1521 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.6 |
Kanstin BDCM 21.5 |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.001 |
OH |
206.800,00 |
206,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
22.526,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
0.0454 |
Kg |
2.600,00 |
118,04 |
117.1.1.1.4.4 |
Pasir Pasang |
0.0054 |
M3 |
180.100,00 |
972,54 |
117.1.1.12.1.55 |
Kanstin BDCM 21.5 m |
5 |
buah |
19.500,00 |
97.500,00 |
|
|
|
|
Jumlah |
98.590,58 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
121.117,38 |
| 2020 | 24.2.1.6 | Kanstin BDCM 21.5 | M | 121.117,38 | Tidak Dipakai | |
1522 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.7 |
Kanstin Trap uk. 15.25.40 ; K-175 |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.001 |
OH |
206.800,00 |
206,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
22.526,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
0.0454 |
Kg |
2.600,00 |
118,04 |
117.1.1.1.4.4 |
Pasir Pasang |
0.054 |
M3 |
180.100,00 |
9.725,40 |
117.1.1.12.1.56 |
Kanstin Trap uk.15.25.40 (me) |
1.1 |
M |
86.600,00 |
95.260,00 |
|
|
|
|
Jumlah |
105.103,44 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
127.630,24 |
| 2020 | 24.2.1.7 | Kanstin Trap uk. 15.25.40 ; K-175 | M | 127.630,24 | Tidak Dipakai | |
1523 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.8 |
Stopper/Uskup tebal 6 cm abu - abu |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.001 |
OH |
206.800,00 |
206,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
22.526,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.4 |
Pasir Pasang |
0.001 |
M3 |
180.100,00 |
180,10 |
117.1.1.12.1.102 |
Stopper / Uskup Tb 6 cm abu-abu |
3.34 |
buah |
8.300,00 |
27.722,00 |
|
|
|
|
Jumlah |
27.902,10 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
50.428,90 |
| 2020 | 24.2.1.8 | Stopper/Uskup tebal 6 cm abu - abu | M | 50.428,90 | Tidak Dipakai | |
1524 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.9 |
Stopper/Uskup tebal 8 cm abu - abu |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.001 |
OH |
206.800,00 |
206,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
22.526,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.4 |
Pasir Pasang |
0.001 |
M3 |
180.100,00 |
180,10 |
117.1.1.12.1.104 |
Stopper/ Uskup Tb 8 cm abu-abu |
3.34 |
buah |
9.100,00 |
30.394,00 |
|
|
|
|
Jumlah |
30.574,10 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
53.100,90 |
| 2020 | 24.2.1.9 | Stopper/Uskup tebal 8 cm abu - abu | M | 53.100,90 | Tidak Dipakai | |
1525 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.10 |
Stopper/Uskup tebal 6 cm warna |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.001 |
OH |
206.800,00 |
206,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
22.526,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.4 |
Pasir Pasang |
0.001 |
M3 |
180.100,00 |
180,10 |
117.1.1.12.1.103 |
Stopper/Uskup Tb 6 cm warna |
3.34 |
buah |
7.700,00 |
25.718,00 |
|
|
|
|
Jumlah |
25.898,10 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
48.424,90 |
| 2020 | 24.2.1.10 | Stopper/Uskup tebal 6 cm warna | M | 48.424,90 | Tidak Dipakai | |
1526 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.11 |
Stopper/Uskup tebal 8 cm warna |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.001 |
OH |
206.800,00 |
206,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
22.526,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.4 |
Pasir Pasang |
0.001 |
M3 |
180.100,00 |
180,10 |
117.1.1.12.1.105 |
Stopper/ Uskup Tb 8 cm warna |
3.34 |
buah |
9.800,00 |
32.732,00 |
|
|
|
|
Jumlah |
32.912,10 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
55.438,90 |
| 2020 | 24.2.1.11 | Stopper/Uskup tebal 8 cm warna | M | 55.438,90 | Tidak Dipakai | |
1527 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.12 |
Pembongkaran Paving Dipakai Kembali |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.04 |
OH |
150.800,00 |
6.032,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
10.168,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
10.168,00 |
| 2020 | 24.2.1.12 | Pembongkaran Paving Dipakai Kembali | M2 | 10.168,00 | Tidak Dipakai | |
1528 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.13 |
Pembongkaran Paving Tidak Dipakai Kembali |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.02 |
OH |
150.800,00 |
3.016,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
5.084,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
5.084,00 |
| 2020 | 24.2.1.13 | Pembongkaran Paving Tidak Dipakai Kembali | M2 | 5.084,00 | Tidak Dipakai | |
1529 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.14 |
Pemasangan Grass Block |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
27.490,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.4 |
Pasir Pasang |
0.1 |
M3 |
180.100,00 |
18.010,00 |
117.1.1.12.1.52 |
Grass Block 54 cm x 36 cm x 10 cm |
1.1 |
buah |
121.400,00 |
133.540,00 |
|
|
|
|
Jumlah |
151.550,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
179.040,00 |
| 2020 | 24.2.1.14 | Pemasangan Grass Block | M2 | 179.040,00 | Tidak Dipakai | |
1530 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.1 |
Pemasangan Konektor Kabel |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0006 |
OH |
206.800,00 |
