
1.943.652,28 |
10.144.503,93 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
535.022 |
kilogram |
23.046,93 |
12.330.613,60 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
34.98 |
kilogram |
23.886,93 |
835.564,78 |
24.1.4.49 |
- |
Tulangan Beton dengan Kabel prestressed polos/strand |
65.88 |
kilogram |
19.915,46 |
1.312.030,39 |
24.1.4.50 |
- |
Bekisting untuk Pondasi |
2.94 |
M2 |
402.621,99 |
1.183.708,67 |
24.1.7.8 |
- |
Pengecatan Besi |
0.942 |
M2 |
53.052,00 |
49.974,98 |
24.1.14.8 |
- |
Pekerjaan Besi Pipa Galvanis 4 " (Medium) |
18 |
meter |
118.832,00 |
2.138.975,95 |
24.2.2.3 |
- |
Pemasangan Kabel Bawah Tanah |
75 |
M |
307.070,00 |
23.030.250,01 |
117.1.3.8.1.36 |
- |
Kabel NYFGDY 3 x 10 mm |
35 |
meter |
90.800,00 |
3.178.000,00 |
117.1.3.8.1.88 |
- |
Kabel TWISTED 2 x 15 mm |
85 |
meter |
13.400,00 |
1.139.000,00 |
117.2.2.1.2.7 |
- |
Pipa Galvanis 6 m 2" |
6 |
meter |
76.100,00 |
456.600,00 |
|
|
|
|
|
Nilai ASB |
66.478.631,52 |
| 2020 | 28.4.2.9.1 | Traffic Light 3 Kaki Simpang Lengkap dengan Kamera Sensor ATCS - ITS | unit | 66.478.631,52 | (belum diset) | |
15 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.4 |
Pedestrian Crossing Traffic Light (PCTL) dengan 2 Tiang |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
1 |
M3 |
118.270,00 |
118.270,00 |
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
6.2473 |
M3 |
157.417,60 |
983.435,00 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
3.55 |
M3 |
85.740,00 |
304.377,00 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
2 |
titik |
193.385,05 |
386.770,09 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.843 |
M3 |
1.943.652,28 |
1.638.498,86 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
49.3308 |
kilogram |
23.046,93 |
1.136.923,44 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
43.92 |
kilogram |
23.886,93 |
1.049.113,89 |
24.1.4.51 |
- |
Bekisting untuk Sloof |
1.05 |
M2 |
436.108,01 |
457.913,39 |
24.1.7.8 |
- |
Pengecatan Besi |
3.384 |
M2 |
53.052,00 |
179.527,97 |
24.1.8.5 |
- |
Pemasangan Lantai Keramik ukuran 40x40 cm |
1.68 |
M2 |
1.423.510,50 |
2.391.497,56 |
24.1.9.40 |
- |
Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh |
57 |
M1 |
88.017,30 |
5.016.986,26 |
24.1.14.5 |
- |
Pekerjaan Besi Pipa Galvanis 2 " (Medium) |
6 |
meter |
59.416,00 |
356.495,99 |
24.1.14.8 |
- |
Pekerjaan Besi Pipa Galvanis 4 " (Medium) |
2.5 |
meter |
118.832,00 |
297.079,99 |
24.2.2.3 |
- |
Pemasangan Kabel Bawah Tanah |
30 |
M |
307.070,00 |
9.212.100,00 |
24.2.2.52 |
- |
Pemasangan Tiang Oktagonal 5 m Double Hot Dipped Galvanized dengan Flenders |
2 |
unit |
5.692.159,00 |
11.384.318,00 |
117.1.1.1.22.223 |
- |
Pabrikasi/Elektroda Baja(20%) |
7.59 |
M2 |
46.900,00 |
355.971,01 |
117.1.2.11.2.87 |
- |
Angker Besi PJU. |
25 |
Kg |
17.800,00 |
445.000,00 |
117.1.3.8.1.26 |
- |
Kabel NYFGbY 3 x 4 mm |
291 |
meter |
49.400,00 |
14.375.400,00 |
117.1.3.8.1.47 |
- |
Kabel NYM 3 x 2,5 mm |
3.5 |
Roll |
858.100,00 |
3.003.350,00 |
117.1.3.8.1.88 |
- |
Kabel TWISTED 2 x 15 mm |
75 |
meter |
13.400,00 |
1.005.000,00 |
|
|
|
|
|
Nilai ASB |
54.098.028,46 |
| 2020 | 28.4.2.4.1 | Pedestrian Crossing Traffic Light (PCTL) dengan 2 Tiang | unit | 54.098.028,46 | (belum diset) | |
16 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.6.1.1 |
Gubug Jamur |
|
|
Titik |
|
|
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
19 |
M2 |
25.420,00 |
482.980,01 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
1.05 |
M3 |
118.270,00 |
124.183,49 |
24.1.2.13 |
- |
