1461 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.4 |
Pemasangan Dasar Saluran R.10 (1/2 lingkaran) |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0238 |
OH |
206.800,00 |
4.921,84 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.475 |
OH |
150.800,00 |
71.630,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
76.551,84 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.454 |
Got Talang R. 10 (1/2 Lingkaran) |
1 |
buah |
39.100,00 |
39.100,00 |
|
|
|
|
Jumlah |
39.100,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
115.651,84 |
| 2020 | 24.1.12.4 | Pemasangan Dasar Saluran R.10 (1/2 lingkaran) | meter | 115.651,84 | Tidak Dipakai | |
1462 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.5 |
Pemasangan Dasar Saluran R.15 (1/2 lingkaran) |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.019 |
OH |
206.800,00 |
3.929,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.38 |
OH |
150.800,00 |
57.304,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
61.233,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.455 |
Got Talang R.15 (1/2 lingkaran) |
1 |
buah |
44.700,00 |
44.700,00 |
|
|
|
|
Jumlah |
44.700,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
105.933,20 |
| 2020 | 24.1.12.5 | Pemasangan Dasar Saluran R.15 (1/2 lingkaran) | meter | 105.933,20 | Tidak Dipakai | |
1463 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.6 |
Pemasangan Dasar Saluran R.25 (1/2 lingkaran) |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0152 |
OH |
206.800,00 |
3.143,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.304 |
OH |
150.800,00 |
45.843,20 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
48.986,56 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.456 |
Got Talang R.25 (1/2 lingkaran) |
1 |
buah |
48.900,00 |
48.900,00 |
|
|
|
|
Jumlah |
48.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
97.886,56 |
| 2020 | 24.1.12.6 | Pemasangan Dasar Saluran R.25 (1/2 lingkaran) | meter | 97.886,56 | Tidak Dipakai | |
1464 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.7 |
Pemasangan Saluran Pipa diameter ½'' |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.006 |
OH |
236.200,00 |
1.417,20 |
123.1.1.1.1.6 |
Mandor |
0.0018 |
OH |
206.800,00 |
372,24 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.036 |
OH |
150.800,00 |
5.428,80 |
123.1.1.1.1.23 |
Tukang |
0.06 |
OH |
177.500,00 |
10.650,00 |
|
|
|
|
Jumlah |
17.868,24 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.32 |
Pipa PVC Uk. 1/2 Pj. 4 m |
0.3 |
batang |
30.700,00 |
9.210,00 |
|
|
|
|
Jumlah |
9.210,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
27.078,24 |
| 2020 | 24.1.12.7 | Pemasangan Saluran Pipa diameter ½'' | meter | 27.078,24 | Tidak Dipakai | |
1465 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.8 |
Pemasangan Saluran Pipa diameter ¾'' |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.006 |
OH |
236.200,00 |
1.417,20 |
123.1.1.1.1.6 |
Mandor |
0.0018 |
OH |
206.800,00 |
372,24 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.036 |
OH |
150.800,00 |
5.428,80 |
123.1.1.1.1.23 |
Tukang |
0.06 |
OH |
177.500,00 |
10.650,00 |
|
|
|
|
Jumlah |
17.868,24 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.35 |
Pipa PVC Uk. 3/4 Pj. 4m |
0.3 |
batang |
38.700,00 |
11.610,00 |
|
|
|
|
Jumlah |
11.610,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
29.478,24 |
| 2020 | 24.1.12.8 | Pemasangan Saluran Pipa diameter ¾'' | meter | 29.478,24 | Tidak Dipakai | |
1466 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.9 |
Pemasangan Saluran Pipa diameter 1'' |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.006 |
OH |
236.200,00 |
1.417,20 |
123.1.1.1.1.6 |
Mandor |
0.0018 |
OH |
206.800,00 |
372,24 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.036 |
OH |
150.800,00 |
5.428,80 |
123.1.1.1.1.23 |
Tukang |
0.06 |
OH |
177.500,00 |
10.650,00 |
|
|
|
|
Jumlah |
17.868,24 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.31 |
Pipa PVC Uk. 1 Pj. 4 m |
0.3 |
batang |
44.100,00 |
13.230,00 |
|
|
|
|
Jumlah |
13.230,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
31.098,24 |
| 2020 | 24.1.12.9 | Pemasangan Saluran Pipa diameter 1'' | meter | 31.098,24 | Tidak Dipakai | |
1467 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.10 |
Pemasangan Saluran Pipa diameter 1 ½'' |
|
meter |
|
|
|
Upah: |
|
|
|
|
117.2.2.6.1.15 |
Pipa PVC uk. 1 1/2 inchi Pj. 4 m |
0.3 |
batang |
40.100,00 |
12.030,00 |
123.1.1.1.1.5 |
Kepala Tukang |
0.006 |
OH |
236.200,00 |
1.417,20 |
123.1.1.1.1.6 |
Mandor |
0.0018 |
OH |
206.800,00 |
