1721 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.35 |
Pengangkutan Bahan Jembatan |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0001 |
OH |
206.800,00 |
20,68 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.002 |
OH |
150.800,00 |
301,60 |
|
|
|
|
Jumlah |
322,28 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.23 |
Crane 80 Ton |
0.0001 |
jam |
951.200,00 |
95,12 |
123.2.2.1.2.55 |
Trailer 20 ton |
0.0003 |
jam |
880.500,00 |
264,15 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.759,27 |
|
|
|
|
Nilai HSPK |
2.081,55 |
| 2020 | 24.2.4.35 | Pengangkutan Bahan Jembatan | Kg | 2.081,55 | Tidak Dipakai | |
1722 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.1 |
Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0357 |
OH |
206.800,00 |
7.382,76 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3571 |
OH |
150.800,00 |
53.850,68 |
123.1.1.1.1.23 |
Tukang |
0.0714 |
OH |
177.500,00 |
12.673,50 |
|
|
|
|
Jumlah |
73.906,94 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
75.306,94 |
| 2020 | 24.2.5.1 | Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk | M1 | 75.306,94 | Tidak Dipakai | |
1723 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.2 |
Dinding Turap Kayu Tanpa Pengawetan |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0476 |
OH |
206.800,00 |
9.843,68 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4762 |
OH |
150.800,00 |
71.810,96 |
123.1.1.1.1.23 |
Tukang |
0.0952 |
OH |
177.500,00 |
16.898,00 |
|
|
|
|
Jumlah |
98.552,64 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
99.952,64 |
| 2020 | 24.2.5.2 | Dinding Turap Kayu Tanpa Pengawetan | M1 | 99.952,64 | Tidak Dipakai | |
1724 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.3 |
Dinding Turap Kayu Dengan Pengawetan |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0476 |
OH |
206.800,00 |
9.843,68 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5714 |
OH |
150.800,00 |
86.167,12 |
123.1.1.1.1.23 |
Tukang |
0.0952 |
OH |
177.500,00 |
16.898,00 |
|
|
|
|
Jumlah |
112.908,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.72 |
Material tiang pancang kayu |
1 |
M1 |
16.100,00 |
16.100,00 |
|
|
|
|
Jumlah |
16.100,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
130.408,80 |
| 2020 | 24.2.5.3 | Dinding Turap Kayu Dengan Pengawetan | M1 | 130.408,80 | Tidak Dipakai | |
1725 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.4 |
Dinding Turap Baja |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0005 |
OH |
150.800,00 |
75,40 |
123.1.1.1.1.23 |
Tukang |
0.0002 |
OH |
177.500,00 |
35,50 |
|
|
|
|
Jumlah |
110,90 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.16.7 |
Plat Baja |
0.21 |
Kg |
11.800,00 |
2.478,00 |
117.1.1.1.22.202 |
Kawat Las |
0.05 |
kotak |
140.100,00 |
7.005,00 |
117.1.1.1.22.326 |
Turap Baja |
1.05 |
Kg |
16.100,00 |
16.905,00 |
|
|
|
|
Jumlah |
26.388,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.23 |
Crane 80 Ton |
0.0001 |
jam |
951.200,00 |
95,12 |
123.2.2.1.2.55 |
Trailer 20 ton |
0.0001 |
jam |
880.500,00 |
88,05 |
123.2.2.1.2.63 |
Welding Set |
0.0004 |
jam |
209.500,00 |
83,80 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.666,97 |
|
|
|
|
Nilai HSPK |
28.165,87 |
| 2020 | 24.2.5.4 | Dinding Turap Baja | M1 | 28.165,87 | Tidak Dipakai | |
1726 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.5 |
Dinding Turap Beton |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
1.1905 |
OH |
206.800,00 |
246.195,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2381 |
OH |
150.800,00 |
35.905,48 |
123.1.1.1.1.23 |
Tukang |
0.2381 |
OH |
177.500,00 |
42.262,75 |
|
|
|
|
Jumlah |
324.363,64 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.13 |
Joint Sealent |
0.35 |
Kg |
36.500,00 |
12.775,00 |
117.1.1.1.2.32 |
Beton Pra Cetak K 350 |
0.07 |
M3 |