Penimbunan tanah, Perataan dan Pemadatan menggunakan Alat Berat |
5 |
M3 |
427.689,23 |
2.138.446,13 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.6 |
M3 |
1.943.652,28 |
1.166.191,41 |
24.1.9.15 |
- |
Pemasangan Reng /Usuk Kayu Kelas II |
10.5 |
M2 |
452.785,41 |
4.754.246,84 |
24.1.9.21 |
- |
Pemasangan Genteng Beton |
9 |
M2 |
274.476,50 |
2.470.288,51 |
24.1.9.28 |
- |
Pemasangan Penutup Atap Rabung Genteng Beton |
35 |
M1 |
1.074.274,83 |
37.599.619,09 |
24.2.3.17 |
- |
Pasangan Batu tanpa Adukan (Aanstamping) |
0.37 |
M3 |
624.945,01 |
231.229,66 |
|
|
|
|
|
Nilai ASB |
48.967.185,14 |
| 2020 | 28.6.1.1.1 | Gubug Jamur | unit | 48.967.185,14 | (belum diset) | |
17 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.2.1.2 |
Jembatan Bentang 8m |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
3.39 |
M1 |
113.758,40 |
385.640,99 |
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
1.03 |
M2 |
25.420,00 |
26.182,60 |
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
1 |
M2 |
8.975,66 |
8.975,66 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
1.63 |
M3 |
118.270,00 |
192.780,10 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.09 |
M3 |
471.628,02 |
42.446,52 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.63 |
M3 |
166.100,00 |
270.743,00 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
3.67 |
M3 |
281.590,28 |
1.033.436,35 |
24.1.3.4 |
- |
Pemasangan Crucuk Bambu 10 s/d 12 - P.3 m |
3.79 |
batang |
61.857,00 |
234.438,03 |
24.1.3.10 |
- |
Pembuatan KISDAM tinggi 2,5m tebal 0,6 m |
0.03 |
M1 |
711.721,40 |
21.351,64 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
1.36 |
M3 |
1.390.242,02 |
1.890.729,16 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.04 |
M3 |
568.825,93 |
22.753,04 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.37 |
M3 |
6.383.804,41 |
2.362.007,66 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.25 |
M3 |
7.944.915,55 |
1.986.228,89 |
24.1.4.64 |
- |
Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) |
0.23 |
M3 |
10.149.718,50 |
2.334.435,30 |
24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
0.01 |
M3 |
9.262.468,50 |
92.624,68 |
24.1.4.74 |
- |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
0.6 |
M3 |
8.648.594,42 |
5.189.156,86 |
24.1.5.12 |
- |
Pekerjaan Pabrikasi dan Elektroda Besi Siku L40.40.4 |
4.67 |
kilogram |
218.200,60 |
1.018.996,80 |
24.1.6.3 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata |
0.09 |
M2 |
320.687,30 |
28.861,86 |
24.1.6.7 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1/2 bata |
0.11 |
M2 |
155.098,30 |
17.060,81 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
2.52 |
M2 |
99.416,60 |
250.529,84 |
24.1.6.25 |
- |
Pemasangan acian |
2.52 |
M2 |
60.790,00 |
153.190,80 |
24.1.9.40 |
- |
Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh |
0.08 |
M1 |
88.017,30 |
7.041,38 |
24.1.14.4 |
- |
Pekerjaan Besi Pipa Galvanis 1 1/4 " (Medium) |
0.8 |
meter |
56.602,00 |
45.281,60 |
24.1.14.7 |
- |
Pekerjaan Besi Pipa Galvanis 3 " (Medium) |
0.19 |
meter |
89.124,00 |
16.933,56 |
24.2.1.1 |
- |
Pemasangan Tegel Trotoar |
0.16 |
M2 |
238.060,60 |
38.089,70 |
24.2.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
0.31 |
M |
127.630,24 |
39.565,38 |
24.2.3.17 |
- |
Pasangan Batu tanpa Adukan (Aanstamping) |
0.1 |
M3 |
624.945,01 |
62.494,50 |
24.2.3.38 |
- |
Lapis Pondasi Aggregat Kelas A |
4.17 |
M3 |
908.635,51 |
3.789.010,17 |
24.2.3.48 |
- |
Lapis Pondasi Aggregat Kelas C |
3.34 |
M3 |
737.720,79 |
2.463.987,37 |
