121 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.2.1 |
Rigid Pavements Tipe A3 |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.65 |
M3 |
157.417,60 |
102.321,44 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0125 |
M3 |
471.628,02 |
5.895,35 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.1 |
M3 |
281.590,28 |
28.159,03 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.1 |
M3 |
568.825,93 |
56.882,59 |
24.1.4.43 |
- |
Beton mutu f'c 31,2 Mpa (K-350), slump (12±2) cm. w/c=0,48, dengan Molen |
0.25 |
M3 |
2.201.588,97 |
550.397,24 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
1.5642 |
kilogram |
23.886,93 |
37.363,94 |
24.1.4.54 |
- |
Bekisting untuk Lantai |
0.022 |
M2 |
748.608,00 |
16.469,38 |
24.1.6.6 |
- |
Dinding Batu Merah 1 Pc : 3 Pp tebal 1/2 bata |
1 |
M2 |
162.020,00 |
162.020,00 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
0.25 |
M2 |
116.890,00 |
29.222,50 |
24.2.3.38 |
- |
Lapis Pondasi Aggregat Kelas A |
0.3 |
M3 |
908.635,51 |
272.590,67 |
24.2.3.39 |
- |
Lapis Pondasi Aggregat Kelas B |
0.4 |
M3 |
819.094,10 |
327.637,64 |
24.2.3.48 |
- |
Lapis Pondasi Aggregat Kelas C |
0.5 |
M3 |
737.720,79 |
368.860,39 |
24.2.3.83 |
- |
LasTon Lapis Aus (AC-WC) |
0.135 |
ton |
1.622.513,66 |
219.039,35 |
24.2.3.87 |
- |
LasTon Lapis Antara (AC-BC) |
0.09 |
ton |
1.502.092,25 |
135.188,31 |
24.2.3.96 |
- |
Lapis Permukaan Penetrasi Macadam |
0.05 |
M3 |
2.390.427,20 |
119.521,36 |
24.2.5.25 |
- |
Pembongkaran Beton |
0.25 |
M3 |
546.486,93 |
136.621,73 |
|
|
|
|
|
Nilai ASB |
2.568.190,93 |
| 2020 | 25.1.2.1.5 | Rigid Pavements Tipe A3 | M2 | 2.568.190,93 | (belum diset) | |
122 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 4 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
4 |
M2 |
640.512,49 |
2.562.049,95 |
|
|
|
|
|
Nilai ASB |
2.562.049,95 |
| 2020 | 25.1.1.2.5 | Pemeliharaan Jalan Overlay Lebar 4 m | M1 | 2.562.049,95 | (belum diset) | |
123 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.11 |
Rehabilitasi Kerusakan Ringan Bangunan Tipe B (30%) |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.125 |
M1 |
113.758,40 |
14.219,80 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.3838 |
M3 |
118.270,00 |
45.392,03 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.1221 |
M3 |
85.740,00 |
10.468,85 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0492 |
M3 |
471.628,02 |
23.204,10 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.1221 |
M3 |
1.390.242,02 |
169.748,55 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
0.0085 |
titik |
193.385,05 |
1.643,77 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.0137 |
M3 |
568.825,93 |
7.792,92 |
24.1.4.3 |
- |
Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, dengan Molen |
0.0167 |
M3 |
1.689.836,57 |
28.220,27 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.006 |
M3 |
1.943.652,28 |
11.661,91 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.027 |
M3 |
6.383.804,41 |
172.362,72 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.0083 |
M3 |
7.944.915,55 |
65.942,80 |
24.1.4.64 |
- |
Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) |
0.0062 |
M3 |
10.149.718,50 |
62.928,26 |
24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
0.0108 |
M3 |
9.262.468,50 |
100.034,66 |
24.1.4.77 |
- |
Pekerjaan Kolom Praktis (11 x 11 cm) |
0.0788 |
M1 |
134.625,10 |
10.608,46 |
24.1.6.7 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1/2 bata |
1.0519 |
M2 |
155.098,30 |
163.147,91 |
24.1.6.8 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata |
0.039 |
M2 |
150.726,50 |
5.878,33 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
