1481 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.24 |
Galian Drainase |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.75 |
OH |
150.800,00 |
113.100,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
118.270,00 |
|
Bahan/Material: |
|
|
|
|
123.2.2.1.3.2 |
Alat Bantu galian Drainase |
1 |
M3 |
2.100,00 |
2.100,00 |
|
|
|
|
Jumlah |
2.100,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
120.370,00 |
| 2020 | 24.1.12.24 | Galian Drainase | M3 | 120.370,00 | Tidak Dipakai | |
1482 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.25 |
Drainase Porous |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0125 |
OH |
206.800,00 |
2.585,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.375 |
OH |
150.800,00 |
56.550,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
59.135,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.8 |
Sirtu (Pasir Batu) |
1.2 |
M3 |
180.100,00 |
216.120,01 |
|
|
|
|
Jumlah |
216.120,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
275.255,01 |
| 2020 | 24.1.12.25 | Drainase Porous | M3 | 275.255,01 | Tidak Dipakai | |
1483 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.26 |
Pemasangan Pipa Pe 12 mm |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.36 |
OH |
236.200,00 |
85.032,00 |
123.1.1.1.1.6 |
Mandor |
0.18 |
OH |
206.800,00 |
37.224,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.44 |
OH |
150.800,00 |
217.152,01 |
123.1.1.1.1.23 |
Tukang |
0.72 |
OH |
177.500,00 |
127.800,01 |
|
|
|
|
Jumlah |
467.208,02 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
467.208,02 |
| 2020 | 24.1.12.26 | Pemasangan Pipa Pe 12 mm | meter | 467.208,02 | Tidak Dipakai | |
1484 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.13.1 |
Pemasangan Pagar Besi Model BRC |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.05 |
OH |
150.800,00 |
158.339,99 |
123.1.1.1.1.23 |
Tukang |
1.05 |
OH |
177.500,00 |
186.374,99 |
|
|
|
|
Jumlah |
344.714,98 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.228 |
Pagar BRC uk panjang 240 cm, tinggi 150 cm |
0.3472 |
unit |
529.200,00 |
183.738,24 |
|
|
|
|
Jumlah |
183.738,24 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
528.453,23 |
| 2020 | 24.1.13.1 | Pemasangan Pagar Besi Model BRC | M2 | 528.453,23 | Tidak Dipakai | |
1485 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.13.2 |
Pemasangan Pintu Swing Ganda / dorong Type BRC/PMG ukuran. (1,2 x 3) meter |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.05 |
OH |
150.800,00 |
158.339,99 |
123.1.1.1.1.23 |
Tukang |
1.05 |
OH |
177.500,00 |
186.374,99 |
|
|
|
|
Jumlah |
344.714,98 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.281 |
Pintu Swing Ganda BRC/PMG |
0.2778 |
unit |
688.900,00 |
191.376,42 |
|
|
|
|
Jumlah |
191.376,42 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
536.091,40 |
| 2020 | 24.1.13.2 | Pemasangan Pintu Swing Ganda / dorong Type BRC/PMG ukuran. (1,2 x 3) meter | M2 | 536.091,40 | Tidak Dipakai | |
1486 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.13.3 |
Pemasangan Pintu Pagar Besi |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.05 |
OH |
150.800,00 |
158.339,99 |
123.1.1.1.1.23 |
Tukang |
1.05 |
OH |
177.500,00 |
186.374,99 |
|
|
|
|
Jumlah |
344.714,98 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.279 |
Pintu Pagar Besi |
1 |
M2 |
2.001.000,00 |
2.001.000,00 |
|
|
|
|
Jumlah |
2.001.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.345.714,98 |