124,08 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0089 |
OH |
150.800,00 |
1.342,12 |
123.1.1.1.1.23 |
Tukang |
0.0011 |
OH |
177.500,00 |
195,25 |
|
|
|
|
Jumlah |
1.661,45 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.661,45 |
| 2020 | 24.2.2.1 | Pemasangan Konektor Kabel | buah | 1.661,45 | Tidak Dipakai | |
1531 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.2 |
Pemasangan dan Penarikan Kabel |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0407 |
OH |
150.800,00 |
6.137,56 |
123.1.1.1.1.23 |
Tukang |
0.0051 |
OH |
177.500,00 |
905,25 |
|
|
|
|
Jumlah |
7.559,81 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
7.559,81 |
| 2020 | 24.2.2.2 | Pemasangan dan Penarikan Kabel | M | 7.559,81 | Tidak Dipakai | |
1532 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.3 |
Pemasangan Kabel Bawah Tanah |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.75 |
OH |
150.800,00 |
113.100,00 |
123.1.1.1.1.23 |
Tukang |
0.5 |
OH |
177.500,00 |
88.750,00 |
|
|
|
|
Jumlah |
207.020,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.34 |
Mesin Bor galian kabel bawah tanah |
0.5 |
jam |
200.100,00 |
100.050,00 |
|
|
|
|
Jumlah |
100.050,00 |
|
|
|
|
Nilai HSPK |
307.070,00 |
| 2020 | 24.2.2.3 | Pemasangan Kabel Bawah Tanah | M | 307.070,00 | Tidak Dipakai | |
1533 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.4 |
Roll Pipa 1,5" |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2133 |
OH |
150.800,00 |
32.165,64 |
123.1.1.1.1.23 |
Tukang |
0.1067 |
OH |
177.500,00 |
18.939,25 |
|
|
|
|
Jumlah |
51.104,89 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.6 |
Alat Bantu Roll Pipa |
1 |
jam |
3.700,00 |
3.700,00 |
|
|
|
|
Jumlah |
3.700,00 |
|
|
|
|
Nilai HSPK |
54.804,89 |
| 2020 | 24.2.2.4 | Roll Pipa 1,5" | unit | 54.804,89 | Tidak Dipakai | |
1534 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.5 |
Roll Pipa 2" |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2667 |
OH |
150.800,00 |
40.218,36 |
123.1.1.1.1.23 |
Tukang |
0.1333 |
OH |
177.500,00 |
23.660,75 |
|
|
|
|
Jumlah |
63.879,11 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.6 |
Alat Bantu Roll Pipa |
1 |
jam |
3.700,00 |
3.700,00 |
|
|
|
|
Jumlah |
3.700,00 |
|
|
|
|
Nilai HSPK |
67.579,11 |
| 2020 | 24.2.2.5 | Roll Pipa 2" | unit | 67.579,11 | Tidak Dipakai | |
1535 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.6 |
Roll Pipa 3" |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
119.775,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.6 |
Alat Bantu Roll Pipa |
1 |
jam |
3.700,00 |
3.700,00 |
|
|
|
|
Jumlah |
3.700,00 |
|
|
|
|
Nilai HSPK |
123.475,00 |
| 2020 | 24.2.2.6 | Roll Pipa 3" | unit | 123.475,00 | Tidak Dipakai | |
1536 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.7 |
Roll Pipa 4" |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.8 |
OH |
150.800,00 |
120.640,00 |
123.1.1.1.1.23 |
Tukang |
0.4 |
OH |
177.500,00 |
71.000,00 |
|
|
|
|
Jumlah |
191.640,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.6 |
Alat Bantu Roll Pipa |
1 |
jam |
3.700,00 |
3.700,00 |
|
|
|
|
Jumlah |
3.700,00 |
|
|
|
|
Nilai HSPK |
195.340,00 |
| 2020 | 24.2.2.7 | Roll Pipa 4" | unit | 195.340,00 | Tidak Dipakai | |
1537 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.8 |
Pemasangan Kabel dalam Pipa Pekerjaan Instalasi Jaringan Bawah Tanah |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.03 |
OH |
150.800,00 |
4.524,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
6.592,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
6.592,00 |
| 2020 | 24.2.2.8 | Pemasangan Kabel dalam Pipa Pekerjaan Instalasi Jaringan Bawah Tanah | M | 6.592,00 | Tidak Dipakai | |
1538 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.9 |
Pemasangan PVC untuk Kabel Tanam |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.25 |
OH |
206.800,00 |
51.700,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0 |
OH |
150.800,00 |
0,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
51.700,00 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.33 |
Pipa PVC uk. 2 Pj. 4 m |
0.25 |
batang |
133.400,00 |
33.350,00 |
|
|
|
|
Jumlah |
33.350,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
85.050,00 |
| 2020 | 24.2.2.9 | Pemasangan PVC untuk Kabel Tanam | M | 85.050,00 | Tidak Dipakai | |
1539 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.10 |
Perakitan Panel Penerangan Jalan Umum (PJU) |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.5 |
OH |
206.800,00 |
103.400,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
123.1.1.1.1.23 |
Tukang |
0.5 |
OH |
177.500,00 |
88.750,00 |
|
|
|
|
Jumlah |
267.550,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
267.550,00 |
| 2020 | 24.2.2.10 | Perakitan Panel Penerangan Jalan Umum (PJU) | unit | 267.550,00 | Tidak Dipakai | |
1540 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.2.11 |
Pemasangan Panel Lampu PJU |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.4 |
OH |
206.800,00 |
82.720,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.8 |
OH |
150.800,00 |
120.640,00 |
123.1.1.1.1.23 |
Tukang |
0.4 |
OH |
177.500,00 |
71.000,00 |
|
|
|
|
Jumlah |
274.360,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
274.360,00 |
| 2020 | 24.2.2.11 | Pemasangan Panel Lampu PJU | unit | 274.360,00 | Tidak Dipakai | |