121 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.4 |
PEKERJAAN PEMBUATAN LAPANGAN BOLA VOLLEY (11X22m) |
|
|
Titik |
|
|
24.1.1.4 |
- |
- |
0.0496 |
M1 |
0,00 |
0,00 |
24.1.1.7 |
- |
- |
0.0541 |
M2 |
0,00 |
0,00 |
24.1.2.1 |
- |
Pembersihan Lapangan dan Perataan Tanah |
0.0157 |
M3 |
0,00 |
0,00 |
24.1.2.9 |
- |
Galian Tanah Cadas/Rabat |
0.0007 |
M3 |
0,00 |
0,00 |
24.1.2.11 |
- |
Penggalian Lumpur dengan Alat Berat |
0.0049 |
M3 |
0,00 |
0,00 |
24.1.4.3 |
- |
- |
0.0001 |
M3 |
0,00 |
0,00 |
24.1.4.23 |
- |
- |
0.0049 |
M3 |
0,00 |
0,00 |
24.1.4.57 |
- |
- |
0.001 |
M3 |
0,00 |
0,00 |
24.1.4.60 |
- |
- |
0.0095 |
M3 |
0,00 |
0,00 |
24.1.4.74 |
- |
- |
0.03 |
M3 |
0,00 |
0,00 |
24.1.7.8 |
- |
- |
0.0331 |
M2 |
0,00 |
0,00 |
24.1.7.13 |
- |
- |
2.06 |
M2 |
0,00 |
0,00 |
24.1.8.19 |
- |
- |
0.2 |
M2 |
0,00 |
0,00 |
24.1.11.1 |
- |
- |
0.0083 |
titik |
0,00 |
0,00 |
24.1.14.5 |
- |
- |
0.0165 |
meter |
0,00 |
0,00 |
24.1.14.7 |
- |
- |
0.0562 |
meter |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.3.1.4.1 | PEKERJAAN PEMBUATAN LAPANGAN BOLA VOLLEY (11X22m) | M2 | 0,00 | (belum diset) | |
122 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.5 |
Pembangunan Lapangan Olahraga Futsal Besar (45x28m) |
|
|
Titik |
|
|
24.1.2.1 |
- |
Pembersihan Lapangan dan Perataan Tanah |
0.0208 |
M3 |
0,00 |
0,00 |
24.1.2.9 |
- |
Galian Tanah Cadas/Rabat |
0.0041 |
M3 |
0,00 |
0,00 |
24.1.2.11 |
- |
Penggalian Lumpur dengan Alat Berat |
0.0023 |
M3 |
0,00 |
0,00 |
24.1.2.22 |
- |
Pemadatan Tanah |
0.067 |
M3 |
0,00 |
0,00 |
24.1.4.11 |
- |
- |
0.0013 |
M3 |
0,00 |
0,00 |
24.1.4.15 |
- |
- |
0.0007 |
M3 |
0,00 |
0,00 |
24.1.4.27 |
- |
- |
0.174 |
M3 |
0,00 |
0,00 |
24.1.4.57 |
- |
- |
0.0044 |
M3 |
0,00 |
0,00 |
24.1.4.60 |
- |
- |
0.0078 |
M3 |
0,00 |
0,00 |
24.1.7.4 |
- |
- |
0.2366 |
M2 |
0,00 |
0,00 |
24.1.8.19 |
- |
- |
0.5 |
M2 |
0,00 |
0,00 |
24.1.10.23 |
- |
- |
0.005 |
stel |
0,00 |
0,00 |
24.1.10.37 |
- |
- |
0.347 |
M2 |
0,00 |
0,00 |
24.1.11.2 |
- |
- |
0.0024 |
titik |
0,00 |
0,00 |
24.1.12.26 |
- |
- |
0.486 |
meter |
0,00 |
0,00 |
24.2.2.70 |
- |
- |
0.02 |
M2 |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.3.1.5.1 | Pembangunan Lapangan Olahraga Futsal Besar (45x28m) | M2 | 0,00 | (belum diset) | |
123 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.6 |
PEKERJAAN PEMBUATAN LAPANGAN BULUTANGKIS (16,4X8,1m) |
|
|
Titik |
|
|
24.1.1.4 |
- |
- |
0.0903 |
M1 |
0,00 |
0,00 |
24.1.1.7 |
- |
- |
0.1075 |
M2 |
0,00 |
0,00 |
24.1.2.1 |
- |
Pembersihan Lapangan dan Perataan Tanah |
0.0094 |
M3 |
0,00 |
0,00 |
24.1.2.9 |
- |
Galian Tanah Cadas/Rabat |
0.0901 |
M3 |
0,00 |
0,00 |
24.1.4.23 |
- |
- |
0.0021 |
M3 |
0,00 |
0,00 |
24.1.4.57 |
- |
- |
0.0027 |
M3 |
0,00 |
0,00 |
24.1.4.60 |
- |
- |
0.0159 |
M3 |
0,00 |
0,00 |
24.1.4.74 |
- |
- |
0.0252 |
M3 |
0,00 |
0,00 |
24.1.6.3 |
- |
- |
0.0011 |
M2 |
0,00 |
0,00 |
24.1.6.7 |
- |
- |
0.012 |
M2 |
0,00 |
0,00 |
24.1.6.18 |
- |
- |
0.0354 |
M2 |
0,00 |
0,00 |
24.1.6.25 |
- |
- |
0.0354 |
M2 |
0,00 |
0,00 |
24.1.6.26 |
- |
- |
0.2 |
M |
0,00 |
0,00 |
24.1.7.8 |
- |
- |
0.1564 |
M2 |
0,00 |
0,00 |
24.1.7.12 |
- |
- |
0.0354 |
M2 |
0,00 |
0,00 |
24.1.8.19 |
- |
- |
0.1 |
M2 |
0,00 |
0,00 |
24.1.11.1 |
- |
- |
0.0151 |
titik |
0,00 |
0,00 |
24.1.14.5 |
- |
- |
0.1152 |
meter |
0,00 |
0,00 |
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.3.1.6.1 | PEKERJAAN PEMBUATAN LAPANGAN BULUTANGKIS (16,4X8,1m) | M2 | 0,00 | (belum diset) | |
124 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.7 |
Pembangunan Lapangan Olahraga Futsal Kecil (28x18m) |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.3.1.7.1 | Pembangunan Lapangan Olahraga Futsal Kecil (28x18m) | M2 | 0,00 | (belum diset) | |
125 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.8 |
