181 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.9 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.36 |
M2 |
2.011.392,60 |
724.101,36 |
|
|
|
|
|
Nilai ASB |
724.101,36 |
| 2020 | 28.4.1.9.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade | unit | 724.101,36 | (belum diset) | |
182 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.16 |
Pemasangan Papan Peringatan / Himbauan |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.35 |
M3 |
1.943.652,28 |
680.278,29 |
|
|
|
|
|
Nilai ASB |
680.278,29 |
| 2020 | 28.4.1.16.1 | Pemasangan Papan Peringatan / Himbauan | unit | 680.278,29 | (belum diset) | |
183 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay |
|
|
Titik |
|
|
24.2.3.73 |
- |
Lapis Perekat - Aspal Cair |
0.575 |
liter |
17.664,37 |
10.157,01 |
24.2.3.83 |
- |
LasTon Lapis Aus (AC-WC) |
0.115 |
ton |
1.622.513,66 |
186.589,07 |
24.2.3.103 |
- |
Lapis ATB |
0.1049 |
ton |
4.230.375,51 |
443.766,40 |
|
|
|
|
|
Nilai ASB |
640.512,49 |
| 2020 | 25.1.1.2.4 | Pemeliharaan Jalan Overlay | M2 | 640.512,49 | (belum diset) | |
184 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.26 |
Pemasangan Wall Paper |
|
|
Titik |
|
|
24.1.8.18 |
- |
Pemasangan wallpaper lebar 50 cm |
1 |
M2 |
631.231,51 |
631.231,51 |
|
|
|
|
|
Nilai ASB |
631.231,51 |
| 2020 | 26.1.1.26.1 | Pemasangan Wall Paper | M2 | 631.231,51 | (belum diset) | |
185 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.9 |
Pembangunan Lapangan Olahraga Tenis dan Pagar |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.1 |
M1 |
113.758,40 |
11.375,84 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.002 |
M3 |
85.740,00 |
171,48 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0007 |
M3 |
471.628,02 |
330,14 |
24.1.3.13 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 5 Ps) |
0.06 |
M3 |
1.324.364,43 |
79.461,86 |
24.1.3.15 |
- |
Pemasangan Batu Kali Kosongan (aanstamping) |
0.02 |
M3 |
837.121,22 |
16.742,42 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.0006 |
M3 |
568.825,93 |
341,30 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1 |
M3 |
1.943.652,28 |
194.365,23 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.005 |
M3 |
6.383.804,41 |
31.919,02 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.28 |
M2 |
99.416,60 |
27.836,65 |
24.1.6.25 |
- |
Pemasangan acian |
0.28 |
M2 |
60.790,00 |
17.021,20 |
24.1.8.19 |
- |
Pembuatan/Pemasangan Hardener Floor (Granit Trase Corak) |
1 |
M2 |
75.971,20 |
75.971,20 |
24.1.10.37 |
- |
Pemasangan Kawat Harmonika |
0.76 |
M2 |
155.487,14 |
118.170,23 |
24.1.11.2 |
- |
Pemasangan Titik Lampu Gedung |
0.01 |
titik |
164.792,00 |
1.647,92 |
117.1.1.1.16.14 |
- |
Plat Strip uk 3x 40 mm |
0.71 |
M |
55.800,00 |
39.618,00 |
|
|
|
|
|
Nilai ASB |
627.682,49 |
| 2020 | 28.3.1.9.1 | Pembangunan Lapangan Olahraga Tenis dan Pagar | M2 | 627.682,49 | (belum diset) | |
186 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.25 |
Pemeliharaan Gedung Bertingkat |
|
|
Titik |
|
|
24.1.7.11 |
- |
Pengecatan Dinding Luar Lama Tanpa Plamir (sewarna) |
4 |
M2 |
46.036,44 |
184.145,76 |
24.1.8.5 |
- |
Pemasangan Lantai Keramik ukuran 40x40 cm |
0.25 |
M2 |
1.423.510,50 |
355.877,62 |
24.1.9.52 |
- |
Pemasangan Plafon Asbes Semen, tebal 4 mm |
0.125 |
M2 |
46.286,60 |
5.785,83 |
24.1.9.55 |
- |
Pemasangan Plafon Gypsum Board (120x240) 9 mm |
1 |
M2 |
62.325,80 |
62.325,80 |
|
|
|
|
|
Nilai ASB |
608.135,01 |
