1561 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.32 |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 7700VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.32 | Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 7700VA | unit | 1.616.466,95 | Tidak Dipakai | |
1562 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.33 |
Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 6600 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.33 | Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 6600 | unit | 1.616.466,95 | Tidak Dipakai | |
1563 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.34 |
Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 10600VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.34 | Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 10600VA | unit | 1.616.466,95 | Tidak Dipakai | |
1564 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.35 |
Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 13200VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.35 | Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 13200VA | unit | 1.616.466,95 | Tidak Dipakai | |
1565 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.36 |
Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 16500VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.36 | Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 16500VA | unit | 1.616.466,95 | Tidak Dipakai | |
1566 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.37 |
Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 23000VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.37 | Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 23000VA | unit | 1.616.466,95 | Tidak Dipakai | |
1567 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.38 |
Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 33000VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.38 | Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 33000VA | unit | 1.616.466,95 | Tidak Dipakai | |
1568 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.39 |
Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 41500VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.39 | Perakitan dan Pemasangan Panel Lampu PJU - 3 Phase 41500VA | unit | 1.616.466,95 | Tidak Dipakai | |
1569 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.40 |
Pemasangan Panel Meter 1 Phase |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.4 |
OH |
206.800,00 |
82.720,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.8 |
OH |
150.800,00 |
120.640,00 |
123.1.1.1.1.23 |
Tukang |
0.4 |
OH |
177.500,00 |
71.000,00 |
|
|
|
|
Jumlah |
274.360,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
2 |
buah |
6.100,00 |
12.200,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
|
|
|
|
Jumlah |
14.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
288.360,00 |
| 2020 | 24.2.2.40 | Pemasangan Panel Meter 1 Phase | unit | 288.360,00 | Tidak Dipakai | |
1570 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.41 |
Pemasangan Panel Meter 3 Phase |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.4 |
OH |
206.800,00 |
82.720,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.8 |
OH |
150.800,00 |
120.640,00 |
123.1.1.1.1.23 |
Tukang |
0.4 |
OH |
177.500,00 |
71.000,00 |
|
|
|
|
Jumlah |
274.360,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
2 |
buah |
6.100,00 |
12.200,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
|
|
|
|
Jumlah |
14.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
288.360,00 |
| 2020 | 24.2.2.41 | Pemasangan Panel Meter 3 Phase | unit | 288.360,00 | Tidak Dipakai | |
1571 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.42 |
Pemasangan Instalasi Perlaluan Arde Panel Meter |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.009 |
OH |
206.800,00 |
1.861,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0722 |
OH |
150.800,00 |
10.887,76 |
123.1.1.1.1.23 |
Tukang |
0.0361 |
OH |
177.500,00 |
6.407,75 |
|
|
|
|
Jumlah |
19.156,71 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
10.200,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
29.356,71 |
| 2020 | 24.2.2.42 | Pemasangan Instalasi Perlaluan Arde Panel Meter | unit | 29.356,71 | Tidak Dipakai | |
1572 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.43 |
Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.25 |