2.1428 |
M2 |
99.416,60 |
213.029,90 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
0.2775 |
M |
40.230,50 |
11.163,96 |
24.1.7.4 |
- |
Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) |
0.1462 |
M2 |
82.723,10 |
12.094,12 |
24.1.7.7 |
- |
Pengecatan Dinding Dalam Baru |
2.4713 |
M2 |
45.835,85 |
113.274,13 |
24.1.7.12 |
- |
Pengecatan Dinding Luar Baru |
0.3431 |
M2 |
57.917,56 |
19.871,52 |
24.1.8.2 |
- |
Pemasangan Lantai Keramik 20x20 cm |
0.0424 |
M2 |
486.460,50 |
20.625,92 |
24.1.8.5 |
- |
Pemasangan Lantai Keramik ukuran 40x40 cm |
0.2458 |
M2 |
1.423.510,50 |
349.898,89 |
24.1.8.16 |
- |
Dinding Keramik ukuran 20x25 cm |
0.087 |
M2 |
584.363,80 |
50.839,65 |
24.1.9.17 |
- |
Pemasang rangka atap Galvalume 0.75 |
0.2472 |
M2 |
81.466,00 |
20.138,40 |
24.1.9.26 |
- |
Pemasangan Penutup Atap Galvalume |
0.2412 |
M2 |
746.496,53 |
180.054,96 |
24.1.9.29 |
- |
Pemasangan Jurai Genteng Galvalume Tebal 4 mm (m) |
0.0288 |
M1 |
1.159.312,51 |
33.388,20 |
24.1.9.31 |
- |
Pemasangan Listplank Kayu Kelas II |
0.0008 |
M1 |
215.764,84 |
172,61 |
24.1.9.57 |
- |
Pemasangan List plafond Gypsum Profil 4 " |
0.4675 |
M1 |
18.304,80 |
8.557,49 |
24.1.9.64 |
- |
Pemasangan Plafond Kalsiboard Rangka Plafon Metal Furing |
0.3675 |
M2 |
961.757,19 |
353.445,78 |
24.1.10.10 |
- |
Daun Pintu Panil Kayu Kelas II |
0.0425 |
M2 |
1.348.926,99 |
57.329,40 |
24.1.10.14 |
- |
Pemasangan Kaca Mati tebal 5 mm |
0.0176 |
M2 |
326.075,45 |
5.738,93 |
24.1.10.20 |
- |
Pemasangan Kunci Tanam Besar 2x Putar kuningan |
0.03 |
buah |
187.054,00 |
5.611,62 |
24.1.10.23 |
- |
Pemasangan Engsel Kuningan Untuk Pintu |
0.06 |
stel |
124.695,44 |
7.481,73 |
24.1.10.29 |
- |
Pemasangan Hak Angin (Sikutan) |
0.02 |
stel |
64.714,00 |
1.294,28 |
24.1.10.40 |
- |
Pemasangan Daun Pintu PVC |
0.0075 |
buah |
4.879.270,01 |
36.594,52 |
24.1.10.41 |
- |
Pemasangan Kusen Alumunium Profil 4" Putih |
0.2359 |
M1 |
399.836,84 |
94.321,51 |
24.1.11.1 |
- |
Pemasangan Titik Stop Kontak Gedung |
0.025 |
titik |
164.792,00 |
4.119,80 |
24.1.11.2 |
- |
Pemasangan Titik Lampu Gedung |
0.0425 |
titik |
164.792,00 |
7.003,66 |
24.2.3.17 |
- |
Pasangan Batu tanpa Adukan (Aanstamping) |
0.0444 |
M3 |
624.945,01 |
27.747,56 |
|
|
|
|
|
Nilai ASB |
2.527.053,88 |
| 2020 | 26.1.1.11.1 | Rehabilitasi Kerusakan Ringan Bangunan Tipe B (30%) | M2 | 2.527.053,88 | (belum diset) | |
124 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.2.1 |
Pemeliharaan Rumah Kompos Landasan Rigid |
|
|
Titik |
|
|
25.1.2.1.8 |
- |
Pembangunan Rumah Kompos Landasan Rigid |
0.3 |
M2 |
8.126.256,18 |
2.437.876,95 |
|
|
|
|
|
Nilai ASB |
2.437.876,95 |
| 2020 | 25.1.2.1.9 | Pemeliharaan Rumah Kompos Landasan Rigid | M2 | 2.437.876,95 | (belum diset) | |
125 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.3.1.3 |
Saluran Batu kali 100/80 |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
3.08 |
M3 |
118.270,00 |
364.271,59 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.8 |
M3 |
85.740,00 |
68.592,00 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.33 |
M3 |
471.628,02 |
155.637,25 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
2.28 |
M3 |
166.100,00 |
378.708,00 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.72 |
M3 |
1.390.242,02 |
1.000.974,29 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
1.8 |
M2 |
99.416,60 |
178.949,88 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
1 |
meter |
105.933,20 |
105.933,20 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
2 |
buah |
22.941,10 |
45.882,20 |
24.2.3.17 |
- |
Pasangan Batu tanpa Adukan (Aanstamping) |
0.22 |
M3 |
624.945,01 |
137.487,90 |
