161 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.5 |
Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 2 m |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 27.1.1.5.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 2 m | 500 gr | 0,00 | (belum diset) | |
162 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.5 |
Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 2 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.16 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 3 m |
1 |
M |
1.764.659,81 |
1.764.659,81 |
24.2.2.25 |
- |
Pemasangan Ornamen Lampu PJU panjang 2m |
1 |
buah |
171.430,00 |
171.430,00 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
|
|
|
|
|
Nilai ASB |
3.953.870,91 |
| 2020 | 27.1.1.5.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 2 m | titik | 3.953.870,91 | (belum diset) | |
163 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.7 |
Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 3 m |
|
|
Titik |
|
|
20.1.1.44.1 |
- |
- |
1 |
M |
0,00 |
0,00 |
23.2.2.3.1 |
- |
- |
500 |
VA |
0,00 |
0,00 |
24.8.3.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
0,00 |
0,00 |
24.8.3.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
0,00 |
0,00 |
24.8.3.17 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 4 m |
1 |
M |
0,00 |
0,00 |
24.8.3.26 |
- |
Pemasangan Ornamen Lampu PJU panjang 3m |
1 |
buah |
0,00 |
0,00 |
24.8.3.28 |
- |
Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 27.1.1.7.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 3 m | 500 gr | 0,00 | (belum diset) | |
164 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.7 |
Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 3 m |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 27.1.1.7.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 3 m | 500 gr | 0,00 | (belum diset) | |
165 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.7 |
Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 3 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.17 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 4 m |
1 |
M |
2.350.359,81 |
2.350.359,81 |
24.2.2.26 |
- |
Pemasangan Ornamen Lampu PJU panjang 3m |
1 |
buah |
3.313.930,00 |
3.313.930,00 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
|
|
|
|
|
Nilai ASB |
7.682.070,91 |
| 2020 | 27.1.1.7.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 3 m | titik | 7.682.070,91 | (belum diset) | |
166 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.11 |
Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 6 m |
|
|
Titik |
|
|
20.1.1.44.1 |
- |
- |
1 |
M |
0,00 |
0,00 |
23.2.2.3.1 |
- |
- |
500 |
VA |
0,00 |
0,00 |
24.8.3.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
0,00 |
0,00 |
24.8.3.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
0,00 |
0,00 |
24.8.3.18 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 7,5 m |
1 |
M |
0,00 |
0,00 |
24.8.3.27 |
- |
Pemasangan Ornamen Lampu PJU Panjang 6m |
1 |
buah |
0,00 |
0,00 |
24.8.3.28 |
- |
Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 27.1.1.11.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 6 m | 500 gr | 0,00 | (belum diset) | |
167 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.11 |
Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 6 m |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 27.1.1.11.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 6 m | 500 gr | 0,00 | (belum diset) | |
168 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.11 |
Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 6 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.18 |
- |
Intalasi 1 Titik Lampu PJU (Tarikan Udara) 7,5 m |
1 |
M |
4.400.309,81 |
4.400.309,81 |
24.2.2.27 |
- |
Pemasangan Ornamen Lampu PJU panjang 6m |
1 |
buah |
2.381.047,52 |
2.381.047,52 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
|
|
|
|
|
Nilai ASB |
8.799.138,43 |
| 2020 | 27.1.1.11.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 6 m | titik | 8.799.138,43 | (belum diset) | |
169 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.21 |
Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) |
|
|
Titik |
|
|
20.1.1.44.1 |
- |
- |
1 |
M |
0,00 |
0,00 |
23.2.2.3.1 |
- |
- |
500 |
VA |
0,00 |
0,00 |
24.8.3.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
0,00 |
0,00 |
24.8.3.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
0,00 |
0,00 |
24.8.3.22 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m |
1 |
M |
0,00 |
0,00 |
24.8.3.28 |
- |
Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
0,00 |
0,00 |
24.8.3.49 |
- |
Pondasi Strous PJU |
1 |
titik |
0,00 |
0,00 |
24.8.3.55 |
- |
Pemasangan Tiang Oktagonal 9 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 27.1.1.21.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) | 500 gr | 0,00 | (belum diset) | |
170 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.21 |
Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 27.1.1.21.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) | 500 gr | 0,00 | (belum diset) | |
171 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.21 |
Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.22 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m |
1 |
M |
10.550.159,81 |
