24.2.4.15 |
Penyediaan Unit Pracetak Gelagar I Tipe 1 Bentang 16 meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.1429 |
OH |
206.800,00 |
29.551,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.5714 |
OH |
150.800,00 |
387.767,11 |
123.1.1.1.1.23 |
Tukang |
0.7143 |
OH |
177.500,00 |
126.788,25 |
|
|
|
|
Jumlah |
544.107,08 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.26 |
Beton Cor K 500 |
4.25 |
M3 |
1.800.900,00 |
7.653.825,00 |
117.1.1.1.8.10 |
Baja Tulangan (Ulir) U32 |
566.01 |
Kg |
32.900,00 |
18.621.729,32 |
117.1.1.1.22.123 |
Besi Angkur |
6 |
Kg |
53.400,00 |
320.400,00 |
117.1.1.1.22.161 |
Ducting |
0 |
M |
53.400,00 |
0,00 |
117.1.1.1.22.186 |
Kabel Baja Prategang (Strand) |
283.92 |
Kg |
18.700,00 |
5.309.304,25 |
|
|
|
|
Jumlah |
31.905.258,57 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.22 |
Crane 60 Ton |
0.9009 |
jam |
725.700,00 |
653.783,13 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
655.183,13 |
|
|
|
|
Nilai HSPK |
33.104.548,78 |
| 2020 | 24.2.4.15 | Penyediaan Unit Pracetak Gelagar I Tipe 1 Bentang 16 meter | buah | 33.104.548,78 | Tidak Dipakai | |
1702 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.16 |
Penyediaan Unit Pracetak Gelagar I Tipe 1 Bentang 25 meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.1429 |
OH |
206.800,00 |
29.551,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.5714 |
OH |
150.800,00 |
387.767,11 |
123.1.1.1.1.23 |
Tukang |
0.7143 |
OH |
177.500,00 |
126.788,25 |
|
|
|
|
Jumlah |
544.107,08 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.26 |
Beton Cor K 500 |
6.6406 |
M3 |
1.800.900,00 |
11.959.056,91 |
117.1.1.1.8.10 |
Baja Tulangan (Ulir) U32 |
884.39 |
Kg |
32.900,00 |
29.096.431,48 |
117.1.1.1.22.123 |
Besi Angkur |
9 |
Kg |
53.400,00 |
480.600,00 |
117.1.1.1.22.161 |
Ducting |
225 |
M |
53.400,00 |
12.015.000,00 |
117.1.1.1.22.186 |
Kabel Baja Prategang (Strand) |
443.63 |
Kg |
18.700,00 |
8.295.881,09 |
|
|
|
|
Jumlah |
61.846.969,48 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.22 |
Crane 60 Ton |
0.9009 |
jam |
725.700,00 |
653.783,13 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
655.183,13 |
|
|
|
|
Nilai HSPK |
63.046.259,69 |
| 2020 | 24.2.4.16 | Penyediaan Unit Pracetak Gelagar I Tipe 1 Bentang 25 meter | buah | 63.046.259,69 | Tidak Dipakai | |
1703 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.17 |
Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.1429 |
OH |
206.800,00 |
29.551,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.5714 |
OH |
150.800,00 |
387.767,11 |
123.1.1.1.1.23 |
Tukang |
0.7143 |
OH |
177.500,00 |
126.788,25 |
|
|
|
|
Jumlah |
544.107,08 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.22 |
Crane 60 Ton |
0.9009 |
jam |
725.700,00 |
653.783,13 |
123.2.2.1.2.33 |
Jack Hidraulik |
1 |
jam |
54.700,00 |
54.700,00 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
709.883,13 |
|
|
|
|
Nilai HSPK |
1.253.990,21 |
| 2020 | 24.2.4.17 | Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter | buah | 1.253.990,21 | Tidak Dipakai | |
1704 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.18 |
Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.1429 |
OH |
206.800,00 |
29.551,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.5714 |
OH |
150.800,00 |
387.767,11 |
123.1.1.1.1.23 |
Tukang |
0.7143 |
OH |
177.500,00 |
126.788,25 |
|
|
|
|
Jumlah |
544.107,08 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.22 |
Crane 60 Ton |
0.9009 |
jam |
725.700,00 |
653.783,13 |
123.2.2.1.2.33 |
Jack Hidraulik |
1 |
jam |
54.700,00 |
