1781 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.60 |
Kerb Pracetak Jenis 4 (Penghalang Berparit) t=20 cm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0069 |
OH |
206.800,00 |
1.426,92 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0687 |
OH |
150.800,00 |
10.359,96 |
123.1.1.1.1.23 |
Tukang |
0.0275 |
OH |
177.500,00 |
4.881,25 |
|
|
|
|
Jumlah |
16.668,13 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
0.0798 |
M3 |
1.534.100,00 |
122.421,18 |
117.1.1.1.2.45 |
Mortar |
0.0105 |
M3 |
48.100,00 |
505,05 |
|
|
|
|
Jumlah |
122.926,23 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.29 |
Flat Bed Truck |
0.0481 |
jam |
844.500,00 |
40.620,45 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
42.020,45 |
|
|
|
|
Nilai HSPK |
181.614,81 |
| 2020 | 24.2.5.60 | Kerb Pracetak Jenis 4 (Penghalang Berparit) t=20 cm | M1 | 181.614,81 | Tidak Dipakai | |
1782 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.61 |
Kerb Pracetak Jenis 5 (Penghalang Berparit) t=30 cm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0069 |
OH |
206.800,00 |
1.426,92 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0687 |
OH |
150.800,00 |
10.359,96 |
123.1.1.1.1.23 |
Tukang |
0.0275 |
OH |
177.500,00 |
4.881,25 |
|
|
|
|
Jumlah |
16.668,13 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
0.0977 |
M3 |
1.534.100,00 |
149.881,57 |
117.1.1.1.2.45 |
Mortar |
0.0158 |
M3 |
48.100,00 |
759,98 |
|
|
|
|
Jumlah |
150.641,55 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.29 |
Flat Bed Truck |
0.0481 |
jam |
844.500,00 |
40.620,45 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
42.020,45 |
|
|
|
|
Nilai HSPK |
209.330,13 |
| 2020 | 24.2.5.61 | Kerb Pracetak Jenis 5 (Penghalang Berparit) t=30 cm | M1 | 209.330,13 | Tidak Dipakai | |
1783 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.62 |
Kerb Pracetak Jenis 6 (Kerb dengan bukaan) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0069 |
OH |
206.800,00 |
1.426,92 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0687 |
OH |
150.800,00 |
10.359,96 |
123.1.1.1.1.23 |
Tukang |
0.0275 |
OH |
177.500,00 |
4.881,25 |
|
|
|
|
Jumlah |
16.668,13 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
0.0246 |
M3 |
1.534.100,00 |
37.738,86 |
117.1.1.1.2.45 |
Mortar |
0.0105 |
M3 |
48.100,00 |
505,05 |
|
|
|
|
Jumlah |
38.243,91 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.29 |
Flat Bed Truck |
0.0481 |
jam |
844.500,00 |
40.620,45 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
42.020,45 |
|
|
|
|
Nilai HSPK |
96.932,49 |
| 2020 | 24.2.5.62 | Kerb Pracetak Jenis 6 (Kerb dengan bukaan) | M1 | 96.932,49 | Tidak Dipakai | |
1784 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.63 |
Kerb Pracetak Jenis 7 (Kerb pd pelandaian trotoar) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0098 |
OH |
206.800,00 |
2.026,64 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0977 |
OH |
150.800,00 |
14.733,16 |
123.1.1.1.1.23 |
Tukang |
0.0391 |
OH |
177.500,00 |
6.940,25 |
|
|
|
|
Jumlah |
23.700,05 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
0.3316 |
M3 |
1.534.100,00 |
508.707,58 |
117.1.1.1.2.45 |
Mortar |
0.0294 |
M3 |
48.100,00 |
1.414,14 |
|
|
|
|
Jumlah |
510.121,72 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.29 |
Flat Bed Truck |
0.0684 |
jam |
844.500,00 |
57.763,80 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
59.163,80 |
|
|
|
|
Nilai HSPK |
592.985,57 |
| 2020 | 24.2.5.63 | Kerb Pracetak Jenis 7 (Kerb pd pelandaian trotoar) | M1 | 592.985,57 | Tidak Dipakai | |
1785 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.64 |
Kerb Pracetak yang digunakan kembali |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0287 |
OH |
206.800,00 |
5.935,16 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1721 |
OH |
150.800,00 |
25.952,68 |
123.1.1.1.1.23 |
Tukang |
0.0574 |
OH |
177.500,00 |
10.188,50 |
|
|
|
|
Jumlah |
42.076,34 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.45 |
Mortar |
0.0165 |
M3 |
48.100,00 |
793,65 |
|
|
|
|
Jumlah |
793,65 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
0.0778 |
jam |
228.200,00 |
17.753,96 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
19.153,96 |
|
|
|
|
Nilai HSPK |
62.023,95 |
| 2020 | 24.2.5.64 | Kerb Pracetak yang digunakan kembali | M | 62.023,95 | Tidak Dipakai | |
1786 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.65 |
Perkerasan Blok Beton pada Trotoar dan Median |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.3442 |
OH |
206.800,00 |
71.180,56 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0574 |
OH |
150.800,00 |
8.655,92 |
123.1.1.1.1.23 |