3.090.500,00 |
216.335,00 |
117.1.1.1.16.7 |
Plat Baja |
15.27 |
Kg |
11.800,00 |
180.186,01 |
|
|
|
|
Jumlah |
409.296,01 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.23 |
Crane 80 Ton |
0.0203 |
jam |
951.200,00 |
19.309,36 |
123.2.2.1.2.55 |
Trailer 20 ton |
0.0973 |
jam |
880.500,00 |
85.672,65 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
106.382,01 |
|
|
|
|
Nilai HSPK |
840.041,65 |
| 2020 | 24.2.5.5 | Dinding Turap Beton | M1 | 840.041,65 | Tidak Dipakai | |
1727 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.6 |
Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0476 |
OH |
206.800,00 |
9.843,68 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4762 |
OH |
150.800,00 |
71.810,96 |
123.1.1.1.1.23 |
Tukang |
0.0952 |
OH |
177.500,00 |
16.898,00 |
|
|
|
|
Jumlah |
98.552,64 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
99.952,64 |
| 2020 | 24.2.5.6 | Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm | M1 | 99.952,64 | Tidak Dipakai | |
1728 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.7 |
Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. mm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0476 |
OH |
206.800,00 |
9.843,68 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5714 |
OH |
150.800,00 |
86.167,12 |
123.1.1.1.1.23 |
Tukang |
0.0952 |
OH |
177.500,00 |
16.898,00 |
|
|
|
|
Jumlah |
112.908,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.72 |
Material tiang pancang kayu |
1 |
M1 |
16.100,00 |
16.100,00 |
|
|
|
|
Jumlah |
16.100,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
130.408,80 |
| 2020 | 24.2.5.7 | Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. mm | M1 | 130.408,80 | Tidak Dipakai | |
1729 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.8 |
Penyediaan Tiang Pancang Baja Diameter 35 cm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.2 |
OH |
150.800,00 |
180.960,01 |
123.1.1.1.1.23 |
Tukang |
0.4 |
OH |
177.500,00 |
71.000,00 |
|
|
|
|
Jumlah |
272.640,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.19 |
Tiang Pancang 30 cm |
1 |
M |
333.500,00 |
333.500,00 |
|
|
|
|
Jumlah |
333.500,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.23 |
Crane 80 Ton |
0.6024 |
jam |
951.200,00 |
573.002,88 |
123.2.2.1.2.55 |
Trailer 20 ton |
0.2309 |
jam |
880.500,00 |
203.307,45 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
777.710,34 |
|
|
|
|
Nilai HSPK |
1.383.850,35 |
| 2020 | 24.2.5.8 | Penyediaan Tiang Pancang Baja Diameter 35 cm | M1 | 1.383.850,35 | Tidak Dipakai | |
1730 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.9 |
Pemancangan Tiang Pancang Kayu Ukuran 600 mm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0646 |
OH |
206.800,00 |
13.359,28 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5171 |
OH |
150.800,00 |
77.978,68 |
123.1.1.1.1.23 |
Tukang |
0.1293 |
OH |
177.500,00 |
22.950,75 |
|
|
|
|
Jumlah |
114.288,71 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.43 |
Pile Driver |
0.4525 |
jam |
401.600,00 |
181.723,99 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
183.123,99 |
|
|
|
|
Nilai HSPK |
297.412,70 |
| 2020 | 24.2.5.9 | Pemancangan Tiang Pancang Kayu Ukuran 600 mm | M1 | 297.412,70 | Tidak Dipakai | |
1731 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.10 |
Pemancangan Tiang Pancang Baja Diameter 600 mm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0215 |
OH |
206.800,00 |
4.446,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1721 |
OH |
150.800,00 |
25.952,68 |
123.1.1.1.1.23 |
Tukang |
0.043 |
OH |
177.500,00 |
7.632,50 |
|
|
|
|
Jumlah |
38.031,38 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.43 |
Pile Driver |
0.1506 |
jam |
401.600,00 |
60.480,96 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
61.880,96 |
|
|
|
|
Nilai HSPK |
99.912,34 |