| 2020 | 24.1.13.3 | Pemasangan Pintu Pagar Besi | M2 | 2.345.714,98 | Tidak Dipakai | |
1487 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.13.4 |
Pekerjaan Pembuatan Pagar Besi Model PMG 1.5 m x 2,4 m |
|
panel |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.8 |
OH |
236.200,00 |
188.960,00 |
123.1.1.1.1.6 |
Mandor |
0.4 |
OH |
206.800,00 |
82.720,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
3.2 |
OH |
150.800,00 |
482.560,01 |
123.1.1.1.1.23 |
Tukang |
1.6 |
OH |
177.500,00 |
284.000,00 |
|
|
|
|
Jumlah |
1.038.240,02 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.18 |
Cat Meni Besi |
0.45 |
Kg |
50.700,00 |
22.815,00 |
117.1.1.1.16.12 |
Plat Besi/Baja 244 x 122, tebal 1,8 mm |
22.608 |
Lonjor |
628.500,00 |
14.209.127,88 |
|
|
|
|
Jumlah |
14.231.942,87 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
3.6 |
M2 |
46.900,00 |
168.840,00 |
|
|
|
|
Jumlah |
168.840,00 |
|
|
|
|
Nilai HSPK |
15.439.022,89 |
| 2020 | 24.1.13.4 | Pekerjaan Pembuatan Pagar Besi Model PMG 1.5 m x 2,4 m | panel | 15.439.022,89 | Tidak Dipakai | |
1488 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.13.5 |
Pekerjaan Pembuatan Pagar Besi Model PMG 1,2 m x 2,4 m |
|
panel |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.8 |
OH |
236.200,00 |
188.960,00 |
123.1.1.1.1.6 |
Mandor |
0.4 |
OH |
206.800,00 |
82.720,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
3.2 |
OH |
150.800,00 |
482.560,01 |
123.1.1.1.1.23 |
Tukang |
1.6 |
OH |
177.500,00 |
284.000,00 |
|
|
|
|
Jumlah |
1.038.240,02 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.18 |
Cat Meni Besi |
0.36 |
Kg |
50.700,00 |
18.252,00 |
117.1.1.1.16.12 |
Plat Besi/Baja 244 x 122, tebal 1,8 mm |
22.608 |
Lonjor |
628.500,00 |
14.209.127,88 |
|
|
|
|
Jumlah |
14.227.379,88 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
2.88 |
M2 |
46.900,00 |
135.072,01 |
|
|
|
|
Jumlah |
135.072,01 |
|
|
|
|
Nilai HSPK |
15.400.691,90 |
| 2020 | 24.1.13.5 | Pekerjaan Pembuatan Pagar Besi Model PMG 1,2 m x 2,4 m | panel | 15.400.691,90 | Tidak Dipakai | |
1489 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.13.6 |
Pekerjaan Pembuatan Pagar Besi 1.2 m x 2,25 m |
|
panel |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.8 |
OH |
236.200,00 |
188.960,00 |
123.1.1.1.1.6 |
Mandor |
0.4 |
OH |
206.800,00 |
82.720,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
3.2 |
OH |
150.800,00 |
482.560,01 |
123.1.1.1.1.23 |
Tukang |
1.6 |
OH |
177.500,00 |
284.000,00 |
|
|
|
|
Jumlah |
1.038.240,02 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.18 |
Cat Meni Besi |
0.34 |
Kg |
50.700,00 |
17.238,00 |
117.1.1.1.16.12 |
Plat Besi/Baja 244 x 122, tebal 1,8 mm |
3 |
Lonjor |
628.500,00 |
1.885.500,00 |
|
|
|
|
Jumlah |
1.902.738,00 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
2.67 |
M2 |
46.900,00 |
125.223,00 |
|
|
|
|
Jumlah |
125.223,00 |
|
|
|
|
Nilai HSPK |
3.066.201,02 |
| 2020 | 24.1.13.6 | Pekerjaan Pembuatan Pagar Besi 1.2 m x 2,25 m | panel | 3.066.201,02 | Tidak Dipakai | |
1490 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.13.7 |
Pekerjaan Pembuatan Pagar Besi 1,5 m x 2,25 m |
|
panel |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.8 |
OH |
236.200,00 |
188.960,00 |
123.1.1.1.1.6 |
Mandor |
0.4 |
OH |
206.800,00 |
82.720,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
3.2 |
OH |
150.800,00 |
482.560,01 |
123.1.1.1.1.23 |
Tukang |
1.6 |
OH |
177.500,00 |