| 2020 | 26.1.1.25.1 | Pemeliharaan Gedung Bertingkat | M2 | 608.135,01 | (belum diset) | |
187 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Tipe 2 |
|
|
Titik |
|
|
24.2.3.38 |
- |
Lapis Pondasi Aggregat Kelas A |
0.2167 |
M3 |
908.635,51 |
196.901,32 |
24.2.3.83 |
- |
LasTon Lapis Aus (AC-WC) |
0.09 |
ton |
1.622.513,66 |
146.026,24 |
24.2.3.87 |
- |
LasTon Lapis Antara (AC-BC) |
0.135 |
ton |
1.502.092,25 |
202.782,46 |
|
|
|
|
|
Nilai ASB |
545.710,02 |
| 2020 | 25.1.1.2.2 | Pemeliharaan Jalan Tipe 2 | M2 | 545.710,02 | (belum diset) | |
188 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.6.1.2 |
Pembuatan Para-Para |
|
|
Titik |
|
|
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
3.125 |
M2 |
25.420,00 |
79.437,50 |
24.1.2.7 |
- |
Penggalian Tanah dengan Alat Berat |
0.02 |
M3 |
109.087,70 |
2.181,75 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.01 |
M3 |
471.628,02 |
4.716,28 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.015 |
M3 |
1.943.652,28 |
29.154,78 |
24.1.6.16 |
- |
Plesteran Halus 1 Pc : 2 Ps tebal 1.5 cm |
0.1 |
M2 |
108.694,40 |
10.869,44 |
24.1.7.8 |
- |
Pengecatan Besi |
1.06 |
M2 |
53.052,00 |
56.235,12 |
24.1.14.3 |
- |
Pekerjaan Besi Pipa Galvanis 1 " (Medium) |
6 |
meter |
29.708,00 |
178.248,00 |
24.1.14.4 |
- |
Pekerjaan Besi Pipa Galvanis 1 1/4 " (Medium) |
3 |
meter |
56.602,00 |
169.806,00 |
|
|
|
|
|
Nilai ASB |
530.648,87 |
| 2020 | 28.6.1.2.1 | Pembuatan Para-Para | M2 | 530.648,87 | (belum diset) | |
189 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.20 |
Pemasangan Tiang Rambu Ganda |
|
|
Titik |
|
|
117.1.1.1.22.139 |
- |
Besi SIKU 30 x 6 m x 3 mm |
0.75 |
batang |
60.100,00 |
45.075,00 |
117.1.1.1.22.221 |
- |
Mur Baut untuk panel Rambu |
0.5 |
Kg |
8.700,00 |
4.350,00 |
117.2.2.1.2.7 |
- |
Pipa Galvanis 6 m 2" |
3 |
meter |
76.100,00 |
228.300,00 |
123.1.1.1.1.6 |
- |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
- |
Pekerja Terlatih |
1.5 |
OH |
150.800,00 |
226.200,00 |
|
|
|
|
|
Nilai ASB |
514.265,00 |
| 2020 | 28.4.1.20.1 | Pemasangan Tiang Rambu Ganda | unit | 514.265,00 | (belum diset) | |
190 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.6.1.6 |
Pemeliharaan Paving Hutan Kota |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.0104 |
M1 |
113.758,40 |
1.183,09 |
24.1.1.8 |
- |
Pembersihan Lapangan "Berat" dan Perataan |
1.3 |
M2 |
25.420,00 |
33.046,00 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.3211 |
M3 |
118.270,00 |
37.976,50 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0793 |
M3 |
471.628,02 |
37.400,10 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.2405 |
M3 |
281.590,28 |
67.722,46 |
24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.0696 |
M3 |
1.390.242,02 |
96.760,85 |
24.2.1.3 |
- |
Pemasangan Paving Blok Tbl.8 cm segi empat |
1.222 |
M2 |
132.290,00 |
161.658,38 |
24.2.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
0.52 |
M |
127.630,24 |
66.367,72 |
|
|
|
|
|
Nilai ASB |
502.115,10 |
| 2020 | 28.6.1.6.1 | Pemeliharaan Paving Hutan Kota | M2 | 502.115,10 | (belum diset) | |
191 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.2.2 |
Pemasangan Kabel Bawah Tanah dengan System Booring |
|
|
Titik |
|
|
24.1.12.26 |
- |
Pemasangan Pipa Pe 12 mm |
1.05 |
meter |
467.208,02 |
490.568,40 |
|
|
|
|
|
Nilai ASB |
490.568,40 |
| 2020 | 28.4.2.2.1 | Pemasangan Kabel Bawah Tanah dengan System Booring | M | 490.568,40 | (belum diset) | |
192 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
