28.4.1.22 |
Pembuatan Palang Kuda - kuda untuk Car Free Day |
|
|
Titik |
|
|
24.1.7.4 |
- |
Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) |
2.969 |
M2 |
82.723,10 |
245.604,89 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.587 |
M2 |
2.011.392,60 |
1.180.687,48 |
117.1.1.1.22.120 |
- |
Besi Hollow 40 x 40 x 1.10 mm |
39.6 |
batang |
124.100,00 |
4.914.359,81 |
117.1.1.1.22.140 |
- |
Besi SIKU 40 x 6m x 4mm |
7.25 |
batang |
180.100,00 |
1.305.725,00 |
123.1.1.1.1.6 |
- |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
- |
Pekerja Terlatih |
0.56 |
OH |
150.800,00 |
84.448,00 |
123.1.1.1.1.23 |
- |
Tukang |
0.56 |
OH |
177.500,00 |
99.400,00 |
123.2.2.1.3.4 |
- |
Alat Bantu Penerangan Jalan Umum (PJU) |
3 |
jam |
9.800,00 |
29.400,00 |
|
|
|
|
|
Nilai ASB |
7.869.965,19 |
| 2020 | 28.4.1.22.1 | Pembuatan Palang Kuda - kuda untuk Car Free Day | unit | 7.869.965,19 | (belum diset) | |
62 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 12 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
12 |
M2 |
640.512,49 |
7.686.149,86 |
|
|
|
|
|
Nilai ASB |
7.686.149,86 |
| 2020 | 25.1.1.2.21 | Pemeliharaan Jalan Overlay Lebar 12 m | M1 | 7.686.149,86 | (belum diset) | |
63 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.7 |
Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 3 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.17 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 4 m |
1 |
M |
2.350.359,81 |
2.350.359,81 |
24.2.2.26 |
- |
Pemasangan Ornamen Lampu PJU panjang 3m |
1 |
buah |
3.313.930,00 |
3.313.930,00 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
|
|
|
|
|
Nilai ASB |
7.682.070,91 |
| 2020 | 27.1.1.7.1 | Pemasangan Lampu HPS 250 W - 1 Phase - Ornamen 3 m | titik | 7.682.070,91 | (belum diset) | |
64 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.8 |
Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 3 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.17 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 4 m |
1 |
M |
2.350.359,81 |
2.350.359,81 |
24.2.2.26 |
- |
Pemasangan Ornamen Lampu PJU panjang 3m |
1 |
buah |
3.313.930,00 |
3.313.930,00 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.45 |
- |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
|
|
|
|
|
Nilai ASB |
7.682.070,91 |
| 2020 | 27.1.1.8.1 | Pemasangan Lampu HPS 400 W - 1 Phase - Ornamen 3 m | titik | 7.682.070,91 | (belum diset) | |
65 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.2.1.2 |
Pembangunan Rumah Pompa Tipe 2 |
|
|
Titik |
|
|
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
68.2 |
M2 |
25.420,00 |
1.733.643,95 |
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
181.2 |
M2 |
8.975,66 |
1.626.389,52 |
24.1.1.13 |
- |
Pekerjaan Pembongkaran Dinding Tembok Bata |
2.88 |
M3 |
1.074.247,97 |
3.093.834,29 |
24.2.5.25 |
- |
Pembongkaran Beton |
2 |
M3 |
546.486,93 |
1.092.973,87 |
|
|
|
|
|
Nilai ASB |
7.546.841,62 |
| 2020 | 26.2.1.2.1 | Pembangunan Rumah Pompa Tipe 2 | unit | 7.546.841,62 | (belum diset) | |
66 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 11,5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
11.5 |
M2 |
640.512,49 |
7.365.893,61 |
|
|
|
|
|
Nilai ASB |
7.365.893,61 |
| 2020 | 25.1.1.2.20 | Pemeliharaan Jalan Overlay Lebar 11,5 m | M1 | 7.365.893,61 | (belum diset) | |
67 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.3.2.7 |
Saluran Batu kali 80/100 + Tutup Pelat (2 sisi) |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
6.2 |
M3 |
118.270,00 |
733.273,98 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.6 |
M3 |
85.740,00 |
51.444,00 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
1.2 |
M3 |
471.628,02 |
