141 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.1 |
Pembuatan Jalan Baru Kolektor Tipe 2 |
|
|
Titik |
|
|
24.1.2.7 |
- |
Penggalian Tanah dengan Alat Berat |
1.3 |
M3 |
109.087,70 |
141.814,01 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.3 |
M3 |
166.100,00 |
215.929,99 |
24.2.3.38 |
- |
Lapis Pondasi Aggregat Kelas A |
0.325 |
M3 |
908.635,51 |
295.306,53 |
24.2.3.39 |
- |
Lapis Pondasi Aggregat Kelas B |
0.4 |
M3 |
819.094,10 |
327.637,64 |
24.2.3.48 |
- |
Lapis Pondasi Aggregat Kelas C |
0.5 |
M3 |
737.720,79 |
368.860,39 |
24.2.3.83 |
- |
LasTon Lapis Aus (AC-WC) |
0.09 |
ton |
1.622.513,66 |
146.026,24 |
24.2.3.87 |
- |
LasTon Lapis Antara (AC-BC) |
0.135 |
ton |
1.502.092,25 |
202.782,46 |
|
|
|
|
|
Nilai ASB |
1.698.357,27 |
| 2020 | 25.1.1.1.4 | Pembuatan Jalan Baru Kolektor Tipe 2 | M2 | 1.698.357,27 | (belum diset) | |
142 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.2.1.1 |
Sumur Kebakaran |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.1158 |
M1 |
113.758,40 |
13.173,22 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
1.2677 |
M3 |
118.270,00 |
149.930,87 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.5011 |
M3 |
85.740,00 |
42.964,31 |
24.1.2.17 |
- |
Pengangkutan Tanah dari Lubang Galian yg dalamnya > 1 m |
0.7503 |
M3 |
40.285,00 |
30.225,84 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.0517 |
M3 |
281.590,28 |
14.558,22 |
24.1.3.3 |
- |
Pemasangan Turap Bambu tinggi 2,75 m |
1.0349 |
M1 |
565.992,31 |
585.745,41 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.0259 |
M3 |
568.825,93 |
14.732,59 |
24.1.4.43 |
- |
Beton mutu f'c 31,2 Mpa (K-350), slump (12±2) cm. w/c=0,48, dengan Molen |
0.3125 |
M3 |
2.201.588,97 |
687.996,55 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
0.9744 |
kilogram |
23.886,93 |
23.275,42 |
24.1.4.77 |
- |
Pekerjaan Kolom Praktis (11 x 11 cm) |
0.0024 |
M1 |
134.625,10 |
323,10 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
0.8279 |
M |
40.230,50 |
33.306,83 |
24.1.7.12 |
- |
Pengecatan Dinding Luar Baru |
0.0234 |
M2 |
57.917,56 |
1.355,27 |
24.1.12.13 |
- |
Pemasangan Saluran Pipa diameter 4'' |
0.0289 |
meter |
68.233,88 |
1.971,96 |
117.1.1.1.22.262 |
- |
Pekerjaan Fabrikasi dan Elektroda Besi Siku |
2.0905 |
Kg |
39.400,00 |
82.365,70 |
|
|
|
|
|
Nilai ASB |
1.681.925,31 |
| 2020 | 28.2.1.1.1 | Sumur Kebakaran | M3 | 1.681.925,31 | (belum diset) | |
143 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.5 |
Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.825 |
M2 |
2.011.392,60 |
1.659.398,87 |
|
|
|
|
|
Nilai ASB |
1.659.398,87 |
| 2020 | 28.4.1.5.1 | Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan | unit | 1.659.398,87 | (belum diset) | |
144 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.7 |
Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.825 |
M2 |
2.011.392,60 |
1.659.398,87 |
|
|
|
|
|
Nilai ASB |
1.659.398,87 |
| 2020 | 28.4.1.7.1 | Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan | unit | 1.659.398,87 | (belum diset) | |
145 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.3.3.1 |
Saluran Terbuka - Beton 100/120 |
|
|
Titik |
|
|
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
1 |
M2 |
8.975,66 |
8.975,66 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.2 |
M3 |
166.100,00 |
199.320,01 |
24.1.4.16 |
- |
Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, Ready Mix |
0.43 |
M3 |
1.623.341,97 |
698.037,06 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
