24.2.5.40 |
Campuran Aspal Dingin Utk.Pek.Minor |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0275 |
OH |
206.800,00 |
5.687,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1652 |
OH |
150.800,00 |
24.912,16 |
|
|
|
|
Jumlah |
30.599,16 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.18 |
Aspal Emulsi |
140.7 |
Kg |
1.300,00 |
182.910,00 |
117.1.1.1.2.67 |
Aggregat Halus |
1.1683 |
M3 |
224.200,00 |
261.932,87 |
|
|
|
|
Jumlah |
444.842,86 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
0.0963 |
jam |
228.200,00 |
21.975,66 |
123.2.2.1.2.24 |
Dump Truck |
0.3322 |
jam |
513.600,00 |
170.617,92 |
123.2.2.1.2.41 |
Pedestrian Roller |
0.1976 |
jam |
122.800,00 |
24.265,28 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
218.258,86 |
|
|
|
|
Nilai HSPK |
693.700,88 |
| 2020 | 24.2.5.40 | Campuran Aspal Dingin Utk.Pek.Minor | M3 | 693.700,88 | Tidak Dipakai | |
1762 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.41 |
Residu Bitumen Untuk Pek.Minor |
|
liter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0005 |
OH |
150.800,00 |
75,40 |
|
|
|
|
Jumlah |
75,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.17 |
Aspal |
0.99 |
Kg |
17.900,00 |
17.721,00 |
117.1.1.1.21.1 |
Kerosene |
0.14 |
liter |
10.700,00 |
1.498,00 |
|
|
|
|
Jumlah |
19.219,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.4 |
Asphalt Sprayer |
0.0003 |
jam |
85.400,00 |
25,62 |
123.2.2.1.2.12 |
Compressor |
0.0003 |
jam |
332.200,00 |
99,66 |
123.2.2.1.2.24 |
Dump Truck |
0.0003 |
jam |
513.600,00 |
154,08 |
|
|
|
|
Jumlah |
279,36 |
|
|
|
|
Nilai HSPK |
19.573,76 |
| 2020 | 24.2.5.41 | Residu Bitumen Untuk Pek.Minor | liter | 19.573,76 | Tidak Dipakai | |
1763 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.42 |
Pengembalian kondisi lantai jembatan Beton |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.019 |
OH |
206.800,00 |
3.929,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2286 |
OH |
150.800,00 |
34.472,88 |
|
|
|
|
Jumlah |
38.402,08 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.12 |
Compressor |
0.1333 |
jam |
332.200,00 |
44.282,26 |
123.2.2.1.2.32 |
Jack Hammer |
0.1333 |
jam |
50.700,00 |
6.758,31 |
123.2.2.1.2.64 |
Wheel Loader |
0.1333 |
jam |
844.500,00 |
112.571,86 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
165.012,43 |
|
|
|
|
Nilai HSPK |
203.414,51 |
| 2020 | 24.2.5.42 | Pengembalian kondisi lantai jembatan Beton | M2 | 203.414,51 | Tidak Dipakai | |
1764 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.43 |
Pengembalian kondisi lantai jembatan kayu |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.1429 |
OH |
206.800,00 |
29.551,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5714 |
OH |
150.800,00 |
86.167,12 |
|
|
|
|
Jumlah |
115.718,84 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.85 |
Papan/ Kaso Kayu Kelas I |
0.1 |
M3 |
21.864.300,00 |
2.186.430,03 |
117.1.1.1.22.230 |
Paku |
0.2 |
Kg |
25.700,00 |
5.140,00 |
|
|
|
|
Jumlah |
2.191.570,03 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
2.308.688,87 |
| 2020 | 24.2.5.43 | Pengembalian kondisi lantai jembatan kayu | M2 | 2.308.688,87 | Tidak Dipakai | |
1765 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.44 |
Pengembalian kondisi pelapisan permukaan baja struktur |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0952 |
OH |
206.800,00 |
19.687,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.381 |
OH |
150.800,00 |
57.454,80 |
|
|
|
|
Jumlah |
77.142,16 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.3 |
Cat Anti Karet |
0.6 |
Kg |
38.200,00 |
22.920,00 |
117.1.1.1.6.49 |
Kertas Amplas |
2 |
lembar |
6.700,00 |
13.400,00 |
|
|
|
|
Jumlah |
36.320,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
114.862,16 |
| 2020 | 24.2.5.44 | Pengembalian kondisi pelapisan permukaan baja struktur | M2 | 114.862,16 | Tidak Dipakai | |
1766 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.45 |
Marka Jalan Termoplastik |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0107 |
OH |
206.800,00 |
2.212,76 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0857 |
OH |
150.800,00 |
12.923,56 |
123.1.1.1.1.23 |
Tukang |
0.0322 |
OH |
177.500,00 |
5.715,50 |
|
|
|
|
Jumlah |