26.1.1.24 |
Pemeliharaan Gedung Tidak Bertingkat |
|
|
Titik |
|
|
24.1.7.11 |
- |
Pengecatan Dinding Luar Lama Tanpa Plamir (sewarna) |
3 |
M2 |
46.036,44 |
138.109,32 |
24.1.8.5 |
- |
Pemasangan Lantai Keramik ukuran 40x40 cm |
0.2 |
M2 |
1.423.510,50 |
284.702,10 |
24.1.9.55 |
- |
Pemasangan Plafon Gypsum Board (120x240) 9 mm |
1 |
M2 |
62.325,80 |
62.325,80 |
|
|
|
|
|
Nilai ASB |
485.137,22 |
| 2020 | 26.1.1.24.1 | Pemeliharaan Gedung Tidak Bertingkat | M2 | 485.137,22 | (belum diset) | |
193 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Tipe 1 |
|
|
Titik |
|
|
24.2.3.38 |
- |
Lapis Pondasi Aggregat Kelas A |
0.2167 |
M3 |
908.635,51 |
196.901,32 |
24.2.3.83 |
- |
LasTon Lapis Aus (AC-WC) |
0.09 |
ton |
1.622.513,66 |
146.026,24 |
24.2.3.87 |
- |
LasTon Lapis Antara (AC-BC) |
0.09 |
ton |
1.502.092,25 |
135.188,31 |
|
|
|
|
|
Nilai ASB |
478.115,86 |
| 2020 | 25.1.1.2.1 | Pemeliharaan Jalan Tipe 1 | M2 | 478.115,86 | (belum diset) | |
194 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.18 |
Pemasangan penggantian pipa rambu lalu lintas (menggunakan flenders) |
|
|
Titik |
|
|
117.1.1.1.16.14 |
- |
Plat Strip uk 3x 40 mm |
1.5 |
M |
55.800,00 |
83.700,00 |
117.1.1.1.22.221 |
- |
Mur Baut untuk panel Rambu |
0.5 |
Kg |
8.700,00 |
4.350,00 |
117.2.2.1.2.7 |
- |
Pipa Galvanis 6 m 2" |
3 |
meter |
76.100,00 |
228.300,00 |
123.1.1.1.1.6 |
- |
Mandor |
0.085 |
OH |
206.800,00 |
17.578,00 |
123.1.1.1.1.14 |
- |
Pekerja Terlatih |
0.85 |
OH |
150.800,00 |
128.180,00 |
|
|
|
|
|
Nilai ASB |
462.108,00 |
| 2020 | 28.4.1.18.1 | Pemasangan penggantian pipa rambu lalu lintas (menggunakan flenders) | unit | 462.108,00 | (belum diset) | |
195 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.3.3.1 |
Saluran Terbuka - Beton 40/60 |
|
|
Titik |
|
|
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
0.4 |
M2 |
8.975,66 |
3.590,26 |
24.1.2.20 |
- |
Pengangkutan Tanah keluar Proyek |
0.24 |
M3 |
166.100,00 |
39.864,00 |
24.1.4.16 |
- |
Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, Ready Mix |
0.135 |
M3 |
1.623.341,97 |
219.151,18 |
24.1.4.50 |
- |
Bekisting untuk Pondasi |
0.35 |
M2 |
402.621,99 |
140.917,69 |
24.2.3.2 |
- |
Galian untuk Selokan Drainase dan Saluran air tanpa Excavator |
0.24 |
M3 |
124.981,96 |
29.995,67 |
|
|
|
|
|
Nilai ASB |
433.518,80 |
| 2020 | 25.3.3.1.4 | Saluran Terbuka - Beton 40/60 | M | 433.518,80 | (belum diset) | |
196 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.2.1 |
Pembuatan Jalan Rigid tanpa tulangan pada jalan lingkungan |
|
|
Titik |
|
|
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.1 |
M3 |
471.628,02 |
47.162,80 |
24.1.4.24 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, Ready Mix |
0.15 |
M3 |
1.691.375,97 |
253.706,41 |
24.1.4.51 |
- |
Bekisting untuk Sloof |
0.3 |
M2 |
436.108,01 |
130.832,41 |
|
|
|
|
|
Nilai ASB |
431.701,62 |
| 2020 | 25.1.2.1.10 | Pembuatan Jalan Rigid tanpa tulangan pada jalan lingkungan | M2 | 431.701,62 | (belum diset) | |
197 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.6 |
PEKERJAAN PEMBUATAN LAPANGAN BULUTANGKIS (16,4X8,1m) |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.0903 |
M1 |
113.758,40 |
10.272,38 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
0.1075 |
M2 |
12.710,00 |
1.366,33 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.0094 |
M3 |
118.270,00 |
1.111,74 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.0901 |
M3 |
85.740,00 |