6.58 |
kilogram |
23.046,93 |
151.648,79 |
24.1.4.50 |
- |
Bekisting untuk Pondasi |
1.105 |
M2 |
402.621,99 |
444.897,31 |
24.2.3.2 |
- |
Galian untuk Selokan Drainase dan Saluran air tanpa Excavator |
1.2 |
M3 |
124.981,96 |
149.978,35 |
|
|
|
|
|
Nilai ASB |
1.652.857,18 |
| 2020 | 25.3.3.1.3 | Saluran Terbuka - Beton 100/120 | M | 1.652.857,18 | (belum diset) | |
146 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.3.3.2 |
Saluran Tertutup - Beton 80/100 |
|
|
Titik |
|
|
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
0.8 |
M2 |
8.975,66 |
7.180,53 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
0.8 |
M3 |
166.100,00 |
132.880,00 |
24.1.4.16 |
- |
Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, Ready Mix |
0.43 |
M3 |
1.623.341,97 |
698.037,06 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
6.682 |
kilogram |
23.046,93 |
153.999,59 |
24.1.4.50 |
- |
Bekisting untuk Pondasi |
1.3 |
M2 |
402.621,99 |
523.408,57 |
24.2.3.2 |
- |
Galian untuk Selokan Drainase dan Saluran air tanpa Excavator |
0.8 |
M3 |
124.981,96 |
99.985,57 |
|
|
|
|
|
Nilai ASB |
1.615.491,31 |
| 2020 | 25.3.3.2.1 | Saluran Tertutup - Beton 80/100 | M | 1.615.491,31 | (belum diset) | |
147 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.3.5 |
Konstruksi Jalan Paving Baru Lebar 6m (tbl. 6 cm) |
|
|
Titik |
|
|
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
0.6 |
M2 |
12.710,00 |
7.626,00 |
24.1.2.4 |
- |
Penggalian Tanah Cadas/Rabat sedalam s.d. 1 m |
0.04 |
M3 |
238.608,00 |
9.544,32 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.3 |
M3 |
471.628,02 |
141.488,41 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
0.003 |
M3 |
166.100,00 |
498,30 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.6 |
M3 |
281.590,28 |
168.954,17 |
24.1.6.22 |
- |
Plesteran Ciprat 1 Pc : 2PS |
0.3 |
M2 |
80.766,60 |
24.229,98 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
6.1 |
M2 |
116.890,00 |
713.028,99 |
24.2.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
3.2 |
M |
127.630,24 |
408.416,78 |
24.2.1.10 |
- |
Stopper/Uskup tebal 6 cm warna |
2.92 |
M |
48.424,90 |
141.400,71 |
|
|
|
|
|
Nilai ASB |
1.615.187,67 |
| 2020 | 25.1.3.5.1 | Konstruksi Jalan Paving Baru Lebar 6m (tbl. 6 cm) | M | 1.615.187,67 | (belum diset) | |
148 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.2.2.1 |
Jembatan Box Culvert |
|
|
Titik |
|
|
24.1.2.4 |
- |
Penggalian Tanah Cadas/Rabat sedalam s.d. 1 m |
0.81 |
M3 |
238.608,00 |
193.272,48 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
0.81 |
M3 |
166.100,00 |
134.541,00 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.27 |
M3 |
281.590,28 |
76.029,38 |
24.1.3.8 |
- |
Pembuatan KISDAM tinggi 1,5m tebal 0,6 m |
0.15 |
M1 |
459.423,50 |
68.913,53 |
24.1.4.3 |
- |
Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, dengan Molen |
0.13 |
M3 |
1.689.836,57 |
219.678,75 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.01 |
M3 |
1.943.652,28 |
19.436,52 |
24.1.4.43 |
- |
Beton mutu f'c 31,2 Mpa (K-350), slump (12±2) cm. w/c=0,48, dengan Molen |
0.05 |
M3 |
2.201.588,97 |
110.079,45 |
24.1.6.17 |
- |
Plesteran Halus 1 Pc : 3 Ps tebal 1.5 cm |
0.05 |
M2 |
102.869,90 |
5.143,50 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
0.14 |
M |
40.230,50 |
5.632,27 |
24.2.3.38 |
- |
Lapis Pondasi Aggregat Kelas A |
0.37 |
M3 |
908.635,51 |
336.195,14 |
24.2.3.72 |
- |
Lapis Resap Pengikat - Aspal Cair |
2.91 |
liter |
16.390,10 |
47.695,19 |
24.2.3.83 |
- |