24.2.3.72 |
- |
Lapis Resap Pengikat - Aspal Cair |
2.63 |
liter |
16.390,10 |
43.105,97 |
24.2.3.73 |
- |
Lapis Perekat - Aspal Cair |
2.63 |
liter |
17.664,37 |
46.457,29 |
24.2.3.83 |
- |
LasTon Lapis Aus (AC-WC) |
0.156 |
ton |
1.622.513,66 |
253.112,14 |
24.2.3.103 |
- |
Lapis ATB |
0.87 |
ton |
4.230.375,51 |
3.680.426,71 |
24.2.5.25 |
- |
Pembongkaran Beton |
0.41 |
M3 |
546.486,93 |
224.059,64 |
|
|
|
|
|
Nilai ASB |
28.272.135,99 |
| 2020 | 25.2.1.2.1 | Jembatan Bentang 8m | M2 | 28.272.135,99 | (belum diset) | |
18 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.2.1.1 |
Jembatan Bentang 6m |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
3.47 |
M1 |
113.758,40 |
394.741,65 |
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
1.03 |
M2 |
25.420,00 |
26.182,60 |
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
1 |
M2 |
8.975,66 |
8.975,66 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
1.67 |
M3 |
118.270,00 |
197.510,90 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.16 |
M3 |
471.628,02 |
75.460,48 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.67 |
M3 |
166.100,00 |
277.386,99 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
3.76 |
M3 |
281.590,28 |
1.058.779,45 |
24.1.3.4 |
- |
Pemasangan Crucuk Bambu 10 s/d 12 - P.3 m |
3.89 |
batang |
61.857,00 |
240.623,74 |
24.1.3.10 |
- |
Pembuatan KISDAM tinggi 2,5m tebal 0,6 m |
0.03 |
M1 |
711.721,40 |
21.351,64 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
1.81 |
M3 |
1.390.242,02 |
2.516.337,97 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.06 |
M3 |
568.825,93 |
34.129,56 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.49 |
M3 |
6.383.804,41 |
3.128.064,22 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.01 |
M3 |
7.944.915,55 |
79.449,15 |
24.1.4.64 |
- |
Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) |
0.24 |
M3 |
10.149.718,50 |
2.435.932,39 |
24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
0.01 |
M3 |
9.262.468,50 |
92.624,68 |
24.1.4.74 |
- |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
0.28 |
M3 |
8.648.594,42 |
2.421.606,45 |
24.1.6.3 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata |
0.12 |
M2 |
320.687,30 |
38.482,48 |
24.1.6.7 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1/2 bata |
0.11 |
M2 |
155.098,30 |
17.060,81 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
3.2 |
M2 |
99.416,60 |
318.133,13 |
24.1.6.25 |
- |
Pemasangan acian |
2.2 |
M2 |
60.790,00 |
133.738,00 |
24.1.9.40 |
- |
Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh |
0.08 |
M1 |
88.017,30 |
7.041,38 |
24.1.14.4 |
- |
Pekerjaan Besi Pipa Galvanis 1 1/4 " (Medium) |
0.82 |
meter |
56.602,00 |
46.413,64 |
24.1.14.7 |
- |
Pekerjaan Besi Pipa Galvanis 3 " (Medium) |
0.19 |
meter |
89.124,00 |
16.933,56 |
24.2.1.1 |
- |
Pemasangan Tegel Trotoar |
0.16 |
M2 |
238.060,60 |
38.089,70 |
24.2.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
0.32 |
M |
127.630,24 |
40.841,68 |
24.2.3.17 |
- |
Pasangan Batu tanpa Adukan (Aanstamping) |
0.13 |
M3 |
624.945,01 |
81.242,85 |
24.2.3.38 |
- |
Lapis Pondasi Aggregat Kelas A |
4.28 |
M3 |
908.635,51 |
3.888.960,19 |
24.2.3.48 |
- |
Lapis Pondasi Aggregat Kelas C |
3.42 |
M3 |
737.720,79 |
2.523.005,16 |
24.2.3.72 |
- |
Lapis Resap Pengikat - Aspal Cair |
2.71 |
liter |
16.390,10 |
44.417,17 |
24.2.3.73 |
- |
Lapis Perekat - Aspal Cair |
2.71 |
liter |
17.664,37 |
47.870,44 |
24.2.3.83 |
- |
LasTon Lapis Aus (AC-WC) |
0.9774 |
ton |
1.622.513,66 |
1.585.844,86 |
24.2.3.103 |
- |
Lapis ATB |