565.953,64 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
5.6 |
M3 |
166.100,00 |
930.159,98 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
2.6 |
M3 |
1.390.242,02 |
3.614.629,11 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.2 |
M3 |
1.943.652,28 |
388.730,46 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
5.2 |
M2 |
99.416,60 |
516.966,31 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
4 |
M |
40.230,50 |
160.922,00 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
2 |
meter |
105.933,20 |
211.866,40 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
4 |
buah |
22.941,10 |
91.764,40 |
|
|
|
|
|
Nilai ASB |
7.265.710,29 |
| 2020 | 25.3.2.7.1 | Saluran Batu kali 80/100 + Tutup Pelat (2 sisi) | M | 7.265.710,29 | (belum diset) | |
68 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 11 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
11 |
M2 |
640.512,49 |
7.045.637,37 |
|
|
|
|
|
Nilai ASB |
7.045.637,37 |
| 2020 | 25.1.1.2.19 | Pemeliharaan Jalan Overlay Lebar 11 m | M1 | 7.045.637,37 | (belum diset) | |
69 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.3.6.4 |
Saluran Tipe C |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
4.3 |
M3 |
118.270,00 |
508.561,02 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.3 |
M3 |
85.740,00 |
25.722,00 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
4 |
M3 |
166.100,00 |
664.400,00 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.552 |
M3 |
1.943.652,28 |
1.072.896,03 |
24.1.4.46 |
- |
Tulangan Beton dengan besi polos |
57.1 |
kilogram |
23.046,93 |
1.315.979,63 |
24.1.4.54 |
- |
Bekisting untuk Lantai |
4.152 |
M2 |
748.608,00 |
3.108.220,39 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
2 |
buah |
22.941,10 |
45.882,20 |
|
|
|
|
|
Nilai ASB |
6.741.661,28 |
| 2020 | 25.3.6.4.1 | Saluran Tipe C | M | 6.741.661,28 | (belum diset) | |
70 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 10,5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
10.5 |
M2 |
640.512,49 |
6.725.381,12 |
|
|
|
|
|
Nilai ASB |
6.725.381,12 |
| 2020 | 25.1.1.2.18 | Pemeliharaan Jalan Overlay Lebar 10,5 m | M1 | 6.725.381,12 | (belum diset) | |
71 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 10 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
10 |
M2 |
640.512,49 |
6.405.124,88 |
|
|
|
|
|
Nilai ASB |
6.405.124,88 |
| 2020 | 25.1.1.2.17 | Pemeliharaan Jalan Overlay Lebar 10 m | M1 | 6.405.124,88 | (belum diset) | |
72 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.4 |
Pemasangan Lampu HPS 150 W - 1 Phase - Ornamen 2 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.16 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 3 m |
1 |
M |
1.764.659,81 |
1.764.659,81 |
24.2.2.25 |
- |
Pemasangan Ornamen Lampu PJU panjang 2m |
1 |
buah |
171.430,00 |
171.430,00 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.43 |
- |
Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
2.642.075,00 |
2.642.075,00 |
|
|
|
|
|
Nilai ASB |
6.376.970,91 |
| 2020 | 27.1.1.4.1 | Pemasangan Lampu HPS 150 W - 1 Phase - Ornamen 2 m | titik | 6.376.970,91 | (belum diset) | |
73 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.3 |
Pembangunan Gedung Type C |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.9 |
M1 |
113.758,40 |
102.382,56 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.0549 |
M3 |
118.270,00 |
6.493,02 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.2197 |
M3 |
85.740,00 |
18.837,08 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0094 |
M3 |
471.628,02 |
4.433,30 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.4645 |
M3 |
1.390.242,02 |
645.767,43 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
0.0161 |
titik |
193.385,05 |