7.725,17 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.0021 |
M3 |
1.943.652,28 |
4.081,67 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.0027 |
M3 |
6.383.804,41 |
17.236,27 |
24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.0159 |
M3 |
7.944.915,55 |
126.324,16 |
24.1.4.74 |
- |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
0.0252 |
M3 |
8.648.594,42 |
217.944,58 |
24.1.6.3 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1 bata |
0.0011 |
M2 |
320.687,30 |
352,76 |
24.1.6.7 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1/2 bata |
0.012 |
M2 |
155.098,30 |
1.861,18 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.0354 |
M2 |
99.416,60 |
3.519,35 |
24.1.6.25 |
- |
Pemasangan acian |
0.0354 |
M2 |
60.790,00 |
2.151,97 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
0.2 |
M |
40.230,50 |
8.046,10 |
24.1.7.8 |
- |
Pengecatan Besi |
0.1489 |
M2 |
53.052,00 |
7.899,44 |
24.1.7.12 |
- |
Pengecatan Dinding Luar Baru |
0.0354 |
M2 |
57.917,56 |
2.050,28 |
24.1.8.19 |
- |
Pembuatan/Pemasangan Hardener Floor (Granit Trase Corak) |
0.1 |
M2 |
75.971,20 |
7.597,12 |
24.1.11.1 |
- |
Pemasangan Titik Stop Kontak Gedung |
0.0151 |
titik |
164.792,00 |
2.488,36 |
24.1.14.5 |
- |
Pekerjaan Besi Pipa Galvanis 2 " (Medium) |
0.1152 |
meter |
59.416,00 |
6.844,72 |
|
|
|
|
|
Nilai ASB |
428.873,58 |
| 2020 | 28.3.1.6.1 | PEKERJAAN PEMBUATAN LAPANGAN BULUTANGKIS (16,4X8,1m) | M2 | 428.873,58 | (belum diset) | |
198 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
27.2.2.4 |
Pengurugan Lahan Makam Dengan Tanah |
|
|
Titik |
|
|
24.1.2.13 |
- |
Penimbunan tanah, Perataan dan Pemadatan menggunakan Alat Berat |
1 |
M3 |
427.689,23 |
427.689,23 |
|
|
|
|
|
Nilai ASB |
427.689,23 |
| 2020 | 27.2.2.4.1 | Pengurugan Lahan Makam Dengan Tanah | M3 | 427.689,23 | (belum diset) | |
199 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Tipe 1 |
|
|
Titik |
|
|
24.8.2.8 |
- |
Agregat Lapis Pondasi Atas (LPA) Klas A |
0.216666 |
M3 |
715.236,78 |
154.967,49 |
24.8.2.42 |
- |
Laston Lapis Aus (AC-WC) |
0.09 |
ton |
1.990.392,85 |
179.135,36 |
24.8.2.46 |
- |
Laston Lapis Antara (AC-BC) |
0.09 |
ton |
935.157,38 |
84.164,17 |
|
|
|
|
|
Nilai ASB |
418.267,02 |
| 2019 | 25.1.1.2.1 | Pemeliharaan Jalan Tipe 1 | M2 | 418.267,02 | (belum diset) | |
200 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.2 |
Pembangunan Lapangan Olahraga Lompat Jauh |
|
|
Titik |
|
|
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.1.9 |
- |
Uitzet Dengan WaterPass / Theodolit |
1 |
M2 |
8.975,66 |
8.975,66 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.4165 |
M3 |
118.270,00 |
49.259,46 |
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.1004 |
M3 |
157.417,60 |
15.804,73 |
24.1.6.8 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata |
0.3256 |
M2 |
150.726,50 |
49.076,55 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.1302 |
M2 |
99.416,60 |
12.944,04 |
24.1.6.25 |
- |
Pemasangan acian |
0.1302 |
M2 |
60.790,00 |
7.914,86 |
24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
0.6512 |
M |
40.230,50 |
26.198,10 |
24.2.1.7 |
- |
Kanstin Trap uk. 15.25.40 ; K-175 |
1.1124 |
M |
127.630,24 |
141.975,89 |
117.1.1.1.4.23 |
- |
Pasir Halus 1 |
0.3354 |
M3 |
258.200,00 |
86.600,28 |
132.3.2.13.1.96 |
- |
Air Kerja |
100 |
liter |
36,00 |
3.600,00 |
|
|
|
|
|
Nilai ASB |
415.059,56 |
| 2020 | 28.3.1.2.1 | Pembangunan Lapangan Olahraga Lompat Jauh | M2 | 415.059,56 | (belum diset) | |