OH |
206.800,00 |
51.700,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.75 |
OH |
150.800,00 |
113.100,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
209.175,00 |
|
Bahan/Material: |
|
|
|
|
117.1.2.11.2.95 |
Armature Lampu HPS 150 W |
1 |
set |
2.423.100,00 |
2.423.100,00 |
|
|
|
|
Jumlah |
2.423.100,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.4 |
Alat Bantu Penerangan Jalan Umum (PJU) |
1 |
jam |
9.800,00 |
9.800,00 |
|
|
|
|
Jumlah |
9.800,00 |
|
|
|
|
Nilai HSPK |
2.642.075,00 |
| 2020 | 24.2.2.43 | Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor | unit | 2.642.075,00 | Tidak Dipakai | |
1573 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.44 |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.25 |
OH |
206.800,00 |
51.700,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.75 |
OH |
150.800,00 |
113.100,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
209.175,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.4 |
Alat Bantu Penerangan Jalan Umum (PJU) |
1 |
jam |
9.800,00 |
9.800,00 |
|
|
|
|
Jumlah |
9.800,00 |
|
|
|
|
Nilai HSPK |
218.975,00 |
| 2020 | 24.2.2.44 | Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor | unit | 218.975,00 | Tidak Dipakai | |
1574 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.45 |
Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.25 |
OH |
206.800,00 |
51.700,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.75 |
OH |
150.800,00 |
113.100,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
209.175,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.4 |
Alat Bantu Penerangan Jalan Umum (PJU) |
1 |
jam |
9.800,00 |
9.800,00 |
|
|
|
|
Jumlah |
9.800,00 |
|
|
|
|
Nilai HSPK |
218.975,00 |
| 2020 | 24.2.2.45 | Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor | unit | 218.975,00 | Tidak Dipakai | |
1575 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.46 |
Pemasangan Lampu Pendistrian LED |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.25 |
OH |
206.800,00 |
51.700,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.75 |
OH |
150.800,00 |
113.100,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
209.175,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.4 |
Alat Bantu Penerangan Jalan Umum (PJU) |
1 |
jam |
9.800,00 |
9.800,00 |
|
|
|
|
Jumlah |
9.800,00 |
|
|
|
|
Nilai HSPK |
218.975,00 |
| 2020 | 24.2.2.46 | Pemasangan Lampu Pendistrian LED | unit | 218.975,00 | Tidak Dipakai | |
1576 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.47 |
Pemasangan Lampu Jalan Raya LED |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.25 |
OH |
206.800,00 |
51.700,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.75 |
OH |
150.800,00 |
113.100,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
209.175,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.4 |
Alat Bantu Penerangan Jalan Umum (PJU) |
1 |
jam |
9.800,00 |
9.800,00 |
|
|
|
|
Jumlah |
9.800,00 |
|
|
|
|
Nilai HSPK |
218.975,00 |
| 2020 | 24.2.2.47 | Pemasangan Lampu Jalan Raya LED | unit | 218.975,00 | Tidak Dipakai | |
1577 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.48 |
Pondasi Biasa PJU |
|
titik |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.03 |
OH |
236.200,00 |
7.086,00 |
123.1.1.1.1.6 |
Mandor |
0.065 |
OH |
206.800,00 |
13.442,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.25 |
OH |
150.800,00 |
37.700,00 |
123.1.1.1.1.23 |
Tukang |
1.155 |
OH |
177.500,00 |
205.012,49 |
|
|
|
|
Jumlah |
263.240,49 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.18 |
Beton Cor K 225 |
0.24 |
M3 |
1.440.800,00 |
345.791,99 |
117.1.1.1.4.4 |
Pasir Pasang |
0.024 |
M3 |
180.100,00 |
4.322,40 |
117.1.1.1.14.32 |
Besi Beton Polos |
2.3663 |
Kg |
16.900,00 |
39.990,47 |
117.1.1.1.22.88 |
Papan/Kaso Kayu Kelas IV |
0.0144 |
M3 |
3.348.400,00 |
48.216,96 |
117.1.1.1.22.123 |
Besi Angkur |
4 |
Kg |
53.400,00 |
213.600,00 |
117.1.1.1.22.246 |
Paku Reng |
0.125 |
Kg |
21.000,00 |
2.625,00 |
|
|
|
|
Jumlah |
654.546,82 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
0.0076 |
jam |
228.200,00 |
1.734,32 |
123.2.2.1.2.59 |
Vibro Roller |
0.0076 |
jam |
617.700,00 |
4.694,52 |
123.2.2.1.3.4 |
Alat Bantu Penerangan Jalan Umum (PJU) |
0.1767 |
jam |
9.800,00 |
1.731,66 |
|
|
|
|
Jumlah |
8.160,50 |
|
|
|
|
Nilai HSPK |
925.947,82 |