54.700,00 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
709.883,13 |
|
|
|
|
Nilai HSPK |
1.253.990,21 |
| 2020 | 24.2.4.18 | Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter | buah | 1.253.990,21 | Tidak Dipakai | |
1705 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.19 |
Beton Diafragma Tepi 125x124x20 |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.1006 |
OH |
206.800,00 |
20.804,08 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.006 |
OH |
150.800,00 |
151.704,81 |
123.1.1.1.1.23 |
Tukang |
0.1006 |
OH |
177.500,00 |
17.856,50 |
|
|
|
|
Jumlah |
190.365,39 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.51 |
Pracetak K 350 |
0.31 |
M3 |
3.514.200,00 |
1.089.402,01 |
117.1.1.1.14.32 |
Besi Beton Polos |
55.8 |
Kg |
16.900,00 |
943.019,99 |
|
|
|
|
Jumlah |
2.032.422,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.23 |
Crane 80 Ton |
0.7042 |
jam |
951.200,00 |
669.835,07 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
671.235,07 |
|
|
|
|
Nilai HSPK |
2.894.022,45 |
| 2020 | 24.2.4.19 | Beton Diafragma Tepi 125x124x20 | buah | 2.894.022,45 | Tidak Dipakai | |
1706 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.20 |
Beton Diafragma Tepi 125x161x15 |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.1006 |
OH |
206.800,00 |
20.804,08 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.006 |
OH |
150.800,00 |
151.704,81 |
123.1.1.1.1.23 |
Tukang |
0.1006 |
OH |
177.500,00 |
17.856,50 |
|
|
|
|
Jumlah |
190.365,39 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.51 |
Pracetak K 350 |
0.3 |
M3 |
3.514.200,00 |
1.054.260,04 |
117.1.1.1.14.32 |
Besi Beton Polos |
54 |
Kg |
16.900,00 |
912.600,00 |
|
|
|
|
Jumlah |
1.966.860,04 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.23 |
Crane 80 Ton |
0.7042 |
jam |
951.200,00 |
669.835,07 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
671.235,07 |
|
|
|
|
Nilai HSPK |
2.828.460,49 |
| 2020 | 24.2.4.20 | Beton Diafragma Tepi 125x161x15 | buah | 2.828.460,49 | Tidak Dipakai | |
1707 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.21 |
Beton Plat Deck K350 (fc' 30 Mpa); (100x145x7) |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.1006 |
OH |
206.800,00 |
20.804,08 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.006 |
OH |
150.800,00 |
151.704,81 |
123.1.1.1.1.23 |
Tukang |
0.1006 |
OH |
177.500,00 |
17.856,50 |
|
|
|
|
Jumlah |
190.365,39 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.51 |
Pracetak K 350 |
0.31 |
M3 |
3.514.200,00 |
1.089.402,01 |
117.1.1.1.14.32 |
Besi Beton Polos |
55.8 |
Kg |
16.900,00 |
943.019,99 |
|
|
|
|
Jumlah |
2.032.422,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.23 |
Crane 80 Ton |
0.7042 |
jam |
951.200,00 |
669.835,07 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
671.235,07 |
|
|
|
|
Nilai HSPK |
2.894.022,45 |
| 2020 | 24.2.4.21 | Beton Plat Deck K350 (fc' 30 Mpa); (100x145x7) | buah | 2.894.022,45 | Tidak Dipakai | |
1708 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.22 |
Baja Prategang |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.043 |
OH |
206.800,00 |
8.892,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4303 |
OH |
150.800,00 |
64.889,24 |
123.1.1.1.1.23 |
Tukang |
0.043 |
OH |
177.500,00 |
7.632,50 |
|
|
|
|
Jumlah |
81.414,14 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.186 |
Kabel Baja Prategang (Strand) |
1 |
Kg |
18.700,00 |
18.700,00 |
|
|
|
|
Jumlah |
18.700,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.23 |
Crane 80 Ton |
0.3012 |
jam |
951.200,00 |
286.501,44 |
123.2.2.1.2.24 |
Dump Truck |
0.2674 |
jam |
513.600,00 |