|
|
|
|
|
Nilai ASB |
2.436.436,31 |
| 2020 | 25.3.1.3.1 | Saluran Batu kali 100/80 | M | 2.436.436,31 | (belum diset) | |
126 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.2.1.3 |
Pembuatan Rangka Atap Baja |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.0481 |
M1 |
113.758,40 |
5.471,78 |
24.1.1.11 |
- |
Pembongkaran Rangka Atap dan Penutup Dipakai Kembali |
0.2625 |
M2 |
32.228,00 |
8.459,85 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.0093 |
M3 |
118.270,00 |
1.099,91 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
0.0721 |
titik |
232.058,65 |
16.731,43 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.0023 |
M3 |
568.825,93 |
1.308,30 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.0409 |
M3 |
1.943.652,28 |
79.495,38 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
3.6457 |
kilogram |
23.886,93 |
87.084,58 |
24.1.4.51 |
- |
Bekisting untuk Sloof |
0.176 |
M2 |
436.108,01 |
76.755,01 |
24.1.4.52 |
- |
Bekisting untuk Kolom |
0.0865 |
M2 |
641.808,00 |
55.516,39 |
24.1.5.1 |
- |
Pekerjaan Perakitan dan Pemasangan Struktur Besi/Baja Profil |
7.1304 |
kilogram |
40.446,50 |
288.399,73 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.0865 |
M2 |
99.416,60 |
8.599,54 |
24.1.6.25 |
- |
Pemasangan acian |
0.0865 |
M2 |
60.790,00 |
5.258,33 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
0.3462 |
M |
40.230,50 |
13.927,80 |
24.1.7.8 |
- |
Pengecatan Besi |
1.3488 |
M2 |
53.052,00 |
71.556,54 |
24.1.7.10 |
- |
Pengecatan Dasar Meni Besi |
1.2623 |
M2 |
50.512,00 |
63.761,30 |
24.1.9.26 |
- |
Pemasangan Penutup Atap Galvalume |
1.625 |
M2 |
746.496,53 |
1.213.056,86 |
24.1.9.29 |
- |
Pemasangan Jurai Genteng Galvalume Tebal 4 mm (m) |
0.2885 |
M1 |
1.159.312,51 |
334.461,67 |
|
|
|
|
|
Nilai ASB |
2.330.944,38 |
| 2020 | 26.2.1.3.1 | Pembuatan Rangka Atap Baja | M2 | 2.330.944,38 | (belum diset) | |
127 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.4.2 |
Pekerjaan Pilar batas Tipe D (batas Desa) |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.525 |
M3 |
118.270,00 |
62.091,75 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.15 |
M3 |
85.740,00 |
12.861,00 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.09 |
M3 |
281.590,28 |
25.343,13 |
24.1.4.74 |
- |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
0.255 |
M3 |
8.648.594,42 |
2.205.391,54 |
|
|
|
|
|
Nilai ASB |
2.305.687,41 |
| 2020 | 25.1.4.2.1 | Pekerjaan Pilar batas Tipe D (batas Desa) | M2 | 2.305.687,41 | (belum diset) | |
128 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.3.1.2 |
Saluran Batu kali 60/80 |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
2.3275 |
M3 |
118.270,00 |
275.273,44 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.56 |
M3 |
85.740,00 |
48.014,40 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.6125 |
M3 |
471.628,02 |
288.872,17 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.7675 |
M3 |
166.100,00 |
293.581,76 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.63 |
M3 |
1.390.242,02 |
875.852,46 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
1.4 |
M2 |
99.416,60 |
139.183,24 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
1 |
meter |
105.933,20 |
105.933,20 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
2 |
buah |
22.941,10 |
45.882,20 |
24.2.3.17 |
- |
Pasangan Batu tanpa Adukan (Aanstamping) |
0.245 |
M3 |
624.945,01 |
153.111,53 |
|
|
|
|
|
Nilai ASB |
2.225.704,40 |
| 2020 | 25.3.1.2.1 | Saluran Batu kali 60/80 | M | 2.225.704,40 | (belum diset) | |
129 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.3.9 |