3.113,50 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.0393 |
M3 |
568.825,93 |
22.354,86 |
24.1.4.3 |
- |
Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, dengan Molen |
0.0633 |
M3 |
1.689.836,57 |
106.966,65 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.0211 |
M3 |
1.943.652,28 |
41.011,06 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.0514 |
M3 |
6.383.804,41 |
328.127,54 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.0317 |
M3 |
7.944.915,55 |
251.853,82 |
24.1.4.64 |
- |
Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) |
0.0238 |
M3 |
10.149.718,50 |
241.563,31 |
24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
0.036 |
M3 |
9.262.468,50 |
333.448,85 |
24.1.4.77 |
- |
Pekerjaan Kolom Praktis (11 x 11 cm) |
0.2571 |
M1 |
134.625,10 |
34.612,11 |
24.1.6.4 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1 bata |
3.5293 |
M2 |
310.998,21 |
1.097.605,96 |
24.1.6.8 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata |
0.14 |
M2 |
150.726,50 |
21.101,71 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.14 |
M2 |
99.416,60 |
13.918,32 |
24.1.7.4 |
- |
Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) |
0.6887 |
M2 |
82.723,10 |
56.971,40 |
24.1.7.7 |
- |
Pengecatan Dinding Dalam Baru |
8.5149 |
M2 |
45.835,85 |
390.287,69 |
24.1.7.12 |
- |
Pengecatan Dinding Luar Baru |
1.7357 |
M2 |
57.917,56 |
100.527,51 |
24.1.8.2 |
- |
Pemasangan Lantai Keramik 20x20 cm |
0.1217 |
M2 |
486.460,50 |
59.202,24 |
24.1.8.5 |
- |
Pemasangan Lantai Keramik ukuran 40x40 cm |
0.8192 |
M2 |
1.423.510,50 |
1.166.139,77 |
24.1.8.8 |
- |
Pemasangan plint keramik ukuran 10cm x 20 cm |
0.1569 |
M1 |
57.412,30 |
9.007,99 |
24.1.8.16 |
- |
Dinding Keramik ukuran 20x25 cm |
0.2143 |
M2 |
584.363,80 |
125.229,17 |
24.1.9.17 |
- |
Pemasang rangka atap Galvalume 0.75 |
0.7857 |
M2 |
81.466,00 |
64.007,84 |
24.1.9.21 |
- |
Pemasangan Genteng Beton |
0.7857 |
M2 |
274.476,50 |
215.656,19 |
24.1.9.29 |
- |
Pemasangan Jurai Genteng Galvalume Tebal 4 mm (m) |
0.1571 |
M1 |
1.159.312,51 |
182.128,00 |
24.1.9.31 |
- |
Pemasangan Listplank Kayu Kelas II |
0.0054 |
M1 |
215.764,84 |
1.165,13 |
24.1.9.53 |
- |
Pemasangan Plafon Akustik |
1.4563 |
M2 |
45.553,20 |
66.339,12 |
24.1.9.57 |
- |
Pemasangan List plafond Gypsum Profil 4 " |
1.5686 |
M1 |
18.304,80 |
28.712,91 |
24.1.10.10 |
- |
Daun Pintu Panil Kayu Kelas II |
0.135 |
M2 |
1.348.926,99 |
182.105,15 |
24.1.10.14 |
- |
Pemasangan Kaca Mati tebal 5 mm |
0.088 |
M2 |
326.075,45 |
28.694,64 |
24.1.10.20 |
- |
Pemasangan Kunci Tanam Besar 2x Putar kuningan |
0.0857 |
buah |
187.054,00 |
16.030,53 |
24.1.10.23 |
- |
Pemasangan Engsel Kuningan Untuk Pintu |
0.1714 |
stel |
124.695,44 |
21.372,80 |
24.1.10.29 |
- |
Pemasangan Hak Angin (Sikutan) |
0.1 |
stel |
64.714,00 |
6.471,40 |
24.1.10.40 |
- |
Pemasangan Daun Pintu PVC |
0.016 |
buah |
4.879.270,01 |
78.068,32 |
24.1.11.1 |
- |
Pemasangan Titik Stop Kontak Gedung |
0.1 |
titik |
164.792,00 |
16.479,20 |
24.1.11.2 |
- |
Pemasangan Titik Lampu Gedung |
0.1429 |
titik |
164.792,00 |
23.548,78 |
24.1.12.9 |
- |
Pemasangan Saluran Pipa diameter 1'' |
0.595 |
meter |
31.098,24 |
18.503,45 |
24.1.12.13 |
- |
Pemasangan Saluran Pipa diameter 4'' |
0.51 |
meter |
68.233,88 |
34.799,28 |
24.1.12.16 |
- |
Pemasangan Kran Air |
0.0583 |
buah |
89.511,00 |
5.218,49 |
24.1.12.18 |
- |
Kloset Duduk Porselen |
0.016 |
buah |
4.639.511,01 |
74.232,18 |
24.1.12.19 |
- |
Pemasangan Wastafel |
0.0167 |
buah |
578.722,02 |
9.664,66 |
24.2.3.17 |
- |
Pasangan Batu tanpa Adukan (Aanstamping) |
0.1689 |
M3 |
624.945,01 |
105.553,21 |
|
|
|
|
|
Nilai ASB |
6.359.708,15 |
| 2020 | 26.1.1.3.1 | Pembangunan Gedung Type C | M2 | 6.359.708,15 | (belum diset) | |