LasTon Lapis Aus (AC-WC) |
0.19 |
ton |
1.622.513,66 |
308.277,59 |
24.2.5.1 |
- |
Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk |
1.1 |
M1 |
75.306,94 |
82.837,64 |
|
|
|
|
|
Nilai ASB |
1.607.732,44 |
| 2020 | 25.2.2.1.1 | Jembatan Box Culvert | M2 | 1.607.732,44 | (belum diset) | |
149 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.1 |
Pembuatan Jalan Baru Kolektor Tipe 1 |
|
|
Titik |
|
|
24.1.2.7 |
- |
Penggalian Tanah dengan Alat Berat |
1.28 |
M3 |
109.087,70 |
139.632,25 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.28 |
M3 |
166.100,00 |
212.608,00 |
24.2.3.38 |
- |
Lapis Pondasi Aggregat Kelas A |
0.325 |
M3 |
908.635,51 |
295.306,53 |
24.2.3.39 |
- |
Lapis Pondasi Aggregat Kelas B |
0.4 |
M3 |
819.094,10 |
327.637,64 |
24.2.3.48 |
- |
Lapis Pondasi Aggregat Kelas C |
0.4 |
M3 |
737.720,79 |
295.088,32 |
24.2.3.83 |
- |
LasTon Lapis Aus (AC-WC) |
0.09 |
ton |
1.622.513,66 |
146.026,24 |
24.2.3.87 |
- |
LasTon Lapis Antara (AC-BC) |
0.09 |
ton |
1.502.092,25 |
135.188,31 |
|
|
|
|
|
Nilai ASB |
1.551.487,29 |
| 2020 | 25.1.1.1.3 | Pembuatan Jalan Baru Kolektor Tipe 1 | M2 | 1.551.487,29 | (belum diset) | |
150 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.1 |
Pembuatan Jalan Baru Lokal Tipe 1 |
|
|
Titik |
|
|
24.1.2.7 |
- |
Penggalian Tanah dengan Alat Berat |
1.18 |
M3 |
109.087,70 |
128.723,48 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.18 |
M3 |
166.100,00 |
195.997,99 |
24.2.3.38 |
- |
Lapis Pondasi Aggregat Kelas A |
0.325 |
M3 |
908.635,51 |
295.306,53 |
24.2.3.39 |
- |
Lapis Pondasi Aggregat Kelas B |
0.4 |
M3 |
819.094,10 |
327.637,64 |
24.2.3.48 |
- |
Lapis Pondasi Aggregat Kelas C |
0.4 |
M3 |
737.720,79 |
295.088,32 |
24.2.3.83 |
- |
LasTon Lapis Aus (AC-WC) |
0.09 |
ton |
1.622.513,66 |
146.026,24 |
24.2.3.87 |
- |
LasTon Lapis Antara (AC-BC) |
0.09 |
ton |
1.502.092,25 |
135.188,31 |
|
|
|
|
|
Nilai ASB |
1.523.968,51 |
| 2020 | 25.1.1.1.1 | Pembuatan Jalan Baru Lokal Tipe 1 | M2 | 1.523.968,51 | (belum diset) | |
151 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.1 |
Box Panel UPS Alumunium |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.2475 |
M3 |
157.417,60 |
38.960,86 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.27 |
M3 |
1.943.652,28 |
524.786,14 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
4 |
kilogram |
23.046,93 |
92.187,72 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
10.37 |
kilogram |
23.886,93 |
247.707,45 |
24.1.4.50 |
- |
Bekisting untuk Pondasi |
0.3 |
M2 |
402.621,99 |
120.786,60 |
24.1.9.40 |
- |
Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh |
1 |
M1 |
88.017,30 |
88.017,30 |
117.1.3.8.1.35 |
- |
Kabel NYFGbY 4 x 6 mm |
5 |
meter |
80.100,00 |
400.500,00 |
|
|
|
|
|
Nilai ASB |
1.512.946,07 |
| 2020 | 28.4.2.1.1 | Box Panel UPS Alumunium | unit | 1.512.946,07 | (belum diset) | |
152 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.2.2.6 |
Rehabilitasi Pagar Makam Dengan Precast Pagar Panel / Pabrikasi |
|
|
Titik |
|
|
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.1.13 |
- |
Pekerjaan Pembongkaran Dinding Tembok Bata |
0.1017 |
M3 |
1.074.247,97 |
109.251,02 |
24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
0.15 |
M3 |
9.262.468,50 |
1.389.370,33 |
|
|
|
|
|
Nilai ASB |
1.511.331,35 |
| 2020 | 27.2.2.6.1 | Rehabilitasi Pagar Makam Dengan Precast Pagar Panel / Pabrikasi | M1 | 1.511.331,35 | (belum diset) | |
153 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.2.1 |
Pemeliharaan LPS Landasan Rigid |