0.91 |
ton |
4.230.375,51 |
3.849.641,82 |
24.2.5.12 |
- |
Pemancangan Tiang Pancang Beton . ukuran .... |
6.22 |
M1 |
85.408,44 |
531.240,47 |
24.2.5.25 |
- |
Pembongkaran Beton |
0.41 |
M3 |
546.486,93 |
224.059,64 |
117.1.1.1.2.45 |
- |
Mortar |
0.19 |
M3 |
48.100,00 |
9.139,00 |
|
|
|
|
|
Nilai ASB |
26.451.313,52 |
| 2020 | 25.2.1.1.1 | Jembatan Bentang 6m | M2 | 26.451.313,52 | (belum diset) | |
19 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.1 |
Pemasangan PJU dengan kabel udara |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
2 |
unit |
218.975,00 |
437.950,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.55 |
- |
Pemasangan Tiang Oktagonal 9 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
6.994.859,00 |
6.994.859,00 |
|
|
|
|
|
Nilai ASB |
25.860.633,31 |
| 2020 | 27.1.1.1.1 | Pemasangan PJU dengan kabel udara | titik | 25.860.633,31 | (belum diset) | |
20 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.2.1.4 |
Jembatan Bentang 4 m |
|
|
Titik |
|
|
24.1.1.1 |
- |
Pembuatan Pagar Sementara dari kayu tinggi 2 m |
0.53 |
M1 |
624.309,68 |
330.884,11 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.1.14 |
- |
Pemasangan Pagar Kawat Jaring Galvanis |
1 |
M2 |
51.019,12 |
51.019,12 |
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
5.66 |
M3 |
157.417,60 |
890.983,59 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.44 |
M3 |
85.740,00 |
37.725,60 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.45 |
M3 |
471.628,02 |
212.232,60 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
5.21 |
M3 |
166.100,00 |
865.381,01 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.56 |
M3 |
281.590,28 |
157.690,56 |
24.1.3.9 |
- |
Pembuatan KISDAM tinggi 2m tebal 0,6 m |
0.63 |
M1 |
646.423,95 |
407.247,08 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
1.69 |
M3 |
1.390.242,02 |
2.349.509,09 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
0.25 |
titik |
232.058,65 |
58.014,66 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.26 |
M2 |
6.383.804,41 |
1.659.789,08 |
24.1.4.64 |
- |
Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) |
0.02 |
M3 |
10.149.718,50 |
202.994,37 |
24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
0.07 |
M3 |
9.262.468,50 |
648.372,80 |
24.1.4.73 |
- |
Pekerjaan Dinding Beton Bertulang (200 kg besi + Bekisting) |
0.93 |
M3 |
9.535.844,42 |
8.868.335,38 |
24.1.4.74 |
- |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
0.78 |
M3 |
8.648.594,42 |
6.745.903,40 |
24.1.6.4 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1 bata |
0.03 |
M2 |
310.998,21 |
9.329,95 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
1.79 |
M2 |
99.416,60 |
177.955,71 |
24.1.6.22 |
- |
Plesteran Ciprat 1 Pc : 2PS |
0.05 |
M2 |
80.766,60 |
4.038,33 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
3.84 |
M |
40.230,50 |
154.485,11 |
24.1.7.8 |
- |
Pengecatan Besi |
0.25 |
M2 |
53.052,00 |
13.263,00 |
24.1.14.7 |
- |
Pekerjaan Besi Pipa Galvanis 3 " (Medium) |
0.78 |
meter |
89.124,00 |
69.516,72 |
24.2.1.4 |
- |
Pemasangan Paving Blok Tbl.6 segi enam |
0.06 |
M2 |
116.890,00 |
7.013,40 |
24.2.1.5 |
- |
Pemasangan Paving Blok Tbl.8 cm segi enam |
4.88 |
M2 |
132.290,00 |
645.575,22 |
24.2.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
0.31 |
M |
127.630,24 |
39.565,38 |
24.2.1.8 |
- |
Stopper/Uskup tebal 6 cm abu - abu |
0.31 |
M |
50.428,90 |
15.632,96 |
|
|
|
|
|
Nilai ASB |
24.635.168,23 |
| 2020 | 25.2.1.4.1 | Jembatan Bentang 4 m | M2 | 24.635.168,23 | (belum diset) | |