137.336,64 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
425.238,08 |
|
|
|
|
Nilai HSPK |
525.352,22 |
| 2020 | 24.2.4.22 | Baja Prategang | Kg | 525.352,22 | Tidak Dipakai | |
1709 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.23 |
Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang 5 Meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.1429 |
OH |
206.800,00 |
29.551,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.7143 |
OH |
150.800,00 |
258.516,45 |
123.1.1.1.1.23 |
Tukang |
0.7143 |
OH |
177.500,00 |
126.788,25 |
|
|
|
|
Jumlah |
414.856,41 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.25 |
Beton Cor K 400 |
1.34 |
M3 |
1.634.200,00 |
2.189.828,05 |
117.1.1.1.2.43 |
Material Curing |
3.9 |
Kg |
8.100,00 |
31.590,00 |
117.1.1.1.2.44 |
Material Grouting |
11.28 |
Kg |
8.100,00 |
91.368,00 |
117.1.1.1.8.10 |
Baja Tulangan (Ulir) U32 |
289 |
Kg |
32.900,00 |
9.508.100,00 |
117.1.1.1.22.56 |
Kayu Perancah |
3.9 |
M3 |
3.952.700,00 |
15.415.530,38 |
117.1.1.1.22.123 |
Besi Angkur |
3 |
Kg |
53.400,00 |
160.200,00 |
117.1.1.1.22.186 |
Kabel Baja Prategang (Strand) |
6.38 |
Kg |
18.700,00 |
119.306,00 |
117.1.1.1.22.303 |
Selongsong |
5.92 |
meter |
29.400,00 |
174.048,00 |
|
|
|
|
Jumlah |
27.689.970,43 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.17 |
Concrete Pump |
24.7761 |
jam |
557.700,00 |
13.817.631,06 |
123.2.2.1.2.23 |
Crane 80 Ton |
0.9009 |
jam |
951.200,00 |
856.936,09 |
123.2.2.1.2.42 |
Penarik Kabel (jack) |
2.4 |
jam |
445.600,00 |
1.069.440,04 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
123.2.2.1.3.8 |
Alat Grouting |
2.7027 |
jam |
646.000,00 |
1.745.944,14 |
|
|
|
|
Jumlah |
17.491.351,32 |
|
|
|
|
Nilai HSPK |
45.596.178,17 |
| 2020 | 24.2.4.23 | Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang 5 Meter | buah | 45.596.178,17 | Tidak Dipakai | |
1710 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.24 |
Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang 5 Meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.1429 |
OH |
206.800,00 |
29.551,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.7143 |
OH |
150.800,00 |
258.516,45 |
123.1.1.1.1.23 |
Tukang |
0.7143 |
OH |
177.500,00 |
126.788,25 |
|
|
|
|
Jumlah |
414.856,41 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.25 |
Beton Cor K 400 |
2.27 |
M3 |
1.634.200,00 |
3.709.633,97 |
117.1.1.1.2.43 |
Material Curing |
4.19 |
Kg |
8.100,00 |
33.939,00 |
117.1.1.1.2.44 |
Material Grouting |
11.28 |
Kg |
8.100,00 |
91.368,00 |
117.1.1.1.8.10 |
Baja Tulangan (Ulir) U32 |
289 |
Kg |
32.900,00 |
9.508.100,00 |
117.1.1.1.22.56 |
Kayu Perancah |
4.19 |
M3 |
3.952.700,00 |
16.561.813,23 |
117.1.1.1.22.123 |
Besi Angkur |
3 |
Kg |
53.400,00 |
160.200,00 |
117.1.1.1.22.186 |
Kabel Baja Prategang (Strand) |
6.38 |
Kg |
18.700,00 |
119.306,00 |
117.1.1.1.22.303 |
Selongsong |
5.92 |
meter |
29.400,00 |
174.048,00 |
|
|
|
|
Jumlah |
30.358.408,20 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.17 |
Concrete Pump |
12.5374 |
jam |
557.700,00 |
6.992.108,12 |
123.2.2.1.2.19 |
Crane 100 Ton |
0.9009 |
jam |
1.056.600,00 |
951.890,95 |
123.2.2.1.2.42 |
Penarik Kabel (jack) |
2.4 |
jam |
445.600,00 |
1.069.440,04 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
123.2.2.1.3.8 |
Alat Grouting |
2.7027 |
jam |
646.000,00 |
1.745.944,14 |
|
|
|
|
Jumlah |
10.760.783,24 |
|
|
|
|
Nilai HSPK |
41.534.047,85 |
| 2020 | 24.2.4.24 | Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang 5 Meter | buah | 41.534.047,85 | Tidak Dipakai | |
1711 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.25 |
Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah pengecoran (post tension) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.1287 |
OH |
206.800,00 |
26.615,16 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.287 |
OH |
150.800,00 |
194.079,59 |
123.1.1.1.1.23 |
Tukang |
0.1287 |
OH |
177.500,00 |
22.844,25 |
|
|
|
|
Jumlah |
243.539,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.51 |
Pracetak K 350 |
0.158 |
M3 |
3.514.200,00 |
555.243,63 |
117.1.1.1.14.32 |
Besi Beton Polos |
31.6 |
Kg |
16.900,00 |
534.040,01 |
|
|
|
|
Jumlah |
1.089.283,63 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.23 |
Crane 80 Ton |
0.9009 |
jam |
951.200,00 |
856.936,09 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
858.336,09 |
|
|
|
|
Nilai HSPK |
2.191.158,72 |
| 2020 | 24.2.4.25 | Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah pengecoran (post tension) | M3 | 2.191.158,72 | Tidak Dipakai | |
1712 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.26 |
Besi Tulangan U 24 Polos |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0044 |
OH |
206.800,00 |
909,92 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0089 |
OH |
150.800,00 |
1.342,12 |
123.1.1.1.1.23 |
Tukang |
0.0044 |
OH |
177.500,00 |
781,00 |
|
|
|
|
Jumlah |
3.033,04 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.32 |
Besi Beton Polos |
1.1 |
Kg |
16.900,00 |
18.590,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.0025 |
Kg |
34.882,00 |
87,20 |
|
|
|
|
Jumlah |
18.677,21 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
23.110,25 |
| 2020 | 24.2.4.26 | Besi Tulangan U 24 Polos | Kg | 23.110,25 | Tidak Dipakai | |
1713 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.27 |
Besi Tulangan U 32 Polos |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.015 |
OH |
150.800,00 |
2.262,00 |
123.1.1.1.1.23 |
Tukang |
0.005 |
OH |
177.500,00 |
887,50 |
|
|
|
|
Jumlah |
4.183,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.8.10 |
Baja Tulangan (Ulir) U32 |
1.1 |
Kg |
32.900,00 |
36.190,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.02 |
Kg |
34.882,00 |
697,64 |
|
|
|
|
Jumlah |
36.887,64 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
42.471,14 |
| 2020 | 24.2.4.27 | Besi Tulangan U 32 Polos | Kg | 42.471,14 | Tidak Dipakai | |
1714 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.28 |
Besi Tulangan U 32 Ulir |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.015 |
OH |
150.800,00 |
2.262,00 |
123.1.1.1.1.23 |
Tukang |
0.005 |
OH |
177.500,00 |
887,50 |
|
|
|
|
Jumlah |
4.183,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.8.10 |
Baja Tulangan (Ulir) U32 |
1.1 |
Kg |
32.900,00 |
36.190,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.02 |
Kg |
34.882,00 |
697,64 |
|
|
|
|
Jumlah |
36.887,64 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
42.471,14 |
| 2020 | 24.2.4.28 | Besi Tulangan U 32 Ulir | Kg | 42.471,14 | Tidak Dipakai | |
1715 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.29 |
Besi Tulangan U 39 Ulir |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.015 |
OH |
150.800,00 |
2.262,00 |
123.1.1.1.1.23 |
Tukang |
0.005 |
OH |
177.500,00 |
887,50 |
|
|
|
|
Jumlah |
4.183,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.8.11 |
Baja Tulangan (Ulir) U39 |
1.1 |
Kg |
33.300,00 |
36.630,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.02 |
Kg |
34.882,00 |
697,64 |
|
|
|
|
Jumlah |
37.327,64 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
42.911,14 |
| 2020 | 24.2.4.29 | Besi Tulangan U 39 Ulir | Kg | 42.911,14 | Tidak Dipakai | |