Konstruksi Jalan Paving Baru Lebar 3 m (tbl. 6 cm) dengan Saluran lebar 40 cm + plat |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
1.1 |
M3 |
118.270,00 |
130.097,00 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.2 |
M3 |
471.628,02 |
94.325,61 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.1 |
M3 |
166.100,00 |
182.710,00 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.6 |
M3 |
1.390.242,02 |
834.145,24 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1 |
M3 |
1.943.652,28 |
194.365,23 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
1.8 |
M2 |
99.416,60 |
178.949,88 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
2 |
M |
40.230,50 |
80.461,00 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
1 |
meter |
105.933,20 |
105.933,20 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
2 |
buah |
22.941,10 |
45.882,20 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
3 |
M2 |
116.890,00 |
350.670,00 |
|
|
|
|
|
Nilai ASB |
2.197.539,36 |
| 2020 | 25.1.3.9.1 | Konstruksi Jalan Paving Baru Lebar 3 m (tbl. 6 cm) dengan Saluran lebar 40 cm + plat | M | 2.197.539,36 | (belum diset) | |
130 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.2.2.7 |
Pembuatan Pagar Dinding Makam |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.6 |
M1 |
113.758,40 |
68.255,04 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.6 |
M3 |
118.270,00 |
70.962,00 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.6 |
M3 |
85.740,00 |
51.444,00 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.047 |
M3 |
471.628,02 |
22.166,52 |
24.1.3.2 |
- |
Pemasangan Turap Bambu tinggi 1,5 m |
1 |
M1 |
295.947,08 |
295.947,08 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.1682 |
M3 |
1.390.242,02 |
233.838,71 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
0.355 |
titik |
193.385,05 |
68.651,69 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.0117 |
M3 |
7.944.915,55 |
92.955,51 |
24.1.4.64 |
- |
Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) |
0.0117 |
M3 |
10.149.718,50 |
118.751,70 |
24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
0.0058 |
M3 |
9.262.468,50 |
53.722,32 |
24.1.6.7 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1/2 bata |
1 |
M2 |
155.098,30 |
155.098,30 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
6 |
M2 |
99.416,60 |
596.499,61 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
8 |
M |
40.230,50 |
321.844,00 |
24.1.7.12 |
- |
Pengecatan Dinding Luar Baru |
0 |
M2 |
57.917,56 |
0,00 |
|
|
|
|
|
Nilai ASB |
2.150.136,48 |
| 2020 | 27.2.2.7.1 | Pembuatan Pagar Dinding Makam | M1 | 2.150.136,48 | (belum diset) | |
131 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.17 |
Pemasangan Papan Petunjuk |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.35 |
M3 |
1.943.652,28 |
680.278,29 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.72 |
M2 |
2.011.392,60 |
1.448.202,73 |
|
|
|
|
|
Nilai ASB |
2.128.481,01 |
| 2020 | 28.4.1.17.1 | Pemasangan Papan Petunjuk | unit | 2.128.481,01 | (belum diset) | |
132 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.3.8 |
Konstruksi Jalan Paving Baru Lebar 2 m (tbl. 6 cm) dengan Saluran lebar 40 cm + plat |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
1.1 |
M3 |
118.270,00 |
130.097,00 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.2 |
M3 |
471.628,02 |
94.325,61 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.1 |
M3 |
166.100,00 |
182.710,00 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.6 |
M3 |
1.390.242,02 |
834.145,24 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1 |
M3 |
1.943.652,28 |
194.365,23 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