284.000,00 |
|
|
|
|
Jumlah |
1.038.240,02 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.18 |
Cat Meni Besi |
0.43 |
Kg |
50.700,00 |
21.801,00 |
117.1.1.1.16.12 |
Plat Besi/Baja 244 x 122, tebal 1,8 mm |
3.6 |
Lonjor |
628.500,00 |
2.262.599,94 |
|
|
|
|
Jumlah |
2.284.400,94 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
3.3375 |
M2 |
46.900,00 |
156.528,75 |
|
|
|
|
Jumlah |
156.528,75 |
|
|
|
|
Nilai HSPK |
3.479.169,71 |
| 2020 | 24.1.13.7 | Pekerjaan Pembuatan Pagar Besi 1,5 m x 2,25 m | panel | 3.479.169,71 | Tidak Dipakai | |
1491 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.14.1 |
Pekerjaan Besi Pipa Galvanis 1/2 " (Medium) |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.08 |
OH |
150.800,00 |
12.064,00 |
123.1.1.1.1.23 |
Tukang |
0.04 |
OH |
177.500,00 |
7.100,00 |
|
|
|
|
Jumlah |
25.956,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.501 |
Besi Pipa Galvanis Medium |
1.02 |
batang |
240.200,00 |
245.004,00 |
|
|
|
|
Jumlah |
245.004,00 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
0.04 |
M2 |
46.900,00 |
1.876,00 |
|
|
|
|
Jumlah |
1.876,00 |
|
|
|
|
Nilai HSPK |
272.835,99 |
| 2020 | 24.1.14.1 | Pekerjaan Besi Pipa Galvanis 1/2 " (Medium) | meter | 272.835,99 | Tidak Dipakai | |
1492 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.14.2 |
Pekerjaan Besi Pipa Galvanis 3/4 " (Medium) |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.08 |
OH |
150.800,00 |
12.064,00 |
123.1.1.1.1.23 |
Tukang |
0.04 |
OH |
177.500,00 |
7.100,00 |
|
|
|
|
Jumlah |
25.956,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
0.06 |
M2 |
46.900,00 |
2.814,00 |
|
|
|
|
Jumlah |
2.814,00 |
|
|
|
|
Nilai HSPK |
28.770,00 |
| 2020 | 24.1.14.2 | Pekerjaan Besi Pipa Galvanis 3/4 " (Medium) | meter | 28.770,00 | Tidak Dipakai | |
1493 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.14.3 |
Pekerjaan Besi Pipa Galvanis 1 " (Medium) |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.08 |
OH |
150.800,00 |
12.064,00 |
123.1.1.1.1.23 |
Tukang |
0.04 |
OH |
177.500,00 |
7.100,00 |
|
|
|
|
Jumlah |
25.956,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
0.08 |
M2 |
46.900,00 |
3.752,00 |
|
|
|
|
Jumlah |
3.752,00 |
|
|
|
|
Nilai HSPK |
29.708,00 |
| 2020 | 24.1.14.3 | Pekerjaan Besi Pipa Galvanis 1 " (Medium) | meter | 29.708,00 | Tidak Dipakai | |
1494 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.14.4 |
Pekerjaan Besi Pipa Galvanis 1 1/4 " (Medium) |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.04 |
OH |
236.200,00 |
9.448,00 |
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.16 |
OH |
150.800,00 |
24.128,00 |
123.1.1.1.1.23 |
Tukang |
0.08 |
OH |
177.500,00 |
14.200,00 |
|
|
|
|
Jumlah |
51.912,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
0.1 |
M2 |
46.900,00 |
4.690,00 |
|
|
|
|
Jumlah |
4.690,00 |
|
|
|
|
Nilai HSPK |
56.602,00 |
| 2020 | 24.1.14.4 | Pekerjaan Besi Pipa Galvanis 1 1/4 " (Medium) | meter | 56.602,00 | Tidak Dipakai | |
1495 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.14.5 |
Pekerjaan Besi Pipa Galvanis 2 " (Medium) |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.04 |
OH |
236.200,00 |
9.448,00 |
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.16 |
OH |
150.800,00 |
24.128,00 |
123.1.1.1.1.23 |
Tukang |
0.08 |
OH |
177.500,00 |
14.200,00 |
|
|
|
|
Jumlah |
51.912,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
0.16 |
M2 |
46.900,00 |
7.504,00 |
|
|
|
|
Jumlah |