| 2020 | 24.2.5.10 | Pemancangan Tiang Pancang Baja Diameter 600 mm | M1 | 99.912,34 | Tidak Dipakai | |
1732 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.11 |
Pemancangan Tiang Pancang Baja Diameter 350 mm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0215 |
OH |
206.800,00 |
4.446,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1721 |
OH |
150.800,00 |
25.952,68 |
123.1.1.1.1.23 |
Tukang |
0.043 |
OH |
177.500,00 |
7.632,50 |
|
|
|
|
Jumlah |
38.031,38 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.43 |
Pile Driver |
0.1506 |
jam |
401.600,00 |
60.480,96 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
61.880,96 |
|
|
|
|
Nilai HSPK |
99.912,34 |
| 2020 | 24.2.5.11 | Pemancangan Tiang Pancang Baja Diameter 350 mm | M1 | 99.912,34 | Tidak Dipakai | |
1733 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.12 |
Pemancangan Tiang Pancang Beton . ukuran .... |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0172 |
OH |
206.800,00 |
3.556,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1721 |
OH |
150.800,00 |
25.952,68 |
123.1.1.1.1.23 |
Tukang |
0.0344 |
OH |
177.500,00 |
6.106,00 |
|
|
|
|
Jumlah |
35.615,64 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.43 |
Pile Driver |
0.1205 |
jam |
401.600,00 |
48.392,80 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
49.792,80 |
|
|
|
|
Nilai HSPK |
85.408,44 |
| 2020 | 24.2.5.12 | Pemancangan Tiang Pancang Beton . ukuran .... | M1 | 85.408,44 | Tidak Dipakai | |
1734 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.13 |
Tiang Bor Beton, diameter 800 mm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0002 |
OH |
206.800,00 |
41,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0014 |
OH |
150.800,00 |
211,12 |
123.1.1.1.1.23 |
Tukang |
0.0007 |
OH |
177.500,00 |
124,25 |
|
|
|
|
Jumlah |
376,73 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.19 |
Beton Cor K 250 |
0.5027 |
M3 |
1.467.400,00 |
737.661,94 |
117.1.1.1.8.10 |
Baja Tulangan (Ulir) U32 |
75.405 |
Kg |
32.900,00 |
2.480.824,46 |
|
|
|
|
Jumlah |
3.218.486,40 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.7 |
Bore Pile |
0.0017 |
jam |
1.768.900,00 |
3.007,13 |
123.2.2.1.2.17 |
Concrete Pump |
0.0757 |
jam |
557.700,00 |
42.217,89 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
46.625,02 |
|
|
|
|
Nilai HSPK |
3.265.488,15 |
| 2020 | 24.2.5.13 | Tiang Bor Beton, diameter 800 mm | M1 | 3.265.488,15 | Tidak Dipakai | |
1735 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.14 |
Tiang Bor Beton, diameter 1000 mm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0002 |
OH |
206.800,00 |
41,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0014 |
OH |
150.800,00 |
211,12 |
123.1.1.1.1.23 |
Tukang |
0.0007 |
OH |
177.500,00 |
124,25 |
|
|
|
|
Jumlah |
376,73 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.19 |
Beton Cor K 250 |
0.7854 |
M3 |
1.467.400,00 |
1.152.495,92 |
117.1.1.1.8.10 |
Baja Tulangan (Ulir) U32 |
117.81 |
Kg |
32.900,00 |
3.875.948,92 |
|
|
|
|
Jumlah |
5.028.444,84 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.7 |
Bore Pile |
0.0017 |
jam |
1.768.900,00 |
3.007,13 |
123.2.2.1.2.17 |
Concrete Pump |
0.1183 |
jam |
557.700,00 |
65.975,91 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
70.383,04 |
|
|
|
|
Nilai HSPK |
5.099.204,61 |
| 2020 | 24.2.5.14 | Tiang Bor Beton, diameter 1000 mm | M1 | 5.099.204,61 | Tidak Dipakai | |
1736 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.15 |
Tambahan Biaya Pemancangan bila Tiang Pancang dikerjakan di atas laut/sungai |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
1.0204 |
OH |
206.800,00 |
211.018,73 |
123.1.1.1.1.14 |
Pekerja Terlatih |
6.1224 |
OH |
150.800,00 |
923.257,89 |
123.1.1.1.1.23 |
Tukang |
2.0408 |
OH |
177.500,00 |
362.242,02 |
|
|
|
|
Jumlah |
1.496.518,64 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.21 |
