Standard Satuan Harga
Daftar Data Standart Harga Perencanaan Pemerintah Kota Medan
Showing 19,121-19,140 of 69,568 items.
Standard Satuan Harga
* Resize table columns just like a spreadsheet by dragging the column edges.
19121 | 2018 | 23.2.2.10.36.1 | Iuran JKPI | | 10.000.000,00 | Tahun | Dipakai | |
19122 | 2018 | 23.2.2.10.37.1 | Pengangkutan / Pengolahan Limbah Medis | | 17.000,00 | Kg | Dipakai | |
19123 | 2018 | 23.2.2.10.38.1 | Pengangkutan / Pengolahan Abu Insinerator | | 2.200.000,00 | Drum | Tidak Dipakai | |
19124 | 2018 | 23.2.2.10.39.1 | Pengangkutan / Pengolahan Limbah Cair/Developer/Fixer | | 16.000,00 | Kg | Tidak Dipakai | |
19125 | 2018 | 23.2.2.10.40.1 | Pengangkutan / Pengolahan Limbah Farmasi | | 16.000,00 | Kg | Tidak Dipakai | |
19126 | 2018 | 23.2.2.10.41.1 | Pengangkutan / Pengolahan Limbah Lampu TL | | 400.000,00 | Kg | Tidak Dipakai | |
19127 | 2018 | 23.2.2.10.42.1 | Pengangkutan / Pengolahan Limbah Oli Bekas | | 250.000,00 | Drum | Tidak Dipakai | |
19128 | 2018 | 23.2.2.10.43.1 | Pengangkutan / Pengolahan Limbah Sludge IPAL | | 2.000,00 | Kg | Tidak Dipakai | |
19129 | 2018 | 23.2.2.10.44.1 | Pengangkutan / Pengolahan Limbah Kemasan Bekas | | 5.000,00 | Kg | Tidak Dipakai | |
19130 | 2018 | 23.2.2.10.45.1 | Pengangkutan / Pengolahan Limbah Accu Bekas | | 5.000,00 | Kg | Tidak Dipakai | |
19131 | 2018 | 23.2.2.10.46.1 | Pelayanan Pengukuran Dan Pemetaan Batas Bidang Tanah Secara Massal | | 1.250.000,00 | Ha | Tidak Dipakai | |
19132 | 2018 | 23.2.2.10.47.1 | Pelayanan Pengembalian Batas | | 2.550.000,00 | Ha | Tidak Dipakai | |
19133 | 2018 | 23.2.2.10.48.1 | Pelayanan Legalisasi Gambar Ukur Surveyor Berlisensi | | 510.000,00 | Ha | Tidak Dipakai | |
19134 | 2018 | 23.2.2.10.49.1 | Pelayanan Pemeriksaan Tanah Oleh Panitia A | | 750.000,00 | Ha | Tidak Dipakai | |
19135 | 2018 | 23.2.2.10.50.1 | Pelayanan Pemeriksaan Tanah Oleh Panitia B | | 5.006.700,00 | Ha | Tidak Dipakai | |
19136 | 2018 | 23.2.2.10.51.1 | Pelayanan Pemeriksaan Tanah Oleh Tim Peneliti Tanah | | 750.000,00 | Ha | Tidak Dipakai | |
19137 | 2018 | 23.2.2.10.52.1 | Pelayanan Pemeriksaan Tanah Oleh Petugas Konstatasi | | 350.000,00 | Ha | Tidak Dipakai | |
19138 | 2018 | 23.2.2.10.55.1 | Pengadaan Pipa PE Dia 50mm Tebal 4,6mm | | 37.702,00 | M | Tidak Dipakai | |
19139 | 2018 | 23.2.2.10.56.1 | Mobilisasi Pengangkutan Tiang | | 800.000,00 | unit | Tidak Dipakai | |
19140 | 2018 | 23.2.2.10.57.1 | Biaya Konekting Kabel | | 750.000,00 | unit | Dipakai | |