|
|
Titik |
|
|
25.1.2.1.6 |
- |
Pembangunan LPS Landasan Rigid |
0.3 |
M2 |
4.989.653,19 |
1.496.896,02 |
|
|
|
|
|
Nilai ASB |
1.496.896,02 |
| 2020 | 25.1.2.1.7 | Pemeliharaan LPS Landasan Rigid | M2 | 1.496.896,02 | (belum diset) | |
154 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.3.2 |
Konstruksi Jalan Paving Baru Lebar 3m (tbl. 6 cm) |
|
|
Titik |
|
|
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
0.3 |
M2 |
12.710,00 |
3.813,00 |
24.1.2.4 |
- |
Penggalian Tanah Cadas/Rabat sedalam s.d. 1 m |
0.03 |
M3 |
238.608,00 |
7.158,24 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.2 |
M3 |
471.628,02 |
94.325,61 |
24.1.2.14 |
- |
Penimbunan Sirtu dan Pemadatan menggunakan Alat Berat |
0.3 |
M3 |
605.591,02 |
181.677,31 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
0.003 |
M3 |
166.100,00 |
498,30 |
24.1.6.22 |
- |
Plesteran Ciprat 1 Pc : 2PS |
0.2 |
M2 |
80.766,60 |
16.153,32 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
5.7 |
M2 |
116.890,00 |
666.272,98 |
24.2.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
2.6 |
M |
127.630,24 |
331.838,62 |
24.2.1.10 |
- |
Stopper/Uskup tebal 6 cm warna |
2.32 |
M |
48.424,90 |
112.345,76 |
|
|
|
|
|
Nilai ASB |
1.414.083,14 |
| 2020 | 25.1.3.2.1 | Konstruksi Jalan Paving Baru Lebar 3m (tbl. 6 cm) | M | 1.414.083,14 | (belum diset) | |
155 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.3.1.1 |
Pembuatan Pagar Dinding Bata |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.089 |
M1 |
113.758,40 |
10.124,50 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.42 |
M3 |
118.270,00 |
49.673,40 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.4136 |
M3 |
85.740,00 |
35.462,06 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
0.222 |
titik |
193.385,05 |
42.931,48 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
1 |
kilogram |
23.886,93 |
23.886,93 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.03 |
M3 |
7.944.915,55 |
238.347,46 |
24.1.4.64 |
- |
Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) |
0.0222 |
M3 |
10.149.718,50 |
225.323,75 |
24.1.4.68 |
- |
Pekerjaan Kolom Beton Bertulang (300 kg besi + Bekisting) |
0.0002 |
M3 |
13.040.231,56 |
2.608,05 |
24.1.6.7 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1/2 bata |
0.435 |
M2 |
155.098,30 |
67.467,76 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
1.3164 |
M2 |
99.416,60 |
130.872,02 |
24.1.6.25 |
- |
Pemasangan acian |
1.3164 |
M2 |
60.790,00 |
80.023,96 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
5.64 |
M |
40.230,50 |
226.900,01 |
24.1.14.5 |
- |
Pekerjaan Besi Pipa Galvanis 2 " (Medium) |
0.5 |
meter |
59.416,00 |
29.708,00 |
24.2.3.17 |
- |
Pasangan Batu tanpa Adukan (Aanstamping) |
0.267 |
M3 |
624.945,01 |
166.860,31 |
|
|
|
|
|
Nilai ASB |
1.330.189,69 |
| 2020 | 27.3.1.1.1 | Pembuatan Pagar Dinding Bata | M1 | 1.330.189,69 | (belum diset) | |
156 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.3.1.1 |
Saluran Batu kali 40/60 |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
1.2825 |
M3 |
118.270,00 |
151.681,28 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.261 |
M3 |
85.740,00 |
22.378,14 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.4275 |
M3 |
471.628,02 |
201.620,98 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.0215 |
M3 |
166.100,00 |
169.671,15 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.3 |
M3 |
1.390.242,02 |
417.072,62 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