Pembangunan Lapangan Olahraga Sepak Bola Konvensional ukuran 50m x 100m |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.3.1.8.1 | Pembangunan Lapangan Olahraga Sepak Bola Konvensional ukuran 50m x 100m | M2 | 0,00 | (belum diset) | |
126 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.9 |
Pembangunan Lapangan Olahraga Tenis dan Pagar |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.3.1.9.1 | Pembangunan Lapangan Olahraga Tenis dan Pagar | M2 | 0,00 | (belum diset) | |
127 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.10 |
Sumur Buis Beton diameter 80 cm |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.3.1.10.1 | Sumur Buis Beton diameter 80 cm | 500 gr | 0,00 | (belum diset) | |
128 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.1 |
Rambu Lalu Lintas (75 cm) Engineering Grade papan tambahan dan umpak beton |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.1.1 | Rambu Lalu Lintas (75 cm) Engineering Grade papan tambahan dan umpak beton | unit | 0,00 | (belum diset) | |
129 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.2 |
Rambu Lalu Lintas (60 cm) Engineering Grade papan tambahan dan umpak beton |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.2.1 | Rambu Lalu Lintas (60 cm) Engineering Grade papan tambahan dan umpak beton | unit | 0,00 | (belum diset) | |
130 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.3 |
Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan dan Umpak Beton |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.3.1 | Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan dan Umpak Beton | unit | 0,00 | (belum diset) | |
131 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.4 |
Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan dan Umpak Beton |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.4.1 | Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan dan Umpak Beton | unit | 0,00 | (belum diset) | |
132 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.5 |
Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.5.1 | Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
133 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.6 |
Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.6.1 | Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
134 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.7 |
Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.7.1 | Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
135 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.8 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.8.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
136 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.9 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.9.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade | unit | 0,00 | (belum diset) | |
137 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.10 |
Klem Galvanis Rambu Include Mur Baut |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.10.1 | Klem Galvanis Rambu Include Mur Baut | unit | 0,00 | (belum diset) | |
138 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.11 |
Pemasangan Tiang dan rambu RPPJ 2 m x 3 m |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.11.1 | Pemasangan Tiang dan rambu RPPJ 2 m x 3 m | unit | 0,00 | (belum diset) | |
139 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.12 |
Pemasangan Rambu RPPJ 2 m x 3 m |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.12.1 | Pemasangan Rambu RPPJ 2 m x 3 m | unit | 0,00 | (belum diset) | |
140 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.13 |
Pemasangan RPPJ Oktagonal Kantilever 1,8 x 1,2 m dengan scotch light engineering grade perismatik |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2018 | 28.4.1.13.1 | Pemasangan RPPJ Oktagonal Kantilever 1,8 x 1,2 m dengan scotch light engineering grade perismatik | unit | 0,00 | (belum diset) | |