1541 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.12 |
Pemasangan Panel Tempat Ballast |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.3 |
OH |
206.800,00 |
62.040,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.6 |
OH |
150.800,00 |
90.480,00 |
123.1.1.1.1.23 |
Tukang |
0.3 |
OH |
177.500,00 |
53.250,00 |
|
|
|
|
Jumlah |
205.770,01 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
205.770,01 |
| 2020 | 24.2.2.12 | Pemasangan Panel Tempat Ballast | unit | 205.770,01 | Tidak Dipakai | |
1542 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.13 |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 2 x 16 mm |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0407 |
OH |
150.800,00 |
6.137,56 |
123.1.1.1.1.23 |
Tukang |
0.0051 |
OH |
177.500,00 |
905,25 |
|
|
|
|
Jumlah |
7.559,81 |
|
Bahan/Material: |
|
|
|
|
117.1.3.8.1.88 |
Kabel TWISTED 2 x 15 mm |
1 |
meter |
13.400,00 |
13.400,00 |
117.1.3.8.1.117 |
Twisted Kabel 2 x 16 mm |
1 |
meter |
12.200,00 |
12.200,00 |
|
|
|
|
Jumlah |
25.600,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
33.159,81 |
| 2020 | 24.2.2.13 | Pemasangan / Penarikan Kabel NFA2X (Twisted) 2 x 16 mm | M | 33.159,81 | Tidak Dipakai | |
1543 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.14 |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0407 |
OH |
150.800,00 |
6.137,56 |
123.1.1.1.1.23 |
Tukang |
0.0051 |
OH |
177.500,00 |
905,25 |
|
|
|
|
Jumlah |
7.559,81 |
|
Bahan/Material: |
|
|
|
|
117.1.3.8.1.118 |
Twisted Kabel 4 x 16 mm |
1 |
meter |
24.500,00 |
24.500,00 |
|
|
|
|
Jumlah |
24.500,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
32.059,81 |
| 2020 | 24.2.2.14 | Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm | M | 32.059,81 | Tidak Dipakai | |
1544 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.15 |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 2,5 m |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0407 |
OH |
150.800,00 |
6.137,56 |
123.1.1.1.1.23 |
Tukang |
0.0051 |
OH |
177.500,00 |
905,25 |
|
|
|
|
Jumlah |
7.559,81 |
|
Bahan/Material: |
|
|
|
|
117.1.3.8.1.96 |
Kabel NYM 2 x 2,5 mm |
2.5 |
meter |
585.700,00 |
1.464.250,00 |
|
|
|
|
Jumlah |
1.464.250,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.471.809,81 |
| 2020 | 24.2.2.15 | Instalasi 1 Titik Lampu PJU (Tarikan Udara) 2,5 m | M | 1.471.809,81 | Tidak Dipakai | |
1545 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.16 |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 3 m |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0407 |
OH |
150.800,00 |
6.137,56 |
123.1.1.1.1.23 |
Tukang |
0.0051 |
OH |
177.500,00 |
905,25 |
|
|
|
|
Jumlah |
7.559,81 |
|
Bahan/Material: |
|
|
|
|
117.1.3.8.1.96 |
Kabel NYM 2 x 2,5 mm |
3 |
meter |
585.700,00 |
1.757.100,00 |
|
|
|
|
Jumlah |
1.757.100,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.764.659,81 |
| 2020 | 24.2.2.16 | Instalasi 1 Titik Lampu PJU (Tarikan Udara) 3 m | M | 1.764.659,81 | Tidak Dipakai | |
1546 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.17 |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 4 m |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0407 |
OH |
150.800,00 |
6.137,56 |
123.1.1.1.1.23 |
Tukang |
0.0051 |
OH |
177.500,00 |
905,25 |
|
|
|
|
Jumlah |
7.559,81 |
|
Bahan/Material: |
|
|
|
|
117.1.3.8.1.96 |
Kabel NYM 2 x 2,5 mm |
4 |
meter |
585.700,00 |
2.342.800,00 |
|
|
|
|
Jumlah |
2.342.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.350.359,81 |
| 2020 | 24.2.2.17 | Instalasi 1 Titik Lampu PJU (Tarikan Udara) 4 m | M | 2.350.359,81 | Tidak Dipakai | |
1547 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.18 |
Intalasi 1 Titik Lampu PJU (Tarikan Udara) 7,5 m |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0407 |
OH |
150.800,00 |
6.137,56 |
123.1.1.1.1.23 |
Tukang |
0.0051 |
OH |
177.500,00 |
905,25 |
|
|
|
|
Jumlah |
7.559,81 |
|
Bahan/Material: |
|
|
|
|
117.1.3.8.1.96 |
Kabel NYM 2 x 2,5 mm |
7.5 |
meter |
585.700,00 |
4.392.750,00 |
|
|
|
|
Jumlah |