1.8 |
M2 |
99.416,60 |
178.949,88 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
2 |
M |
40.230,50 |
80.461,00 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
1 |
meter |
105.933,20 |
105.933,20 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
2 |
buah |
22.941,10 |
45.882,20 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
2 |
M2 |
116.890,00 |
233.780,00 |
|
|
|
|
|
Nilai ASB |
2.080.649,36 |
| 2020 | 25.1.3.8.1 | Konstruksi Jalan Paving Baru Lebar 2 m (tbl. 6 cm) dengan Saluran lebar 40 cm + plat | M | 2.080.649,36 | (belum diset) | |
133 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.3.3.2 |
Saluran Tertutup - Beton 100/120 |
|
|
Titik |
|
|
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
1 |
M2 |
8.975,66 |
8.975,66 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.2 |
M3 |
166.100,00 |
199.320,01 |
24.1.4.16 |
- |
Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, Ready Mix |
0.53 |
M3 |
1.623.341,97 |
860.371,20 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
8.43 |
kilogram |
23.046,93 |
194.285,62 |
24.1.4.50 |
- |
Bekisting untuk Pondasi |
1.605 |
M2 |
402.621,99 |
646.208,30 |
24.2.3.2 |
- |
Galian untuk Selokan Drainase dan Saluran air tanpa Excavator |
1.2 |
M3 |
124.981,96 |
149.978,35 |
|
|
|
|
|
Nilai ASB |
2.059.139,15 |
| 2020 | 25.3.3.2.2 | Saluran Tertutup - Beton 100/120 | M | 2.059.139,15 | (belum diset) | |
134 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.14 |
Rehabilitasi Kerusakan Ringan Bangunan Tipe C (30%) |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.27 |
M1 |
113.758,40 |
30.714,77 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.4346 |
M3 |
118.270,00 |
51.400,14 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.1394 |
M3 |
85.740,00 |
11.952,16 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0526 |
M3 |
471.628,02 |
24.807,63 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.1394 |
M3 |
1.390.242,02 |
193.799,74 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
0.0048 |
titik |
193.385,05 |
928,25 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.0118 |
M3 |
568.825,93 |
6.712,15 |
24.1.4.3 |
- |
Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, dengan Molen |
0.019 |
M3 |
1.689.836,57 |
32.106,89 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.00063 |
M3 |
1.943.652,28 |
1.224,50 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.0154 |
M3 |
6.383.804,41 |
98.310,59 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.0095 |
M3 |
7.944.915,55 |
75.476,70 |
24.1.4.64 |
- |
Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) |
0.0071 |
M3 |
10.149.718,50 |
72.063,00 |
24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
0.0108 |
M3 |
9.262.468,50 |
100.034,66 |
24.1.4.77 |
- |
Pekerjaan Kolom Praktis (11 x 11 cm) |
0.0771 |
M1 |
134.625,10 |
10.379,60 |
24.1.6.7 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1/2 bata |
1.0588 |
M2 |
155.098,30 |
164.218,08 |
24.1.6.8 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata |
0.042 |
M2 |
150.726,50 |
6.330,51 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
2.1596 |
M2 |
99.416,60 |
214.700,10 |
24.1.7.4 |
- |
Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) |
0.2066 |
M2 |
82.723,10 |
17.090,59 |
24.1.7.7 |
- |
Pengecatan Dinding Dalam Baru |
2.5545 |
M2 |
45.835,85 |
117.087,69 |
24.1.7.12 |
- |
Pengecatan Dinding Luar Baru |
0.5207 |
M2 |
57.917,56 |
30.157,67 |
24.1.8.2 |
- |
Pemasangan Lantai Keramik 20x20 cm |
0.0365 |
M2 |
486.460,50 |
17.755,81 |
24.1.8.5 |
- |
Pemasangan Lantai Keramik ukuran 40x40 cm |
0.2458 |
M2 |
1.423.510,50 |
349.898,89 |
24.1.8.16 |