74 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.5.1.1 |
Pembangunan Halte |
|
|
Titik |
|
|
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
1 |
M2 |
25.420,00 |
25.420,00 |
24.1.2.4 |
- |
Penggalian Tanah Cadas/Rabat sedalam s.d. 1 m |
0.232 |
M3 |
238.608,00 |
55.357,05 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.1 |
M3 |
471.628,02 |
47.162,80 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.02 |
M3 |
281.590,28 |
5.631,81 |
24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
0.27 |
titik |
193.385,05 |
52.213,96 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.1 |
M3 |
568.825,93 |
56.882,59 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.13 |
M3 |
6.383.804,41 |
829.894,54 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.025 |
M3 |
7.944.915,55 |
198.622,89 |
24.1.5.1 |
- |
Pekerjaan Perakitan dan Pemasangan Struktur Besi/Baja Profil |
20 |
kilogram |
40.446,50 |
808.929,99 |
24.1.7.8 |
- |
Pengecatan Besi |
5.2 |
M2 |
53.052,00 |
275.870,39 |
24.1.7.10 |
- |
Pengecatan Dasar Meni Besi |
5.2 |
M2 |
50.512,00 |
262.662,39 |
24.1.8.4 |
- |
Pemasangan Lantai Keramik ukuran 60x60 cm |
1 |
M2 |
860.010,50 |
860.010,50 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.6 |
M2 |
2.011.392,60 |
1.206.835,61 |
24.1.9.17 |
- |
Pemasang rangka atap Galvalume 0.75 |
1.5 |
M2 |
81.466,00 |
122.199,00 |
24.1.14.3 |
- |
Pekerjaan Besi Pipa Galvanis 1 " (Medium) |
0.7 |
meter |
29.708,00 |
20.795,60 |
24.1.14.7 |
- |
Pekerjaan Besi Pipa Galvanis 3 " (Medium) |
0.4 |
meter |
89.124,00 |
35.649,60 |
117.1.3.8.1.43 |
- |
Kabel NYM 2 x 2,5 mm |
2 |
meter |
633.200,00 |
1.266.400,00 |
|
|
|
|
|
Nilai ASB |
6.130.538,74 |
| 2020 | 28.5.1.1.1 | Pembangunan Halte | M2 | 6.130.538,74 | (belum diset) | |
75 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 9,5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
9.5 |
M2 |
640.512,49 |
6.084.868,64 |
|
|
|
|
|
Nilai ASB |
6.084.868,64 |
| 2020 | 25.1.1.2.16 | Pemeliharaan Jalan Overlay Lebar 9,5 m | M1 | 6.084.868,64 | (belum diset) | |
76 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.1.1.2 |
Pemasangan Lampu HPS 150 W - 1 Phase - Ornamen 1.5 m |
|
|
Titik |
|
|
24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
24.2.2.15 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 2,5 m |
1 |
M |
1.471.809,81 |
1.471.809,81 |
24.2.2.24 |
- |
Pemasangan Ornamen Lampu PJU panjang 1,5 m |
1 |
buah |
171.430,00 |
171.430,00 |
24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
24.2.2.43 |
- |
Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
2.642.075,00 |
2.642.075,00 |
|
|
|
|
|
Nilai ASB |
6.084.120,91 |
| 2020 | 27.1.1.2.1 | Pemasangan Lampu HPS 150 W - 1 Phase - Ornamen 1.5 m | titik | 6.084.120,91 | (belum diset) | |
77 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.3.17 |
Konstruksi Jalan Paving Baru Lebar 8 m (tbl. 6 cm) dengan Saluran lebar 100 cm + plat |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
4.3 |
M3 |
118.270,00 |
508.561,02 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.3 |
M3 |
85.740,00 |
25.722,00 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.7 |
M3 |
471.628,02 |
330.139,61 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
4 |
M3 |
166.100,00 |
664.400,00 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
1.8 |
M3 |
1.390.242,02 |
2.502.435,56 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1 |
M3 |
1.943.652,28 |
194.365,23 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
3.2 |
M2 |
99.416,60 |
318.133,13 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
2 |
M |
40.230,50 |
80.461,00 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
1 |
meter |
