28.4.1.14 |
Pemasangan Rambu Lalu Lintas (90 cm) Engineering Grade serta Papan Tambahan dengan Tiang Overhead Oktagonal |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.14.1 | Pemasangan Rambu Lalu Lintas (90 cm) Engineering Grade serta Papan Tambahan dengan Tiang Overhead Oktagonal | unit | 0,00 | (belum diset) | |
142 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.15 |
Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.15.1 | Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap | unit | 0,00 | (belum diset) | |
143 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.16 |
Pemasangan Papan Peringatan / Himbauan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.16.1 | Pemasangan Papan Peringatan / Himbauan | unit | 0,00 | (belum diset) | |
144 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.17 |
Pemasangan Papan Petunjuk |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.17.1 | Pemasangan Papan Petunjuk | unit | 0,00 | (belum diset) | |
145 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.18 |
Pemasangan penggantian pipa rambu lalu lintas (menggunakan flenders) |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.18.1 | Pemasangan penggantian pipa rambu lalu lintas (menggunakan flenders) | unit | 0,00 | (belum diset) | |
146 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.19 |
Pemasangan Rambu Elektronik Solar Cell |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.19.1 | Pemasangan Rambu Elektronik Solar Cell | unit | 0,00 | (belum diset) | |
147 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.20 |
Pemasangan Tiang Rambu Ganda |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.20.1 | Pemasangan Tiang Rambu Ganda | unit | 0,00 | (belum diset) | |
148 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.21 |
Pembuatan Palang Kuda dr Pipa Besi Hitam Dia. 2.5" |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.21.1 | Pembuatan Palang Kuda dr Pipa Besi Hitam Dia. 2.5" | unit | 0,00 | (belum diset) | |
149 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.22 |
Pembuatan Palang Kuda - kuda untuk Car Free Day |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.22.1 | Pembuatan Palang Kuda - kuda untuk Car Free Day | unit | 0,00 | (belum diset) | |
150 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.23 |
Pemasangan Paku Jalan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.23.1 | Pemasangan Paku Jalan | unit | 0,00 | (belum diset) | |
151 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.24 |
Pemasangan Paku Jalan Solar dengan LED Light dan Capasitor |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.24.1 | Pemasangan Paku Jalan Solar dengan LED Light dan Capasitor | unit | 0,00 | (belum diset) | |
152 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.25 |
Pengecatan Marka Thermoplastik tebal 2 mm |
|
|
Titik |
|
|
22.1.1.1.1.1 |
- |
Glassbead |
0.5 |
kilogram |
24.012,00 |
12.006,00 |
22.1.1.2.1.5 |
- |
Thermoplastic |
4.57 |
Kg |
24.200,00 |
110.594,00 |
23.1.1.4.2.1 |
- |
Pembantu Sopir |
0.014 |
Orang Hari |
114.000,00 |
1.596,00 |
23.2.4.1.1.1 |
- |
Mandor |
0.014 |
Orang Hari |
196.000,00 |
2.744,00 |
23.2.4.1.5.1 |
- |
Tenaga Kasar |
0.0275 |
Orang Hari |
110.000,00 |
3.025,00 |
23.2.4.1.7.1 |
- |
Operator Alat Konstruksi (Excavator) |
0.014 |
Orang Hari |
158.000,00 |
2.212,00 |
23.2.5.12.9.1 |
- |
Sewa Road Marking Machine |
0.05 |
jam |
21.300,00 |
1.065,00 |
|
|
|
|
|
Nilai ASB |
133.242,00 |
| 2018 | 28.4.1.25.1 | Pengecatan Marka Thermoplastik tebal 2 mm | M2 | 133.242,00 | (belum diset) | |
153 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.26 |
Pengecatan Marka Pita Penggaduh dengan Thermoplastik Tebal 10 mm |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.26.1 | Pengecatan Marka Pita Penggaduh dengan Thermoplastik Tebal 10 mm | M2 | 0,00 | (belum diset) | |
154 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.27 |
Pengecatan Marka Jalan Coldplastik |
|
|
Titik |
|
|
22.1.1.1.1.1 |
- |
Glassbead |
1.3393 |
kilogram |
24.012,00 |
32.159,27 |
|
|
|
|
|
Nilai ASB |
32.159,27 |
| 2018 | 28.4.1.27.1 | Pengecatan Marka Jalan Coldplastik | M2 | 32.159,27 | (belum diset) | |
155 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.28 |
Pengecatan Marka Profil |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.28.1 | Pengecatan Marka Profil | M2 | 0,00 | (belum diset) | |
156 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.29 |
Pengadaan Cermin Tikungan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.29.1 | Pengadaan Cermin Tikungan | unit | 0,00 | (belum diset) | |
157 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.30 |
Jasa Pemeliharaan Rambu Lalu Lintas |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.30.1 | Jasa Pemeliharaan Rambu Lalu Lintas | unit | 0,00 | (belum diset) | |
158 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.1 |
Box Panel UPS Alumunium |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.2.1.1 | Box Panel UPS Alumunium | unit | 0,00 | (belum diset) | |
159 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.2 |
Pemasangan Kabel Bawah Tanah dengan System Booring |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.2.2.1 | Pemasangan Kabel Bawah Tanah dengan System Booring | M | 0,00 | (belum diset) | |
160 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.3 |
Pekerjaan Pembuatan Pondasi Traffic Light Pendirian Tiang dan Instalasi Kabel |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.2.3.1 | Pekerjaan Pembuatan Pondasi Traffic Light Pendirian Tiang dan Instalasi Kabel | unit | 0,00 | (belum diset) | |