7.504,00 |
|
|
|
|
Nilai HSPK |
59.416,00 |
| 2020 | 24.1.14.5 | Pekerjaan Besi Pipa Galvanis 2 " (Medium) | meter | 59.416,00 | Tidak Dipakai | |
1496 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.14.6 |
Pekerjaan Besi Pipa Galvanis 2 1/2 " (Medium) |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.046 |
OH |
236.200,00 |
10.865,20 |
123.1.1.1.1.6 |
Mandor |
0.023 |
OH |
206.800,00 |
4.756,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.184 |
OH |
150.800,00 |
27.747,20 |
123.1.1.1.1.23 |
Tukang |
0.092 |
OH |
177.500,00 |
16.330,00 |
|
|
|
|
Jumlah |
59.698,80 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
0.2 |
M2 |
46.900,00 |
9.380,00 |
|
|
|
|
Jumlah |
9.380,00 |
|
|
|
|
Nilai HSPK |
69.078,80 |
| 2020 | 24.1.14.6 | Pekerjaan Besi Pipa Galvanis 2 1/2 " (Medium) | meter | 69.078,80 | Tidak Dipakai | |
1497 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.14.7 |
Pekerjaan Besi Pipa Galvanis 3 " (Medium) |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.06 |
OH |
236.200,00 |
14.172,00 |
123.1.1.1.1.6 |
Mandor |
0.03 |
OH |
206.800,00 |
6.204,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.24 |
OH |
150.800,00 |
36.192,00 |
123.1.1.1.1.23 |
Tukang |
0.12 |
OH |
177.500,00 |
21.300,00 |
|
|
|
|
Jumlah |
77.868,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
0.24 |
M2 |
46.900,00 |
11.256,00 |
|
|
|
|
Jumlah |
11.256,00 |
|
|
|
|
Nilai HSPK |
89.124,00 |
| 2020 | 24.1.14.7 | Pekerjaan Besi Pipa Galvanis 3 " (Medium) | meter | 89.124,00 | Tidak Dipakai | |
1498 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.14.8 |
Pekerjaan Besi Pipa Galvanis 4 " (Medium) |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.08 |
OH |
236.200,00 |
18.896,00 |
123.1.1.1.1.6 |
Mandor |
0.04 |
OH |
206.800,00 |
8.272,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.32 |
OH |
150.800,00 |
48.256,00 |
123.1.1.1.1.23 |
Tukang |
0.16 |
OH |
177.500,00 |
28.400,00 |
|
|
|
|
Jumlah |
103.824,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
0.32 |
M2 |
46.900,00 |
15.008,00 |
|
|
|
|
Jumlah |
15.008,00 |
|
|
|
|
Nilai HSPK |
118.832,00 |
| 2020 | 24.1.14.8 | Pekerjaan Besi Pipa Galvanis 4 " (Medium) | meter | 118.832,00 | Tidak Dipakai | |
1499 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.14.9 |
Pekerjaan Besi Pipa Galvanis 5 " (Medium) |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.1 |
OH |
236.200,00 |
23.620,00 |
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
129.780,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
0.4 |
M2 |
46.900,00 |
18.760,00 |
|
|
|
|
Jumlah |
18.760,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
148.540,00 |
| 2020 | 24.1.14.9 | Pekerjaan Besi Pipa Galvanis 5 " (Medium) | meter | 148.540,00 | Tidak Dipakai | |
1500 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.14.10 |
Pekerjaan Besi Pipa Galvanis 6 " (Medium) |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.12 |
OH |
236.200,00 |
28.344,00 |
123.1.1.1.1.6 |
Mandor |
0.06 |
OH |
206.800,00 |
12.408,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.48 |
OH |
150.800,00 |
72.384,00 |
123.1.1.1.1.23 |
Tukang |
0.24 |
OH |
177.500,00 |
42.600,00 |
|
|
|
|
Jumlah |
155.736,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
0.48 |
M2 |
46.900,00 |
22.512,00 |
|
|
|
|
Jumlah |
22.512,00 |
|
|
|
|
Nilai HSPK |
178.248,00 |
| 2020 | 24.1.14.10 | Pekerjaan Besi Pipa Galvanis 6 " (Medium) | meter | 178.248,00 | Tidak Dipakai | |