1 |
M2 |
99.416,60 |
99.416,60 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
1 |
meter |
105.933,20 |
105.933,20 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
2 |
buah |
22.941,10 |
45.882,20 |
24.2.3.17 |
- |
Pasangan Batu tanpa Adukan (Aanstamping) |
0.171 |
M3 |
624.945,01 |
106.865,60 |
|
|
|
|
|
Nilai ASB |
1.320.521,77 |
| 2020 | 25.3.1.1.1 | Saluran Batu kali 40/60 | M | 1.320.521,77 | (belum diset) | |
157 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.1 |
Pembangunan Wall Climbing |
|
|
Titik |
|
|
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
1 |
M2 |
8.975,66 |
8.975,66 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.125 |
M3 |
118.270,00 |
14.783,75 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.025 |
M3 |
471.628,02 |
11.790,70 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
0.1111 |
titik |
232.058,65 |
25.781,72 |
24.1.3.25 |
- |
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) |
0.0157 |
M3 |
1.054.854,31 |
16.561,21 |
24.1.4.15 |
- |
Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, dengan Molen |
0.0125 |
M3 |
1.830.876,03 |
22.885,95 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.1191 |
M3 |
6.383.804,41 |
760.311,09 |
24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
0.0068 |
M3 |
9.262.468,50 |
62.984,79 |
24.1.7.8 |
- |
Pengecatan Besi |
3.547 |
M2 |
53.052,00 |
188.175,44 |
24.1.7.10 |
- |
Pengecatan Dasar Meni Besi |
3.547 |
M2 |
50.512,00 |
179.166,06 |
132.3.2.13.1.96 |
- |
Air Kerja |
450 |
liter |
36,00 |
16.200,00 |
|
|
|
|
|
Nilai ASB |
1.320.326,37 |
| 2020 | 28.3.1.1.1 | Pembangunan Wall Climbing | M2 | 1.320.326,37 | (belum diset) | |
158 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.2 |
Rambu Lalu Lintas (60 cm) Engineering Grade papan tambahan dan umpak beton |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.12 |
M3 |
1.943.652,28 |
233.238,27 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.54 |
M2 |
2.011.392,60 |
1.086.152,05 |
|
|
|
|
|
Nilai ASB |
1.319.390,31 |
| 2020 | 28.4.1.2.1 | Rambu Lalu Lintas (60 cm) Engineering Grade papan tambahan dan umpak beton | unit | 1.319.390,31 | (belum diset) | |
159 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.4 |
Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan dan Umpak Beton |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.12 |
M3 |
1.943.652,28 |
233.238,27 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.54 |
M2 |
2.011.392,60 |
1.086.152,05 |
|
|
|
|
|
Nilai ASB |
1.319.390,31 |
| 2020 | 28.4.1.4.1 | Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan dan Umpak Beton | unit | 1.319.390,31 | (belum diset) | |
160 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.3.3.1 |
Saluran Terbuka - Beton 80/100 |
|
|
Titik |
|
|
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
0.8 |
M2 |
8.975,66 |
7.180,53 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
0.8 |
M3 |
166.100,00 |
132.880,00 |
24.1.4.16 |
- |
Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, Ready Mix |
0.35 |
M3 |
1.623.341,97 |
568.169,68 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
5.24 |
kilogram |
23.046,93 |
120.765,90 |
24.1.4.50 |
- |
Bekisting untuk Pondasi |
0.9 |
M2 |
402.621,99 |
362.359,78 |
24.2.3.2 |
- |
Galian untuk Selokan Drainase dan Saluran air tanpa Excavator |
0.8 |
M3 |
124.981,96 |
99.985,57 |
|
|
|
|
|
Nilai ASB |
1.291.341,46 |
| 2020 | 25.3.3.1.2 | Saluran Terbuka - Beton 80/100 | M | 1.291.341,46 | (belum diset) | |