10.550.159,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.55 |
- |
Pemasangan Tiang Oktagonal 9 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
6.994.859,00 |
6.994.859,00 |
|
|
|
|
|
Nilai ASB |
20.663.208,31 |
| 2020 | 27.1.1.21.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 1-9 m (OKTAGONAL) | titik | 20.663.208,31 | (belum diset) | |
172 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.24 |
Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) |
|
|
Titik |
|
|
20.1.1.44.1 |
- |
- |
1 |
M |
0,00 |
0,00 |
23.2.2.3.1 |
- |
- |
1000 |
VA |
0,00 |
0,00 |
24.8.3.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
0,00 |
0,00 |
24.8.3.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
0,00 |
0,00 |
24.8.3.28 |
- |
Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
2 |
unit |
0,00 |
0,00 |
24.8.3.49 |
- |
Pondasi Strous PJU |
1 |
titik |
0,00 |
0,00 |
24.8.3.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
0,00 |
0,00 |
25.1.1.2 |
- |
- |
1 |
M |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 27.1.1.24.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) | 500 gr | 0,00 | (belum diset) | |
173 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.24 |
Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 27.1.1.24.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) | 500 gr | 0,00 | (belum diset) | |
174 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.24 |
Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
2 |
unit |
218.975,00 |
437.950,00 |
24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
24.2.2.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
5.692.159,00 |
5.692.159,00 |
|
|
|
|
|
Nilai ASB |
24.557.933,31 |
| 2020 | 27.1.1.24.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Tiang cab 2-9 m (OKTAGONAL) | titik | 24.557.933,31 | (belum diset) | |
175 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.8 |
Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 3 m |
|
|
Titik |
|
|
20.1.1.44.1 |
- |
- |
1 |
M |
0,00 |
0,00 |
23.2.2.3.1 |
- |
- |
800 |
VA |
0,00 |
0,00 |
24.8.3.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
0,00 |
0,00 |
24.8.3.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
0,00 |
0,00 |
24.8.3.17 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 4 m |
1 |
M |
0,00 |
0,00 |
24.8.3.26 |
- |
Pemasangan Ornamen Lampu PJU panjang 3m |
1 |
buah |
0,00 |
0,00 |
24.8.3.28 |
- |
Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.45 |
- |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 27.1.1.8.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 3 m | 500 gr | 0,00 | (belum diset) | |
176 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.8 |
Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 3 m |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 27.1.1.8.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 3 m | 500 gr | 0,00 | (belum diset) | |
177 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.8 |
Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 3 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.17 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 4 m |
1 |
M |
2.350.359,81 |
2.350.359,81 |
24.2.2.26 |
- |
Pemasangan Ornamen Lampu PJU panjang 3m |
1 |
buah |
3.313.930,00 |
3.313.930,00 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.45 |
- |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
|
|
|
|
|
Nilai ASB |
7.682.070,91 |
| 2020 | 27.1.1.8.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 3 m | titik | 7.682.070,91 | (belum diset) | |
178 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.15 |
Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 6 m |
|
|
Titik |
|
|
20.1.1.44.1 |
- |
- |
1 |
M |
0,00 |
0,00 |
23.2.2.3.1 |
- |
- |
800 |
VA |
0,00 |
0,00 |
24.8.3.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
0,00 |
0,00 |
24.8.3.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
0,00 |
0,00 |
24.8.3.18 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 7,5 m |
1 |
M |
0,00 |
0,00 |
24.8.3.27 |
- |
Pemasangan Ornamen Lampu PJU Panjang 6m |
1 |
buah |
0,00 |
0,00 |
24.8.3.28 |
- |
Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
0,00 |
0,00 |
24.8.3.45 |
- |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 27.1.1.15.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 6 m | 500 gr | 0,00 | (belum diset) | |
179 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.15 |
Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 6 m |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 27.1.1.15.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 6 m | 500 gr | 0,00 | (belum diset) | |
180 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.15 |
Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 6 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.18 |
- |
Intalasi 1 Titik Lampu PJU (Tarikan Udara) 7,5 m |
1 |
M |
4.400.309,81 |
4.400.309,81 |
24.2.2.27 |
- |
Pemasangan Ornamen Lampu PJU panjang 6m |
1 |
buah |
2.381.047,52 |
2.381.047,52 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.45 |
- |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
|
|
|
|
|
Nilai ASB |
8.799.138,43 |
| 2020 | 27.1.1.15.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 6 m | lipat | 8.799.138,43 | (belum diset) | |