| 2020 | 24.2.2.48 | Pondasi Biasa PJU | titik | 925.947,82 | Tidak Dipakai | |
1578 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.49 |
Pondasi Strous PJU |
|
titik |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.03 |
OH |
236.200,00 |
7.086,00 |
123.1.1.1.1.6 |
Mandor |
0.065 |
OH |
206.800,00 |
13.442,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.25 |
OH |
150.800,00 |
37.700,00 |
123.1.1.1.1.23 |
Tukang |
1.155 |
OH |
177.500,00 |
205.012,49 |
|
|
|
|
Jumlah |
263.240,49 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.4 |
Pasir Pasang |
0.024 |
M3 |
180.100,00 |
4.322,40 |
117.1.1.1.4.7 |
Penggalian Tanah Keras |
0.2077 |
M3 |
116.100,00 |
24.113,97 |
117.1.1.1.14.32 |
Besi Beton Polos |
25.018 |
Kg |
16.900,00 |
422.804,19 |
117.1.1.1.16.14 |
Plat Strip uk 3x 40 mm |
1.6 |
M |
55.800,00 |
89.280,00 |
117.1.1.1.22.88 |
Papan/Kaso Kayu Kelas IV |
0.0176 |
M3 |
3.348.400,00 |
58.931,84 |
117.1.1.1.22.123 |
Besi Angkur |
4 |
Kg |
53.400,00 |
213.600,00 |
117.1.1.1.22.198 |
Kawat ikat |
0.5 |
Kg |
30.700,00 |
15.350,00 |
117.1.1.1.22.246 |
Paku Reng |
0.125 |
Kg |
21.000,00 |
2.625,00 |
|
|
|
|
Jumlah |
831.027,41 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
0.0152 |
jam |
228.200,00 |
3.468,64 |
123.2.2.1.2.59 |
Vibro Roller |
0 |
jam |
617.700,00 |
0,00 |
123.2.2.1.3.4 |
Alat Bantu Penerangan Jalan Umum (PJU) |
0.2709 |
jam |
9.800,00 |
2.654,82 |
123.2.2.1.3.7 |
Alat Bantu Strous Pile |
1.2 |
jam |
14,20 |
17,04 |
|
|
|
|
Jumlah |
6.140,50 |
|
|
|
|
Nilai HSPK |
1.100.408,40 |
| 2020 | 24.2.2.49 | Pondasi Strous PJU | titik | 1.100.408,40 | Tidak Dipakai | |
1579 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.50 |
Pondasi Strous PJU Kabel Tanah |
|
titik |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.03 |
OH |
236.200,00 |
7.086,00 |
123.1.1.1.1.6 |
Mandor |
0.065 |
OH |
206.800,00 |
13.442,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.25 |
OH |
150.800,00 |
37.700,00 |
123.1.1.1.1.23 |
Tukang |
1.155 |
OH |
177.500,00 |
205.012,49 |
|
|
|
|
Jumlah |
263.240,49 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.18 |
Beton Cor K 225 |
0.1045 |
M3 |
1.440.800,00 |
150.563,60 |
117.1.1.1.2.50 |
Pemakaian Spesi Campuran Storus Pile (1 Pc : 1,5 Ps : 3 Kr ) |
0.1032 |
M3 |
1.044.700,00 |
107.813,04 |
117.1.1.1.4.4 |
Pasir Pasang |
0.024 |
M3 |
180.100,00 |
4.322,40 |
117.1.1.1.4.7 |
Penggalian Tanah Keras |
0.2077 |
M3 |
116.100,00 |
24.113,97 |
117.1.1.1.14.32 |
Besi Beton Polos |
25.018 |
Kg |
16.900,00 |
422.804,19 |
117.1.1.1.16.14 |
Plat Strip uk 3x 40 mm |
1.6 |
M |
55.800,00 |
89.280,00 |
117.1.1.1.22.88 |
Papan/Kaso Kayu Kelas IV |
0.096 |
M3 |
3.348.400,00 |
321.446,40 |
117.1.1.1.22.123 |
Besi Angkur |
4 |
Kg |
53.400,00 |
213.600,00 |
117.1.1.1.22.198 |
Kawat ikat |
0.5 |
Kg |
30.700,00 |
15.350,00 |
117.1.1.1.22.246 |
Paku Reng |
0.125 |
Kg |
21.000,00 |
2.625,00 |
117.2.2.6.1.33 |
Pipa PVC uk. 2 Pj. 4 m |
0.5 |
batang |
133.400,00 |
66.700,00 |
117.2.2.6.1.54 |
Elbow 45o 3 dm |
4 |
buah |
40.500,00 |
162.000,00 |
|
|
|
|
Jumlah |
1.580.618,62 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
0.0152 |
jam |
228.200,00 |
3.468,64 |
123.2.2.1.2.59 |
Vibro Roller |
0.0152 |
jam |
617.700,00 |
9.389,04 |
123.2.2.1.3.4 |
Alat Bantu Penerangan Jalan Umum (PJU) |
0.2709 |
jam |
9.800,00 |
2.654,82 |
123.2.2.1.3.7 |
Alat Bantu Strous Pile |
1.2 |
jam |
14,20 |
17,04 |
|
|
|
|
Jumlah |
15.529,54 |
|
|
|
|
Nilai HSPK |
1.859.388,65 |
| 2020 | 24.2.2.50 | Pondasi Strous PJU Kabel Tanah | titik | 1.859.388,65 | Tidak Dipakai | |
1580 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.51 |
Pemasangan Tiang Oktagonal 5 m Single Hot Dipped Galvanized dengan Flenders |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.13 |
OH |
206.800,00 |
26.884,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
222.059,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.318 |
Tiang Oktagonal 5 m Single Hot Dipped Galvanized dengan Flenders |
1 |
batang |
3.359.600,00 |
3.359.600,00 |
|
|
|
|
Jumlah |
3.359.600,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.20 |
Crane 20 Ton |
0.5 |
jam |
146.800,00 |
73.400,00 |
|
|
|
|
Jumlah |
73.400,00 |
|
|
|
|
Nilai HSPK |
3.655.059,00 |
| 2020 | 24.2.2.51 | Pemasangan Tiang Oktagonal 5 m Single Hot Dipped Galvanized dengan Flenders | unit | 3.655.059,00 | Tidak Dipakai | |