20.851,82 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.83 |
Thinner |
1.05 |
liter |
18.600,00 |
19.530,00 |
132.5.2.5.1.2 |
Glass Bead |
0.45 |
Kg |
3.300,00 |
1.485,00 |
132.18.1.3.1.18 |
Cat Marka Thermoplastic |
1.95 |
Kg |
28.600,00 |
55.770,00 |
|
|
|
|
Jumlah |
76.785,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.12 |
Compressor |
0.075 |
jam |
332.200,00 |
24.915,00 |
123.2.2.1.2.24 |
Dump Truck |
0.075 |
jam |
513.600,00 |
38.520,00 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
64.835,00 |
|
|
|
|
Nilai HSPK |
162.471,82 |
| 2020 | 24.2.5.45 | Marka Jalan Termoplastik | M2 | 162.471,82 | Tidak Dipakai | |
1767 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.46 |
Marka Jalan Bukan Termoplastic |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0107 |
OH |
206.800,00 |
2.212,76 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0857 |
OH |
150.800,00 |
12.923,56 |
123.1.1.1.1.23 |
Tukang |
0.0322 |
OH |
177.500,00 |
5.715,50 |
|
|
|
|
Jumlah |
20.851,82 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.83 |
Thinner |
1.05 |
liter |
18.600,00 |
19.530,00 |
132.5.2.5.1.2 |
Glass Bead |
0.45 |
Kg |
3.300,00 |
1.485,00 |
132.18.1.3.1.17 |
Cat Marka |
1.95 |
Kg |
25.900,00 |
50.505,00 |
|
|
|
|
Jumlah |
71.520,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.12 |
Compressor |
0.075 |
jam |
332.200,00 |
24.915,00 |
123.2.2.1.2.24 |
Dump Truck |
0.075 |
jam |
513.600,00 |
38.520,00 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
64.835,00 |
|
|
|
|
Nilai HSPK |
157.206,82 |
| 2020 | 24.2.5.46 | Marka Jalan Bukan Termoplastic | M2 | 157.206,82 | Tidak Dipakai | |
1768 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.47 |
Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0231 |
OH |
206.800,00 |
4.777,08 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1155 |
OH |
150.800,00 |
17.417,40 |
123.1.1.1.1.23 |
Tukang |
0.0693 |
OH |
177.500,00 |
12.300,75 |
|
|
|
|
Jumlah |
34.495,23 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.016 |
M3 |
1.374.100,00 |
21.985,60 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.22.265 |
Pelat Rambu |
1 |
buah |
400.200,00 |
400.200,00 |
117.2.2.1.2.9 |
Pipa Galvanis Dia. 1,6" |
1 |
batang |
243.400,00 |
243.400,00 |
|
|
|
|
Jumlah |
691.485,60 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.1617 |
jam |
513.600,00 |
83.049,12 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
84.449,12 |
|
|
|
|
Nilai HSPK |
810.429,95 |
| 2020 | 24.2.5.47 | Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade | buah | 810.429,95 | Tidak Dipakai | |
1769 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.48 |
Rambu Jalan Ganda dengan Permukaan Pemantul Engineering Grade |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0231 |
OH |
206.800,00 |
4.777,08 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1386 |
OH |
150.800,00 |
20.900,88 |
123.1.1.1.1.23 |
Tukang |
0.0693 |
OH |
177.500,00 |
12.300,75 |
|
|
|
|
Jumlah |
37.978,71 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.016 |
M3 |
1.374.100,00 |
21.985,60 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.22.265 |
Pelat Rambu |
2 |
buah |
400.200,00 |
800.400,00 |
117.2.2.1.2.9 |
Pipa Galvanis Dia. 1,6" |
1 |
batang |
243.400,00 |
243.400,00 |
|
|
|
|
Jumlah |
1.091.685,60 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.1617 |
jam |
513.600,00 |
83.049,12 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
84.449,12 |
|
|
|
|
Nilai HSPK |
1.214.113,43 |
| 2020 | 24.2.5.48 | Rambu Jalan Ganda dengan Permukaan Pemantul Engineering Grade | buah | 1.214.113,43 | Tidak Dipakai | |
1770 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.49 |
Rambu Jalan Tunggal dengan Permukaan Pemantul High Intensity Grade |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0231 |
OH |
206.800,00 |
4.777,08 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1155 |
OH |
150.800,00 |
17.417,40 |
123.1.1.1.1.23 |
Tukang |
0.0693 |
OH |
177.500,00 |
12.300,75 |
|
|
|
|
Jumlah |
34.495,23 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.016 |
M3 |
1.374.100,00 |
21.985,60 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.22.265 |
Pelat Rambu |
1 |
buah |
400.200,00 |
400.200,00 |
117.2.2.1.2.9 |