1716 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.30 |
Besi Tulangan U 48 Ulir |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.015 |
OH |
150.800,00 |
2.262,00 |
123.1.1.1.1.23 |
Tukang |
0.005 |
OH |
177.500,00 |
887,50 |
|
|
|
|
Jumlah |
4.183,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.8.12 |
Baja Tulangan (Ulir) U48 |
1.1 |
Kg |
34.100,00 |
37.510,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.02 |
Kg |
34.882,00 |
697,64 |
|
|
|
|
Jumlah |
38.207,64 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
43.791,14 |
| 2020 | 24.2.4.30 | Besi Tulangan U 48 Ulir | Kg | 43.791,14 | Tidak Dipakai | |
1717 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.31 |
Anyaman Kawat Yang Dilas (Welded Wire Mesh) |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.03 |
OH |
150.800,00 |
4.524,00 |
123.1.1.1.1.23 |
Tukang |
0.01 |
OH |
177.500,00 |
1.775,00 |
|
|
|
|
Jumlah |
7.333,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.32 |
Besi Beton Polos |
1.1 |
Kg |
16.900,00 |
18.590,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.02 |
Kg |
34.882,00 |
697,64 |
|
|
|
|
Jumlah |
19.287,64 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.400,00 |
|
|
|
|
Nilai HSPK |
28.020,64 |
| 2020 | 24.2.4.31 | Anyaman Kawat Yang Dilas (Welded Wire Mesh) | Kg | 28.020,64 | Tidak Dipakai | |
1718 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.32 |
Penyediaan Baja Struktur BJ 34 (Titik Leleh 210 MPa) |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0001 |
OH |
150.800,00 |
15,08 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
15,08 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.504 |
Besi Profil |
1 |
Kg |
20.100,00 |
20.100,00 |
|
|
|
|
Jumlah |
20.100,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.23 |
Crane 80 Ton |
0.001 |
jam |
951.200,00 |
951,20 |
123.2.2.1.2.55 |
Trailer 20 ton |
0.0003 |
jam |
880.500,00 |
264,15 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
2.615,35 |
|
|
|
|
Nilai HSPK |
22.730,43 |
| 2020 | 24.2.4.32 | Penyediaan Baja Struktur BJ 34 (Titik Leleh 210 MPa) | Kg | 22.730,43 | Tidak Dipakai | |
1719 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.33 |
Pemasangan Baja Struktur BJ 34 (Titik Leleh 210 MPa) |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0029 |
OH |
206.800,00 |
599,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0001 |
OH |
150.800,00 |
15,08 |
123.1.1.1.1.23 |
Tukang |
0.0007 |
OH |
177.500,00 |
124,25 |
|
|
|
|
Jumlah |
739,05 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.23 |
Crane 80 Ton |
0.01 |
jam |
951.200,00 |
9.512,00 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
10.912,00 |
|
|
|
|
Nilai HSPK |
11.651,05 |
| 2020 | 24.2.4.33 | Pemasangan Baja Struktur BJ 34 (Titik Leleh 210 MPa) | Kg | 11.651,05 | Tidak Dipakai | |
1720 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.4.34 |
Pemasangan jembatan Rangka Baja |
|
Kg |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.0001 |
OH |
206.800,00 |
20,68 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0023 |
OH |
150.800,00 |
346,84 |
123.1.1.1.1.23 |
Tukang |
0.0006 |
OH |
177.500,00 |
106,50 |
|
|
|
|
Jumlah |
474,02 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.56 |
Kayu Perancah |
0.0002 |
M3 |
3.952.700,00 |
790,54 |
|
|
|
|
Jumlah |
790,54 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.22 |
Crane 60 Ton |
0.0008 |
jam |
725.700,00 |
580,56 |
123.2.2.1.3.1 |
Alat Bantu |
1 |
LS |
1.400,00 |
1.400,00 |
|
|
|
|
Jumlah |
1.980,56 |
|
|
|
|
Nilai HSPK |
3.245,12 |
| 2020 | 24.2.4.34 | Pemasangan jembatan Rangka Baja | Kg | 3.245,12 | Tidak Dipakai | |