4.392.750,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
4.400.309,81 |
| 2020 | 24.2.2.18 | Intalasi 1 Titik Lampu PJU (Tarikan Udara) 7,5 m | M | 4.400.309,81 | Tidak Dipakai | |
1548 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.19 |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 10,5 m |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0407 |
OH |
150.800,00 |
6.137,56 |
123.1.1.1.1.23 |
Tukang |
0.0051 |
OH |
177.500,00 |
905,25 |
|
|
|
|
Jumlah |
7.559,81 |
|
Bahan/Material: |
|
|
|
|
117.1.3.8.1.96 |
Kabel NYM 2 x 2,5 mm |
10.5 |
meter |
585.700,00 |
6.149.850,00 |
|
|
|
|
Jumlah |
6.149.850,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
6.157.409,81 |
| 2020 | 24.2.2.19 | Instalasi 1 Titik Lampu PJU (Tarikan Udara) 10,5 m | M | 6.157.409,81 | Tidak Dipakai | |
1549 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.20 |
Instalasi 1 Titik Lampu (Tarikan Udara) 11,5 m |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0407 |
OH |
150.800,00 |
6.137,56 |
123.1.1.1.1.23 |
Tukang |
0.0051 |
OH |
177.500,00 |
905,25 |
|
|
|
|
Jumlah |
7.559,81 |
|
Bahan/Material: |
|
|
|
|
117.1.3.8.1.96 |
Kabel NYM 2 x 2,5 mm |
11.5 |
meter |
585.700,00 |
6.735.550,00 |
|
|
|
|
Jumlah |
6.735.550,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
6.743.109,81 |
| 2020 | 24.2.2.20 | Instalasi 1 Titik Lampu (Tarikan Udara) 11,5 m | M | 6.743.109,81 | Tidak Dipakai | |
1550 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.21 |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 13 m |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0407 |
OH |
150.800,00 |
6.137,56 |
123.1.1.1.1.23 |
Tukang |
0.0051 |
OH |
177.500,00 |
905,25 |
|
|
|
|
Jumlah |
7.559,81 |
|
Bahan/Material: |
|
|
|
|
117.1.3.8.1.96 |
Kabel NYM 2 x 2,5 mm |
13 |
meter |
585.700,00 |
7.614.100,00 |
|
|
|
|
Jumlah |
7.614.100,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
7.621.659,81 |
| 2020 | 24.2.2.21 | Instalasi 1 Titik Lampu PJU (Tarikan Udara) 13 m | M | 7.621.659,81 | Tidak Dipakai | |
1551 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.22 |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0407 |
OH |
150.800,00 |
6.137,56 |
123.1.1.1.1.23 |
Tukang |
0.0051 |
OH |
177.500,00 |
905,25 |
|
|
|
|
Jumlah |
7.559,81 |
|
Bahan/Material: |
|
|
|
|
117.1.3.8.1.96 |
Kabel NYM 2 x 2,5 mm |
18 |
meter |
585.700,00 |
10.542.600,00 |
|
|
|
|
Jumlah |
10.542.600,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
10.550.159,81 |
| 2020 | 24.2.2.22 | Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m | M | 10.550.159,81 | Tidak Dipakai | |
1552 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.23 |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0407 |
OH |
150.800,00 |
6.137,56 |
123.1.1.1.1.23 |
Tukang |
0.0051 |
OH |
177.500,00 |
905,25 |
|
|
|
|
Jumlah |
7.559,81 |
|
Bahan/Material: |
|
|
|
|
117.1.3.8.1.96 |
Kabel NYM 2 x 2,5 mm |
26.5 |
meter |
585.700,00 |
15.521.050,00 |
|
|
|
|
Jumlah |
15.521.050,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
15.528.609,81 |
| 2020 | 24.2.2.23 | Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m | M | 15.528.609,81 | Tidak Dipakai | |
1553 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.24 |
Pemasangan Ornamen Lampu PJU panjang 1,5 m |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.125 |
OH |
206.800,00 |
25.850,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.6 |
OH |
150.800,00 |
90.480,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
151.830,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.4 |
Alat Bantu Penerangan Jalan Umum (PJU) |
2 |
jam |
9.800,00 |
19.600,00 |
|
|
|
|
Jumlah |
19.600,00 |
|
|
|
|
Nilai HSPK |
171.430,00 |
| 2020 | 24.2.2.24 | Pemasangan Ornamen Lampu PJU panjang 1,5 m | buah | 171.430,00 | Tidak Dipakai | |
1554 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.25 |
Pemasangan Ornamen Lampu PJU panjang 2m |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.125 |
OH |
206.800,00 |
25.850,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.6 |
OH |
150.800,00 |