372,24 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.036 |
OH |
150.800,00 |
5.428,80 |
123.1.1.1.1.23 |
Tukang |
0.06 |
OH |
177.500,00 |
10.650,00 |
|
|
|
|
Jumlah |
29.898,24 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
29.898,24 |
| 2020 | 24.1.12.10 | Pemasangan Saluran Pipa diameter 1 ½'' | meter | 29.898,24 | Tidak Dipakai | |
1468 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.11 |
Pemasangan Saluran Pipa diameter 2'' |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.009 |
OH |
236.200,00 |
2.125,80 |
123.1.1.1.1.6 |
Mandor |
0.0027 |
OH |
206.800,00 |
558,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.054 |
OH |
150.800,00 |
8.143,20 |
123.1.1.1.1.23 |
Tukang |
0.09 |
OH |
177.500,00 |
15.975,00 |
|
|
|
|
Jumlah |
26.802,36 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.18 |
Pipa PVC uk.4 inchi Pj.4 m |
0.3 |
batang |
93.400,00 |
28.020,00 |
|
|
|
|
Jumlah |
28.020,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
54.822,36 |
| 2020 | 24.1.12.11 | Pemasangan Saluran Pipa diameter 2'' | meter | 54.822,36 | Tidak Dipakai | |
1469 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.12 |
Pemasangan Saluran Pipa diameter 3'' |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0135 |
OH |
236.200,00 |
3.188,70 |
123.1.1.1.1.6 |
Mandor |
0.0041 |
OH |
206.800,00 |
847,88 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.081 |
OH |
150.800,00 |
12.214,80 |
123.1.1.1.1.23 |
Tukang |
0.135 |
OH |
177.500,00 |
23.962,50 |
|
|
|
|
Jumlah |
40.213,88 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.17 |
Pipa PVC uk. 3 inchi Pj. 4 m |
0.3 |
batang |
73.400,00 |
22.020,00 |
|
|
|
|
Jumlah |
22.020,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
62.233,88 |
| 2020 | 24.1.12.12 | Pemasangan Saluran Pipa diameter 3'' | meter | 62.233,88 | Tidak Dipakai | |
1470 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.13 |
Pemasangan Saluran Pipa diameter 4'' |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0135 |
OH |
236.200,00 |
3.188,70 |
123.1.1.1.1.6 |
Mandor |
0.0041 |
OH |
206.800,00 |
847,88 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.081 |
OH |
150.800,00 |
12.214,80 |
123.1.1.1.1.23 |
Tukang |
0.135 |
OH |
177.500,00 |
23.962,50 |
|
|
|
|
Jumlah |
40.213,88 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.18 |
Pipa PVC uk.4 inchi Pj.4 m |
0.3 |
batang |
93.400,00 |
28.020,00 |
|
|
|
|
Jumlah |
28.020,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
68.233,88 |
| 2020 | 24.1.12.13 | Pemasangan Saluran Pipa diameter 4'' | meter | 68.233,88 | Tidak Dipakai | |
1471 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.14 |
Pemasangan Saluran Pipa diameter 5'' |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0135 |
OH |
236.200,00 |
3.188,70 |
123.1.1.1.1.6 |
Mandor |
0.0041 |
OH |
206.800,00 |
847,88 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.081 |
OH |
150.800,00 |
12.214,80 |
123.1.1.1.1.23 |
Tukang |
0.135 |
OH |
177.500,00 |
23.962,50 |
|
|
|
|
Jumlah |
40.213,88 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.19 |
Pipa PVC uk.5 inchi Pj.6 m |
0.2 |
batang |
386.900,00 |
77.380,00 |
|
|
|
|
Jumlah |
77.380,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
117.593,88 |
| 2020 | 24.1.12.14 | Pemasangan Saluran Pipa diameter 5'' | meter | 117.593,88 | Tidak Dipakai | |
1472 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.15 |
Pemasangan Saluran Pipa diameter 6'' |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0135 |
OH |
236.200,00 |
3.188,70 |
123.1.1.1.1.6 |
Mandor |
0.0041 |
OH |
206.800,00 |
847,88 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.081 |
OH |
150.800,00 |
12.214,80 |
123.1.1.1.1.23 |
Tukang |
0.135 |
OH |
177.500,00 |
23.962,50 |
|
|
|
|
Jumlah |
40.213,88 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
40.213,88 |
| 2020 | 24.1.12.15 | Pemasangan Saluran Pipa diameter 6'' | meter | 40.213,88 | Tidak Dipakai | |
1473 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.16 |
Pemasangan Kran Air |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.03 |
OH |
236.200,00 |
7.086,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0 |
OH |
150.800,00 |
0,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
33.711,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.142 |
Kran Air Dia. 3/4 |
1 |
buah |
55.800,00 |
55.800,00 |
|
|
|
|
Jumlah |
55.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
89.511,00 |
| 2020 | 24.1.12.16 | Pemasangan Kran Air | buah | 89.511,00 | Tidak Dipakai | |
1474 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.17 |