Tukang |
0.2295 |
OH |
177.500,00 |
40.736,25 |
|
|
|
|
Jumlah |
120.572,73 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.1 |
Pasir |
0.05 |
M3 |
247.100,00 |
12.355,00 |
117.1.1.1.22.123 |
Besi Angkur |
0.5 |
Kg |
53.400,00 |
26.700,00 |
117.1.1.12.1.87 |
Paving blok |
1.05 |
M2 |
42.700,00 |
44.835,00 |
|
|
|
|
Jumlah |
83.890,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.48 |
Tamper |
0.241 |
jam |
68.100,00 |
16.412,10 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
17.812,10 |
|
|
|
|
Nilai HSPK |
222.274,82 |
| 2020 | 24.2.5.65 | Perkerasan Blok Beton pada Trotoar dan Median | M2 | 222.274,82 | Tidak Dipakai | |
1787 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.66 |
Pengecatan Cat anti karat |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0952 |
OH |
206.800,00 |
19.687,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.381 |
OH |
150.800,00 |
57.454,80 |
|
|
|
|
Jumlah |
77.142,16 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.3 |
Cat Anti Karet |
0.6 |
Kg |
38.200,00 |
22.920,00 |
117.1.1.1.6.49 |
Kertas Amplas |
2 |
lembar |
6.700,00 |
13.400,00 |
|
|
|
|
Jumlah |
36.320,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
114.862,16 |
| 2020 | 24.2.5.66 | Pengecatan Cat anti karat | M2 | 114.862,16 | Tidak Dipakai | |
1788 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.1 |
PemoTongan Pohon Pilihan diameter 15 – 30 cm |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
|
|
|
|
Jumlah |
85.740,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.10 |
Chain Saw |
1 |
jam |
100.100,00 |
100.100,00 |
123.2.2.1.2.24 |
Dump Truck |
0.289 |
jam |
513.600,00 |
148.430,40 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
249.930,40 |
|
|
|
|
Nilai HSPK |
335.670,40 |
| 2020 | 24.2.6.1 | PemoTongan Pohon Pilihan diameter 15 – 30 cm | buah | 335.670,40 | Tidak Dipakai | |
1789 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.2 |
PemoTongan Pohon Pilihan diameter 30 – 50 cm |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
|
|
|
|
Jumlah |
85.740,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.10 |
Chain Saw |
1 |
jam |
100.100,00 |
100.100,00 |
123.2.2.1.2.24 |
Dump Truck |
0.4329 |
jam |
513.600,00 |
222.337,45 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
323.837,45 |
|
|
|
|
Nilai HSPK |
409.577,45 |
| 2020 | 24.2.6.2 | PemoTongan Pohon Pilihan diameter 30 – 50 cm | buah | 409.577,45 | Tidak Dipakai | |
1790 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.3 |
PemoTongan Pohon Pilihan diameter 50 – 75 cm |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
|
|
|
|
Jumlah |
85.740,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.10 |
Chain Saw |
1 |
jam |
100.100,00 |
100.100,00 |
123.2.2.1.2.24 |
Dump Truck |
0.7246 |
jam |
513.600,00 |
372.154,57 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
473.654,57 |
|
|
|
|
Nilai HSPK |
559.394,57 |
| 2020 | 24.2.6.3 | PemoTongan Pohon Pilihan diameter 50 – 75 cm | buah | 559.394,57 | Tidak Dipakai | |
1791 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.4 |
PemoTongan Pohon Pilihan diameter > 75 cm |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0667 |
OH |
206.800,00 |
13.793,56 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.6667 |
OH |
150.800,00 |
100.538,36 |
|
|
|
|
Jumlah |
114.331,92 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.10 |
Chain Saw |
1.5385 |
jam |
100.100,00 |
154.003,85 |
123.2.2.1.2.24 |
Dump Truck |
1.5385 |
jam |
513.600,00 |
790.173,58 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
945.577,42 |
|
|
|
|
Nilai HSPK |
1.059.909,34 |
| 2020 | 24.2.6.4 | PemoTongan Pohon Pilihan diameter > 75 cm | buah | 1.059.909,34 | Tidak Dipakai | |
1792 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.5 |
Stabilisasi dengan Tanaman |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.04 |
OH |
150.800,00 |
6.032,00 |
123.1.1.1.1.23 |
Tukang |
0.02 |
OH |
177.500,00 |
3.550,00 |
|
|
|
|
Jumlah |
11.650,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.35 |
Acalypha |
10 |
Polibeg |
3.400,00 |
34.000,00 |
|
|
|
|
Jumlah |
34.000,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.61 |
Water Tank Truck |
0.0308 |
jam |
525.600,00 |
16.188,48 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
17.588,48 |
|
|
|
|
Nilai HSPK |
63.238,48 |
| 2020 | 24.2.6.5 | Stabilisasi dengan Tanaman | M2 | 63.238,48 | Tidak Dipakai | |
1793 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.6 |
Stabilisasi dengan Tanaman VS |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.03 |
OH |
150.800,00 |
4.524,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