Pipa Galvanis Dia. 1,6" |
1 |
batang |
243.400,00 |
243.400,00 |
|
|
|
|
Jumlah |
691.485,60 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.1617 |
jam |
513.600,00 |
83.049,12 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
84.449,12 |
|
|
|
|
Nilai HSPK |
810.429,95 |
| 2020 | 24.2.5.49 | Rambu Jalan Tunggal dengan Permukaan Pemantul High Intensity Grade | buah | 810.429,95 | Tidak Dipakai | |
1771 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.50 |
Rambu Jalan Ganda dengan Permukaan Pemantul High Intensity Grade |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0231 |
OH |
206.800,00 |
4.777,08 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1155 |
OH |
150.800,00 |
17.417,40 |
123.1.1.1.1.23 |
Tukang |
0.0693 |
OH |
177.500,00 |
12.300,75 |
|
|
|
|
Jumlah |
34.495,23 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.016 |
M3 |
1.374.100,00 |
21.985,60 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.22.265 |
Pelat Rambu |
2 |
buah |
400.200,00 |
800.400,00 |
117.2.2.1.2.9 |
Pipa Galvanis Dia. 1,6" |
1 |
batang |
243.400,00 |
243.400,00 |
|
|
|
|
Jumlah |
1.091.685,60 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.1617 |
jam |
513.600,00 |
83.049,12 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
84.449,12 |
|
|
|
|
Nilai HSPK |
1.210.629,95 |
| 2020 | 24.2.5.50 | Rambu Jalan Ganda dengan Permukaan Pemantul High Intensity Grade | buah | 1.210.629,95 | Tidak Dipakai | |
1772 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.51 |
Patok Pengarah |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0141 |
OH |
206.800,00 |
2.915,88 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1125 |
OH |
150.800,00 |
16.965,00 |
123.1.1.1.1.23 |
Tukang |
0.0562 |
OH |
177.500,00 |
9.975,50 |
|
|
|
|
Jumlah |
29.856,38 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.0354 |
M3 |
1.374.100,00 |
48.643,14 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
4.6463 |
Kg |
16.900,00 |
78.522,47 |
|
|
|
|
Jumlah |
153.065,61 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.0984 |
jam |
513.600,00 |
50.538,24 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
51.938,24 |
|
|
|
|
Nilai HSPK |
234.860,22 |
| 2020 | 24.2.5.51 | Patok Pengarah | buah | 234.860,22 | Tidak Dipakai | |
1773 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.52 |
Patok Kilometer |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.016 |
OH |
206.800,00 |
3.308,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0798 |
OH |
150.800,00 |
12.033,84 |
123.1.1.1.1.23 |
Tukang |
0.0319 |
OH |
177.500,00 |
5.662,25 |
|
|
|
|
Jumlah |
21.004,89 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.1512 |
M3 |
1.374.100,00 |
207.763,92 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
18.9 |
Kg |
16.900,00 |
319.409,99 |
|
|
|
|
Jumlah |
553.073,91 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.1117 |
jam |
513.600,00 |
57.369,12 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
58.769,12 |
|
|
|
|
Nilai HSPK |
632.847,92 |
| 2020 | 24.2.5.52 | Patok Kilometer | buah | 632.847,92 | Tidak Dipakai | |
1774 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.53 |
Patok Hektometer |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.016 |
OH |
206.800,00 |
3.308,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0798 |
OH |
150.800,00 |
12.033,84 |
123.1.1.1.1.23 |
Tukang |
0.0319 |
OH |
177.500,00 |
5.662,25 |
|
|
|
|
Jumlah |
21.004,89 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.063 |
M3 |
1.374.100,00 |
86.568,30 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
7.875 |
Kg |
16.900,00 |
133.087,50 |
|
|
|
|
Jumlah |
245.555,80 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.1117 |
jam |
513.600,00 |
57.369,12 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
58.769,12 |
|
|
|
|
Nilai HSPK |
325.329,81 |
| 2020 | 24.2.5.53 | Patok Hektometer | buah | 325.329,81 | Tidak Dipakai | |
1775 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.54 |
Rel Pengaman |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0298 |
OH |
206.800,00 |
6.162,64 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2387 |
OH |
150.800,00 |
35.995,96 |
123.1.1.1.1.23 |
Tukang |
0.0597 |
OH |
177.500,00 |
10.596,75 |
|