90.480,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
151.830,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.4 |
Alat Bantu Penerangan Jalan Umum (PJU) |
2 |
jam |
9.800,00 |
19.600,00 |
|
|
|
|
Jumlah |
19.600,00 |
|
|
|
|
Nilai HSPK |
171.430,00 |
| 2020 | 24.2.2.25 | Pemasangan Ornamen Lampu PJU panjang 2m | buah | 171.430,00 | Tidak Dipakai | |
1555 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.26 |
Pemasangan Ornamen Lampu PJU panjang 3m |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.125 |
OH |
206.800,00 |
25.850,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.6 |
OH |
150.800,00 |
90.480,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
151.830,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.16.12 |
Plat Besi/Baja 244 x 122, tebal 1,8 mm |
5 |
Lonjor |
628.500,00 |
3.142.500,00 |
|
|
|
|
Jumlah |
3.142.500,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.4 |
Alat Bantu Penerangan Jalan Umum (PJU) |
2 |
jam |
9.800,00 |
19.600,00 |
|
|
|
|
Jumlah |
19.600,00 |
|
|
|
|
Nilai HSPK |
3.313.930,00 |
| 2020 | 24.2.2.26 | Pemasangan Ornamen Lampu PJU panjang 3m | buah | 3.313.930,00 | Tidak Dipakai | |
1556 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.27 |
Pemasangan Ornamen Lampu PJU panjang 6m |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.6 |
Mandor |
0.125 |
OH |
206.800,00 |
25.850,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.6 |
OH |
150.800,00 |
90.480,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
151.830,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.16.12 |
Plat Besi/Baja 244 x 122, tebal 1,8 mm |
3.5157 |
Lonjor |
628.500,00 |
2.209.617,51 |
|
|
|
|
Jumlah |
2.209.617,51 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.4 |
Alat Bantu Penerangan Jalan Umum (PJU) |
2 |
jam |
9.800,00 |
19.600,00 |
|
|
|
|
Jumlah |
19.600,00 |
|
|
|
|
Nilai HSPK |
2.381.047,52 |
| 2020 | 24.2.2.27 | Pemasangan Ornamen Lampu PJU panjang 6m | buah | 2.381.047,52 | Tidak Dipakai | |
1557 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.28 |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
117.2.2.6.1.30 |
Pipa PVC Pelaluan Arde |
3 |
batang |
6.700,00 |
20.100,00 |
|
|
|
|
Jumlah |
1.084.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.636.566,95 |
| 2020 | 24.2.2.28 | Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA | unit | 1.636.566,95 | Tidak Dipakai | |
1558 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.29 |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 3500VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.29 | Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 3500VA | unit | 1.616.466,95 | Tidak Dipakai | |
1559 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.30 |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 4400VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.30 | Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 4400VA | unit | 1.616.466,95 | Tidak Dipakai | |
1560 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.31 |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 5500VA |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0747 |
OH |
206.800,00 |
15.447,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.2422 |
OH |
150.800,00 |
338.123,74 |
123.1.1.1.1.23 |
Tukang |
1.1211 |
OH |
177.500,00 |
198.995,24 |
|
|
|
|
Jumlah |
552.566,95 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.169 |
Grounding Roud (Arde) 16 mm |
1 |
buah |
977.700,00 |
977.700,00 |
117.1.1.1.22.187 |
Kabel Glen / Water mur PG- 21 |
4 |
buah |
6.100,00 |
24.400,00 |
117.1.1.1.22.188 |
Kabel Glen / Water Mur PG- 7 |
1 |
buah |
1.800,00 |
1.800,00 |
117.1.1.1.22.307 |
Stenless Tie + Clip (Yuke) + Ring |
3 |
buah |
16.600,00 |
49.800,00 |
117.2.2.6.1.1 |
Keni Pipa PVC 1/2 inchi (putih) |
2 |
buah |
5.100,00 |
10.200,00 |
|
|
|
|
Jumlah |
1.063.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.616.466,95 |
| 2020 | 24.2.2.31 | Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 5500VA | unit | 1.616.466,95 | Tidak Dipakai | |