105.933,20 |
105.933,20 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
2 |
buah |
22.941,10 |
45.882,20 |
24.2.1.3 |
- |
Pemasangan Paving Blok Tbl.8 cm segi empat |
8 |
M2 |
132.290,00 |
1.058.320,00 |
|
|
|
|
|
Nilai ASB |
5.834.352,96 |
| 2020 | 25.1.3.17.1 | Konstruksi Jalan Paving Baru Lebar 8 m (tbl. 6 cm) dengan Saluran lebar 100 cm + plat | M | 5.834.352,96 | (belum diset) | |
78 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 9 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
9 |
M2 |
640.512,49 |
5.764.612,39 |
|
|
|
|
|
Nilai ASB |
5.764.612,39 |
| 2020 | 25.1.1.2.15 | Pemeliharaan Jalan Overlay Lebar 9 m | M1 | 5.764.612,39 | (belum diset) | |
79 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.3.14 |
Konstruksi Jalan Paving Baru Lebar 5 m (tbl. 6 cm) dengan Saluran lebar 100 cm + plat |
|
|
Titik |
|
|
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
0.5 |
M2 |
12.710,00 |
6.355,00 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
4.3 |
M3 |
118.270,00 |
508.561,02 |
24.1.2.4 |
- |
Penggalian Tanah Cadas/Rabat sedalam s.d. 1 m |
0.04 |
M3 |
238.608,00 |
9.544,32 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.3 |
M3 |
85.740,00 |
25.722,00 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.3 |
M3 |
471.628,02 |
141.488,41 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
4 |
M3 |
166.100,00 |
664.400,00 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.5 |
M3 |
281.590,28 |
140.795,14 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
1.8 |
M3 |
1.390.242,02 |
2.502.435,56 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1 |
M3 |
1.943.652,28 |
194.365,23 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
3.2 |
M2 |
99.416,60 |
318.133,13 |
24.1.6.22 |
- |
Plesteran Ciprat 1 Pc : 2PS |
0.3 |
M2 |
80.766,60 |
24.229,98 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
2 |
M |
40.230,50 |
80.461,00 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
1 |
meter |
105.933,20 |
105.933,20 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
2 |
buah |
22.941,10 |
45.882,20 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
3 |
M2 |
116.890,00 |
350.670,00 |
24.2.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
3 |
M |
127.630,24 |
382.890,73 |
24.2.1.10 |
- |
Stopper/Uskup tebal 6 cm warna |
2.7 |
M |
48.424,90 |
130.747,23 |
|
|
|
|
|
Nilai ASB |
5.632.614,16 |
| 2020 | 25.1.3.14.1 | Konstruksi Jalan Paving Baru Lebar 5 m (tbl. 6 cm) dengan Saluran lebar 100 cm + plat | meter | 5.632.614,16 | (belum diset) | |
80 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.3.16 |
Konstruksi Jalan Paving Baru Lebar 7 m (tbl. 6 cm) dengan Saluran lebar 100 cm + plat |
|
|
Titik |
|
|
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
4.3 |
M3 |
118.270,00 |
508.561,02 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.3 |
M3 |
85.740,00 |
25.722,00 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.7 |
M3 |
471.628,02 |
330.139,61 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
4 |
M3 |
166.100,00 |
664.400,00 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
1.8 |
M3 |
1.390.242,02 |
2.502.435,56 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1 |
M3 |
1.943.652,28 |
194.365,23 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
3.2 |
M2 |
99.416,60 |
318.133,13 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
2 |
M |
40.230,50 |
80.461,00 |
24.1.12.5 |
- |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
1 |
meter |
105.933,20 |
105.933,20 |
24.1.12.20 |
- |
Pemasangan Lubang Drainase |
2 |
buah |
22.941,10 |
45.882,20 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
7 |
M2 |
116.890,00 |
818.230,00 |
|
|
|
|
|
Nilai ASB |
5.594.262,96 |