Kloset Jongkok Porselen |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.16 |
OH |
236.200,00 |
37.792,00 |
123.1.1.1.1.6 |
Mandor |
0.16 |
OH |
206.800,00 |
33.088,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.5 |
OH |
150.800,00 |
226.200,00 |
123.1.1.1.1.23 |
Tukang |
1.5 |
OH |
177.500,00 |
266.250,00 |
|
|
|
|
Jumlah |
563.330,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
6 |
Kg |
2.600,00 |
15.600,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.01 |
M3 |
180.100,00 |
1.801,00 |
117.1.1.12.1.140 |
Kloset Jongkok Porselin Standart |
1 |
buah |
576.300,00 |
576.300,00 |
|
|
|
|
Jumlah |
593.701,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.157.031,00 |
| 2020 | 24.1.12.17 | Kloset Jongkok Porselen | buah | 1.157.031,00 | Tidak Dipakai | |
1475 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.18 |
Kloset Duduk Porselen |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.16 |
OH |
236.200,00 |
37.792,00 |
123.1.1.1.1.6 |
Mandor |
0.16 |
OH |
206.800,00 |
33.088,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.1 |
OH |
150.800,00 |
165.880,00 |
123.1.1.1.1.23 |
Tukang |
1.1 |
OH |
177.500,00 |
195.250,00 |
|
|
|
|
Jumlah |
432.010,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
6 |
Kg |
2.600,00 |
15.600,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.01 |
M3 |
180.100,00 |
1.801,00 |
117.1.1.12.1.135 |
Closet Duduk Porselin ( komplit) |
1 |
buah |
4.190.100,00 |
4.190.100,00 |
|
|
|
|
Jumlah |
4.207.501,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
4.639.511,01 |
| 2020 | 24.1.12.18 | Kloset Duduk Porselen | buah | 4.639.511,01 | Tidak Dipakai | |
1476 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.19 |
Pemasangan Wastafel |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.15 |
OH |
236.200,00 |
35.430,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.2 |
OH |
150.800,00 |
180.960,01 |
123.1.1.1.1.23 |
Tukang |
1.45 |
OH |
177.500,00 |
257.375,01 |
|
|
|
|
Jumlah |
494.445,02 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
6 |
Kg |
2.600,00 |
15.600,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.01 |
M3 |
180.100,00 |
1.801,00 |
117.1.1.12.1.166 |
Wastafel |
0.12 |
buah |
557.300,00 |
66.876,00 |
|
|
|
|
Jumlah |
84.277,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
578.722,02 |
| 2020 | 24.1.12.19 | Pemasangan Wastafel | buah | 578.722,02 | Tidak Dipakai | |
1477 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.20 |
Pemasangan Lubang Drainase |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.003 |
OH |
236.200,00 |
708,60 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.06 |
OH |
150.800,00 |
9.048,00 |
123.1.1.1.1.23 |
Tukang |
0.03 |
OH |
177.500,00 |
5.325,00 |
|
|
|
|
Jumlah |
15.598,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.218 |
Ijuk |
0.05 |
Kg |
20.100,00 |
1.005,00 |
117.2.2.6.1.16 |
Pipa PVC uk. 2 inchi Pj. 4 m |
0.125 |
batang |
50.700,00 |
6.337,50 |
|
|
|
|
Jumlah |
7.342,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
22.941,10 |
| 2020 | 24.1.12.20 | Pemasangan Lubang Drainase | buah | 22.941,10 | Tidak Dipakai | |
1478 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.21 |
Pembersihan Saluran Kedalaman s/d 1m |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.008 |
OH |
206.800,00 |
1.654,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
9.194,40 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
9.194,40 |
| 2020 | 24.1.12.21 | Pembersihan Saluran Kedalaman s/d 1m | M2 | 9.194,40 | Tidak Dipakai | |
1479 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.22 |
Mengangkut material Disposal/buangan saluran |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.008 |
OH |
206.800,00 |
1.654,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.83 |
OH |
150.800,00 |
125.164,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
126.818,40 |
|
Bahan/Material: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.02 |
jam |
513.600,00 |
10.272,00 |
|
|
|
|
Jumlah |
10.272,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
137.090,40 |
| 2020 | 24.1.12.22 | Mengangkut material Disposal/buangan saluran | M3 | 137.090,40 | Tidak Dipakai | |
1480 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.23 |
Pengerukan Lumpur (Gorong-gorong) manual |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.5 |
OH |
150.800,00 |
226.200,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
236.540,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
236.540,00 |
| 2020 | 24.1.12.23 | Pengerukan Lumpur (Gorong-gorong) manual | M3 | 236.540,00 | Tidak Dipakai | |