5.558,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.309 |
Rumput Jagorawi |
1.2 |
M2 |
40.100,00 |
48.120,00 |
132.4.1.1.3.59 |
Tanah Humus/ Hitam |
0.033 |
M3 |
333.500,00 |
11.005,50 |
|
|
|
|
Jumlah |
59.125,50 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.61 |
Water Tank Truck |
0.0308 |
jam |
525.600,00 |
16.188,48 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
17.588,48 |
|
|
|
|
Nilai HSPK |
82.271,98 |
| 2020 | 24.2.6.6 | Stabilisasi dengan Tanaman VS | M2 | 82.271,98 | Tidak Dipakai | |
1794 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.7 |
Stabilisasi dengan Semak/Perdu |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.06 |
OH |
150.800,00 |
9.048,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
11.116,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.87 |
Bambu |
10 |
Pohon |
40.100,00 |
401.000,00 |
|
|
|
|
Jumlah |
401.000,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.61 |
Water Tank Truck |
0.0308 |
jam |
525.600,00 |
16.188,48 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
17.588,48 |
|
|
|
|
Nilai HSPK |
429.704,48 |
| 2020 | 24.2.6.7 | Stabilisasi dengan Semak/Perdu | M2 | 429.704,48 | Tidak Dipakai | |
1795 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.8 |
Stabilitasi dengan Pohon |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.06 |
OH |
150.800,00 |
9.048,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
11.116,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.298 |
Pulai |
1 |
Pohon |
200.100,00 |
200.100,00 |
132.4.1.1.3.59 |
Tanah Humus/ Hitam |
0.22 |
M3 |
333.500,00 |
73.370,00 |
|
|
|
|
Jumlah |
273.470,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.61 |
Water Tank Truck |
0.0308 |
jam |
525.600,00 |
16.188,48 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
17.588,48 |
|
|
|
|
Nilai HSPK |
302.174,48 |
| 2020 | 24.2.6.8 | Stabilitasi dengan Pohon | Pohon | 302.174,48 | Tidak Dipakai | |
1796 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.9 |
Menanam Rumput Bermuda |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
|
|
|
|
Jumlah |
17.148,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.306 |
Rumput Bermuda |
1 |
M2 |
13.400,00 |
13.400,00 |
132.4.1.1.3.59 |
Tanah Humus/ Hitam |
0.02 |
M3 |
333.500,00 |
6.670,00 |
|
|
|
|
Jumlah |
20.070,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
38.618,00 |
| 2020 | 24.2.6.9 | Menanam Rumput Bermuda | M2 | 38.618,00 | Tidak Dipakai | |
1797 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.10 |
Menanam Rumput Gajah Mini Varigata |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
|
|
|
|
Jumlah |
17.148,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.308 |
Rumput Gajah Mini Varigata |
1 |
M2 |
13.400,00 |
13.400,00 |
132.4.1.1.3.59 |
Tanah Humus/ Hitam |
0.02 |
M3 |
333.500,00 |
6.670,00 |
|
|
|
|
Jumlah |
20.070,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
38.618,00 |
| 2020 | 24.2.6.10 | Menanam Rumput Gajah Mini Varigata | M2 | 38.618,00 | Tidak Dipakai | |
1798 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.11 |
Menanam Rumput Gajah Mini |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
|
|
|
|
Jumlah |
17.148,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.307 |
Rumput Gajah Mini |
1 |
M2 |
33.400,00 |
33.400,00 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
132.4.1.1.3.59 |
Tanah Humus/ Hitam |
0.02 |
M3 |
333.500,00 |
6.670,00 |
|
|
|
|
Jumlah |
41.470,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
58.618,00 |
| 2020 | 24.2.6.11 | Menanam Rumput Gajah Mini | M2 | 58.618,00 | Tidak Dipakai | |
1799 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.12 |
Menanam Rumput Jagorawi |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
|
|
|
|
Jumlah |
17.148,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.309 |
Rumput Jagorawi |
1 |
M2 |
40.100,00 |
40.100,00 |
132.4.1.1.3.59 |
Tanah Humus/ Hitam |
0.02 |
M3 |
333.500,00 |
6.670,00 |
|
|
|
|
Jumlah |
46.770,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
65.318,00 |
| 2020 | 24.2.6.12 | Menanam Rumput Jagorawi | M2 | 65.318,00 | Tidak Dipakai | |
1800 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.6.13 |
Menanam Rumput Jepang |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
|
|
|
|
Jumlah |
17.148,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.8.3.310 |
Rumput Jepang |
1 |
M2 |
33.400,00 |
33.400,00 |
132.4.1.1.3.59 |
Tanah Humus/ Hitam |
0.02 |
M3 |
333.500,00 |
6.670,00 |
|
|
|
|
Jumlah |
40.070,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
58.618,00 |
| 2020 | 24.2.6.13 | Menanam Rumput Jepang | M2 | 58.618,00 | Tidak Dipakai | |