|
|
|
Jumlah |
52.755,35 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.10.1 |
Patok Beton K-175 |
0.0929 |
buah |
773.800,00 |
71.886,02 |
117.1.1.1.14.32 |
Besi Beton Polos |
4.645 |
Kg |
16.900,00 |
78.500,50 |
|
|
|
|
Jumlah |
150.386,52 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.2089 |
jam |
513.600,00 |
107.291,04 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
108.691,04 |
|
|
|
|
Nilai HSPK |
311.832,91 |
| 2020 | 24.2.5.54 | Rel Pengaman | M1 | 311.832,91 | Tidak Dipakai | |
1776 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.55 |
Paku Jalan |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.25 |
OH |
150.800,00 |
37.700,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
65.790,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.063 |
M3 |
1.374.100,00 |
86.568,30 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.22.243 |
Paku Jalan |
1 |
buah |
25.700,00 |
25.700,00 |
|
|
|
|
Jumlah |
138.168,30 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
205.358,30 |
| 2020 | 24.2.5.55 | Paku Jalan | buah | 205.358,30 | Tidak Dipakai | |
1777 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.56 |
Mata Kucing |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.25 |
OH |
150.800,00 |
37.700,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
65.790,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
0.063 |
M3 |
1.374.100,00 |
86.568,30 |
117.1.1.1.6.66 |
Material Cat dan Lainnya |
1 |
M2 |
25.900,00 |
25.900,00 |
117.1.1.1.22.217 |
Mata Kucing |
1 |
Kg |
53.400,00 |
53.400,00 |
|
|
|
|
Jumlah |
165.868,30 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
233.058,30 |
| 2020 | 24.2.5.56 | Mata Kucing | buah | 233.058,30 | Tidak Dipakai | |
1778 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.57 |
Kerb Pracetak Jenis 1 (Peninggi/Mountable) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0063 |
OH |
206.800,00 |
1.302,84 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0629 |
OH |
150.800,00 |
9.485,32 |
123.1.1.1.1.23 |
Tukang |
0.0252 |
OH |
177.500,00 |
4.473,00 |
|
|
|
|
Jumlah |
15.261,16 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
0.0551 |
M3 |
1.534.100,00 |
84.528,91 |
117.1.1.1.2.45 |
Mortar |
0.0079 |
M3 |
48.100,00 |
379,99 |
|
|
|
|
Jumlah |
84.908,90 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.29 |
Flat Bed Truck |
0.044 |
jam |
844.500,00 |
37.158,00 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
38.558,00 |
|
|
|
|
Nilai HSPK |
138.728,06 |
| 2020 | 24.2.5.57 | Kerb Pracetak Jenis 1 (Peninggi/Mountable) | M1 | 138.728,06 | Tidak Dipakai | |
1779 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.58 |
Kerb Pracetak Jenis 2 (Penghalang/Barrier) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0065 |
OH |
206.800,00 |
1.344,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0655 |
OH |
150.800,00 |
9.877,40 |
123.1.1.1.1.23 |
Tukang |
0.0262 |
OH |
177.500,00 |
4.650,50 |
|
|
|
|
Jumlah |
15.872,10 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
0.006 |
M3 |
1.534.100,00 |
9.204,60 |
117.1.1.1.2.45 |
Mortar |
0.0158 |
M3 |
48.100,00 |
759,98 |
|
|
|
|
Jumlah |
9.964,58 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.29 |
Flat Bed Truck |
0.0458 |
jam |
844.500,00 |
38.678,10 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
40.078,10 |
|
|
|
|
Nilai HSPK |
65.914,78 |
| 2020 | 24.2.5.58 | Kerb Pracetak Jenis 2 (Penghalang/Barrier) | M1 | 65.914,78 | Tidak Dipakai | |
1780 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.59 |
Kerb Pracetak Jenis 3 (Kerb Berparit/Gutter) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0065 |
OH |
206.800,00 |
1.344,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0655 |
OH |
150.800,00 |
9.877,40 |
123.1.1.1.1.23 |
Tukang |
0.0262 |
OH |
177.500,00 |
4.650,50 |
|
|
|
|
Jumlah |
15.872,10 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
0.0664 |
M3 |
1.534.100,00 |
101.864,24 |
117.1.1.1.2.45 |
Mortar |
0.01 |
M3 |
48.100,00 |
481,00 |
|
|
|
|
Jumlah |
102.345,24 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.29 |
Flat Bed Truck |
0.0458 |
jam |
844.500,00 |
38.678,10 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
40.078,10 |
|
|
|
|
Nilai HSPK |
158.295,44 |