Standard Satuan Harga
Daftar Data Standart Harga Perencanaan Pemerintah Kota Medan
Showing 19,901-19,920 of 69,568 items.
Standard Satuan Harga
* Resize table columns just like a spreadsheet by dragging the column edges.
19901 | 2018 | 23.2.3.3.2.21 | Tiket Perjalanan VIP ke Kawasan Asia Pasifik | | 88.256.000,00 | Orang/PP | Tidak Dipakai | |
19902 | 2018 | 23.2.3.3.2.22 | Tiket Perjalanan VIP ke Korea Selatan | | 41.524.000,00 | Orang/PP | Tidak Dipakai | |
19903 | 2018 | 23.2.3.3.2.23 | Tiket Perjalanan ke Kawasan Afrika Utara | | 41.143.000,00 | Orang/PP | Tidak Dipakai | |
19904 | 2018 | 23.2.3.3.2.24 | Tiket Pesawat Ke Quito | | 66.685.000,00 | Orang PP | Tidak Dipakai | |
19905 | 2018 | 23.2.3.3.2.25 | Tiket Pesawat Ke Bogota-Quito | | 102.700.000,00 | Orang PP | Tidak Dipakai | |
19906 | 2018 | 23.2.3.3.2.26 | Tiket Pesawat Ke Manila | | 15.975.000,00 | Orang PP | Tidak Dipakai | |
19907 | 2018 | 23.2.4.1.1.1 | Mandor | | 196.000,00 | Orang Hari | Tidak Dipakai | |
19908 | 2018 | 23.2.4.1.2.1 | Kepala Tukang | | 224.000,00 | Orang Hari | Tidak Dipakai | |
19909 | 2018 | 23.2.4.1.2.2 | Jasa Konsultan | - | 335.000.000,00 | paket | Dipakai | |
19910 | 2018 | 23.2.4.1.3.1 | Tukang | | 168.000,00 | Orang Hari | Tidak Dipakai | |
19911 | 2018 | 23.2.4.1.3.2 | upah pengangkut/pengangkat barang | (belum diset) | 200.000,00 | orang | Dipakai | |
19912 | 2018 | 23.2.4.1.4.1 | Pembantu Tukang | | 110.000,00 | Orang Hari | Tidak Dipakai | |
19913 | 2018 | 23.2.4.1.5.1 | Tenaga Kasar | | 110.000,00 | Orang Hari | Tidak Dipakai | |
19914 | 2018 | 23.2.4.1.7.1 | Operator Alat Konstruksi (Excavator) | | 158.000,00 | Orang Hari | Tidak Dipakai | |
19915 | 2018 | 23.2.4.1.8.1 | Pembantu Operator | | 140.000,00 | Orang Hari | Tidak Dipakai | |
19916 | 2018 | 23.2.4.1.8.2 | Pembantu Operator (Pengadaan Aplikasi SMS Calling Keprotokolan) | (belum diset) | 148.000,00 | Orang Hari | Tidak Dipakai | |
19917 | 2018 | 23.2.4.1.9.1 | Pelaksanaan Produksi Pemasangan Flooring Museum Lantai II | | 117.600.000,00 | paket | Tidak Dipakai | |
19918 | 2018 | 23.2.4.1.10.1 | Tukang Panjat Tower | | 500.000,00 | orang | Tidak Dipakai | |
19919 | 2018 | 23.2.4.1.11.1 | Pengadaan gedung tempat kerja | (belum diset) | 75.000.000,00 | paket | Tidak Dipakai | |
19920 | 2018 | 23.2.4.1.11.2 | upah pemasangan flooring | | 13.000,00 | meter | Tidak Dipakai | |