- |
Dinding Keramik ukuran 20x25 cm |
0.0643 |
M2 |
584.363,80 |
37.574,59 |
24.1.9.17 |
- |
Pemasang rangka atap Galvalume 0.75 |
0.2357 |
M2 |
81.466,00 |
19.201,54 |
24.1.9.21 |
- |
Pemasangan Genteng Beton |
0.2357 |
M2 |
274.476,50 |
64.694,11 |
24.1.9.29 |
- |
Pemasangan Jurai Genteng Galvalume Tebal 4 mm (m) |
0.0471 |
M1 |
1.159.312,51 |
54.603,62 |
24.1.9.31 |
- |
Pemasangan Listplank Kayu Kelas II |
0.0016 |
M1 |
215.764,84 |
345,22 |
24.1.9.54 |
- |
Pemasangan Plafon Triplek ukuran (120x240) cm |
0.4369 |
M2 |
67.403,96 |
29.448,79 |
24.1.9.57 |
- |
Pemasangan List plafond Gypsum Profil 4 " |
0.4706 |
M1 |
18.304,80 |
8.614,24 |
24.1.10.10 |
- |
Daun Pintu Panil Kayu Kelas II |
0.0405 |
M2 |
1.348.926,99 |
54.631,54 |
24.1.10.14 |
- |
Pemasangan Kaca Mati tebal 5 mm |
0.0264 |
M2 |
326.075,45 |
8.608,39 |
24.1.10.20 |
- |
Pemasangan Kunci Tanam Besar 2x Putar kuningan |
0.0257 |
buah |
187.054,00 |
4.807,29 |
24.1.10.23 |
- |
Pemasangan Engsel Kuningan Untuk Pintu |
0.0514 |
stel |
124.695,44 |
6.409,35 |
24.1.10.29 |
- |
Pemasangan Hak Angin (Sikutan) |
0.03 |
stel |
64.714,00 |
1.941,42 |
24.1.10.40 |
- |
Pemasangan Daun Pintu PVC |
0.0048 |
buah |
4.879.270,01 |
23.420,50 |
24.1.11.1 |
- |
Pemasangan Titik Stop Kontak Gedung |
0.03 |
titik |
164.792,00 |
4.943,76 |
24.1.11.2 |
- |
Pemasangan Titik Lampu Gedung |
0.0429 |
titik |
164.792,00 |
7.069,58 |
24.1.12.16 |
- |
Pemasangan Kran Air |
0.0175 |
buah |
89.511,00 |
1.566,44 |
24.1.12.18 |
- |
Kloset Duduk Porselen |
0.0048 |
buah |
4.639.511,01 |
22.269,65 |
24.1.12.19 |
- |
Pemasangan Wastafel |
0.005 |
buah |
578.722,02 |
2.893,61 |
24.2.3.17 |
- |
Pasangan Batu tanpa Adukan (Aanstamping) |
0.0507 |
M3 |
624.945,01 |
31.684,71 |
|
|
|
|
|
Nilai ASB |
2.011.878,46 |
| 2020 | 26.1.1.14.1 | Rehabilitasi Kerusakan Ringan Bangunan Tipe C (30%) | M2 | 2.011.878,46 | (belum diset) | |
135 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.3 |
Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan dan Umpak Beton |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.12 |
M3 |
1.943.652,28 |
233.238,27 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.825 |
M2 |
2.011.392,60 |
1.659.398,87 |
|
|
|
|
|
Nilai ASB |
1.892.637,14 |
| 2020 | 28.4.1.3.1 | Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan dan Umpak Beton | unit | 1.892.637,14 | (belum diset) | |
136 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.3.2.1 |
Saluran Batu kali 40/60 + Tutup Pelat (1 sisi) |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
1.1 |
M3 |
118.270,00 |
130.097,00 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.2 |
M3 |
471.628,02 |
94.325,61 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.1 |
M3 |
166.100,00 |
182.710,00 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.6 |
M3 |
1.390.242,02 |
834.145,24 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1 |
M3 |
1.943.652,28 |
194.365,23 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
1.8 |
M2 |
99.416,60 |
178.949,88 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
2 |
M |
40.230,50 |
80.461,00 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
1 |
meter |
105.933,20 |
105.933,20 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
2 |
buah |
22.941,10 |
45.882,20 |
|
|
|
|
|
Nilai ASB |
1.846.869,36 |
| 2020 | 25.3.2.1.1 | Saluran Batu kali 40/60 + Tutup Pelat (1 sisi) | M | 1.846.869,36 | (belum diset) | |
137 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.3.6.1 |
Saluran Batu Kali 40/60 + tutup (2 sisi) |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
1.1 |
M3 |
118.270,00 |
130.097,00 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0 |