Crane 40 Ton |
0.0057 |
jam |
557.700,00 |
3.178,89 |
123.2.2.1.2.45 |
Ponton + Tug Boat |
7.1429 |
jam |
751.100,00 |
5.365.032,18 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
5.369.611,07 |
|
|
|
|
Nilai HSPK |
6.866.129,71 |
| 2020 | 24.2.5.15 | Tambahan Biaya Pemancangan bila Tiang Pancang dikerjakan di atas laut/sungai | M1 | 6.866.129,71 | Tidak Dipakai | |
1737 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.16 |
Pasangan Batu Kali |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0978 |
OH |
206.800,00 |
20.225,04 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7828 |
OH |
150.800,00 |
118.046,24 |
123.1.1.1.1.23 |
Tukang |
0.1957 |
OH |
177.500,00 |
34.736,75 |
|
|
|
|
Jumlah |
173.008,03 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
151.2 |
Zak |
71.300,00 |
10.780.559,78 |
117.1.1.1.4.1 |
Pasir |
0.4362 |
M3 |
247.100,00 |
107.785,02 |
117.1.1.1.5.86 |
Batu Kali |
1.26 |
M3 |
400.200,00 |
504.252,00 |
|
|
|
|
Jumlah |
11.392.596,80 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
0.6849 |
jam |
228.200,00 |
156.294,18 |
123.2.2.1.2.62 |
Water Tanker |
0.0014 |
jam |
525.600,00 |
735,84 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
158.430,02 |
|
|
|
|
Nilai HSPK |
11.724.034,85 |
| 2020 | 24.2.5.16 | Pasangan Batu Kali | M3 | 11.724.034,85 | Tidak Dipakai | |
1738 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.17 |
Pasangan Batu Kosong Yang Diisi Adukan |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0978 |
OH |
206.800,00 |
20.225,04 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.9785 |
OH |
150.800,00 |
147.557,80 |
123.1.1.1.1.23 |
Tukang |
0.2935 |
OH |
177.500,00 |
52.096,25 |
|
|
|
|
Jumlah |
219.879,09 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
2.25 |
Zak |
71.300,00 |
160.425,00 |
117.1.1.1.2.68 |
Aggregat Kasar |
0.2829 |
M3 |
278.900,00 |
78.900,81 |
117.1.1.1.4.1 |
Pasir |
0.2181 |
M3 |
247.100,00 |
53.892,51 |
117.1.1.1.5.86 |
Batu Kali |
1.32 |
M3 |
400.200,00 |
528.264,02 |
|
|
|
|
Jumlah |
821.482,34 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
0.6849 |
jam |
228.200,00 |
156.294,18 |
123.2.2.1.2.62 |
Water Tanker |
0.0014 |
jam |
525.600,00 |
735,84 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
158.430,02 |
|
|
|
|
Nilai HSPK |
1.199.791,45 |
| 2020 | 24.2.5.17 | Pasangan Batu Kosong Yang Diisi Adukan | M3 | 1.199.791,45 | Tidak Dipakai | |
1739 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.18 |
Pasangan Batu Kosong |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.125 |
OH |
206.800,00 |
25.850,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.75 |
OH |
150.800,00 |
113.100,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
183.325,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.5.86 |
Batu Kali |
1.1 |
M3 |
400.200,00 |
440.220,01 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
441.620,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
624.945,01 |
| 2020 | 24.2.5.18 | Pasangan Batu Kosong | M3 | 624.945,01 | Tidak Dipakai | |
1740 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.5.19 |
Bronjong dengan kawat yang dilapisi galvanis |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.125 |
OH |
206.800,00 |
25.850,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.75 |
OH |
150.800,00 |
113.100,00 |
123.1.1.1.1.23 |
Tukang |
0.375 |
OH |
177.500,00 |
66.562,50 |
|
|
|
|
Jumlah |
205.512,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.5.86 |
Batu Kali |
1.1 |
M3 |
400.200,00 |
440.220,01 |
117.1.1.1.19.3 |
Kawat Bronjong |
15 |
Kg |
25.700,00 |
385.500,00 |
|
|
|
|
Jumlah |
825.720,01 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
1.032.632,51 |
| 2020 | 24.2.5.19 | Bronjong dengan kawat yang dilapisi galvanis | M3 | 1.032.632,51 | Tidak Dipakai | |