M3 |
85.740,00 |
0,00 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.2 |
M3 |
471.628,02 |
94.325,61 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
1.1 |
M3 |
166.100,00 |
182.710,00 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.6 |
M3 |
1.390.242,02 |
834.145,24 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1 |
M3 |
1.943.652,28 |
194.365,23 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
1.8 |
M2 |
99.416,60 |
178.949,88 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
2 |
M |
40.230,50 |
80.461,00 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
1 |
meter |
105.933,20 |
105.933,20 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
2 |
buah |
22.941,10 |
45.882,20 |
|
|
|
|
|
Nilai ASB |
1.846.869,36 |
| 2020 | 25.3.6.1.1 | Saluran Batu Kali 40/60 + tutup (2 sisi) | M | 1.846.869,36 | (belum diset) | |
138 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.3.7 |
Konstruksi Jalan Paving Baru Lebar 8m (tbl. 6 cm) |
|
|
Titik |
|
|
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
0.8 |
M2 |
12.710,00 |
10.168,00 |
24.1.2.4 |
- |
Penggalian Tanah Cadas/Rabat sedalam s.d. 1 m |
0.04 |
M3 |
238.608,00 |
9.544,32 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.4 |
M3 |
471.628,02 |
188.651,21 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
0.003 |
M3 |
166.100,00 |
498,30 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.8 |
M3 |
281.590,28 |
225.272,23 |
24.1.6.22 |
- |
Plesteran Ciprat 1 Pc : 2PS |
0.3 |
M2 |
80.766,60 |
24.229,98 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
6.4 |
M2 |
116.890,00 |
748.096,01 |
24.2.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
3.6 |
M |
127.630,24 |
459.468,86 |
24.2.1.10 |
- |
Stopper/Uskup tebal 6 cm warna |
3.32 |
M |
48.424,90 |
160.770,66 |
|
|
|
|
|
Nilai ASB |
1.826.699,58 |
| 2020 | 25.1.3.7.1 | Konstruksi Jalan Paving Baru Lebar 8m (tbl. 6 cm) | M | 1.826.699,58 | (belum diset) | |
139 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.3.6 |
Konstruksi Jalan Paving Baru Lebar 7m (tbl. 6 cm) |
|
|
Titik |
|
|
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
0.7 |
M2 |
12.710,00 |
8.897,00 |
24.1.2.4 |
- |
Penggalian Tanah Cadas/Rabat sedalam s.d. 1 m |
0.04 |
M3 |
238.608,00 |
9.544,32 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.4 |
M3 |
471.628,02 |
188.651,21 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
0.003 |
M3 |
166.100,00 |
498,30 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.7 |
M3 |
281.590,28 |
197.113,19 |
24.1.6.22 |
- |
Plesteran Ciprat 1 Pc : 2PS |
0.3 |
M2 |
80.766,60 |
24.229,98 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
6.2 |
M2 |
116.890,00 |
724.717,98 |
24.2.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
3.4 |
M |
127.630,24 |
433.942,84 |
24.2.1.10 |
- |
Stopper/Uskup tebal 6 cm warna |
3.12 |
M |
48.424,90 |
151.085,68 |
|
|
|
|
|
Nilai ASB |
1.738.680,50 |
| 2020 | 25.1.3.6.1 | Konstruksi Jalan Paving Baru Lebar 7m (tbl. 6 cm) | M | 1.738.680,50 | (belum diset) | |
140 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.10 |
Sumur Buis Beton diameter 80 cm |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
1 |
M3 |
157.417,60 |
157.417,60 |
24.1.2.17 |
- |
Pengangkutan Tanah dari Lubang Galian yg dalamnya > 1 m |
1 |
M3 |
40.285,00 |
40.285,00 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.01 |
M3 |
1.943.652,28 |
19.436,52 |
117.1.1.1.22.468 |
- |
Riol Beton |
2 |
buah |
748.400,00 |
1.496.800,00 |
|
|
|
|
|
Nilai ASB |
1.713.939,12 |
| 2020 | 28.3.1.10.1 | Sumur Buis Beton diameter 80 cm | titik | 1.713.939,12 | (belum diset) | |